Crawford County, Missouri Building Permit Guide

To get a building permit in Crawford County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Crawford County lists no building or zoning office; septic permits come from the Crawford County Health Department in Steelville, floodplain technical help from the Meramec Regional Planning Commission, and Cuba, Bourbon and Sullivan permit their own work.

Authority: Crawford County Health Department (septic)Rules: County onsite wastewater ordinancePhone: 573-775-2555
County building office
None listed
Septic permits
Crawford County Health Department
Floodplain technical help
Meramec Regional Planning Commission
County Commission
Tuesdays, 9 a.m., Steelville

Crawford County’s government in Steelville lists no building, planning or zoning office, and its published sources describe no county building permit for unincorporated land. Septic systems are the exception: the Crawford County Health Department, 202 W. Main Street, Steelville (573-775-2555), permits them under the county’s own onsite wastewater ordinance. The county contracts with the Meramec Regional Planning Commission for technical help in administering its floodplain program, and Cuba, Bourbon and Sullivan run their own building permits.

What needs a permit outside the cities

Permit needed

  • New or repaired onsite septic systems: Crawford County Health Department
  • Building, filling or other development in the mapped floodplain: county floodplain program

No county office

  • No building department among the county offices
  • No planning and zoning office among the county offices

The floodplain rule reaches county projects too: in June 2025 a commissioner reported that a lean-to planned at a county road shed was waiting for FEMA approval because the site is in the floodplain.

Short on time to read all of this?

Get a free quote →

Who to contact in Crawford County

The County Commission meets every Tuesday at 9 a.m. at the Crawford County Courthouse, 302 W. Main Street, Steelville (573-775-2376), and posts its agendas and minutes on the county website. Items for an agenda must be requested from the presiding commissioner by 4:30 p.m. the Friday before. The County Surveyor (573-241-2491) offers plot plans and stake-outs. The incorporated places below permit work inside their limits; populations are Census Bureau Vintage 2025 estimates for the part of each place in Crawford County.

Who permits building work in Crawford County’s cities and villages
PlaceWho permits building work
Cuba (3,288)City building official, City Hall, 202 N. Smith Street; 573-885-7432. The City Code adopts the 2009 International Codes and the 2008 National Electrical Code, and the building official issues certificates of occupancy
Bourbon (1,544)The City’s Administrative Officer issues building permits, required before any building or addition is started, and the City Clerk collects the filing fee: $100 for a mobile home and $15 to $100 for home alterations by size. A residence must be at least 800 sq ft
Sullivan (1,513 here; 5,429 in Franklin County)City Building and Code Department at City Hall; building inspector 573-468-8999. The Sullivan Fire Protection District requires its own permit for commercial construction
Steelville (1,447)A City Inspector issues occupancy permits: homes that are bought or rented need an inspection and permit before City utilities are turned on (City occupancy checklist, March 2024). The city also has Planning and Zoning and Appeals boards; City Hall, 895 Frisco Street, 573-775-2815
Leasburg (318), West Sullivan (281), St. Cloud (39)The published sources do not say; ask the village clerk

Not sure this scope needs a permit?

Get a free quote →

Septic permits

The Crawford County Health Department is the onsite wastewater permitting authority for the county under a county ordinance that can add requirements to the state’s minimum construction standards, so contact the department before installing or repairing a septic system. The County Commission approved the list of Crawford County On-Site Sewage Board members in May 2026, to be reviewed annually.

Fees

The county posts no building permit fee schedule, and septic permit charges come from the Health Department. In the cities, Bourbon’s code sets these filing fees:

City of Bourbon building permit filing fees (City Code Section 500.070)
PermitFee
Mobile home$100
Home alteration under 500 / 501–1,499 / 1,500 sq ft or more$15 / $50 / $100
Commercial alteration, same size bands$75 / $150 / $250
Residential deck, porch or stairs$15
Portable storage building over 200 sq ft, or portable carport$15

Rather talk it over?

Call 1-855-478-4290 →

How to build in unincorporated Crawford County

1. Confirm the property is outside city limits

Inside Cuba, Bourbon, Sullivan or Steelville, follow the city’s rules.

2. Get the septic permit

Contact the Crawford County Health Department before installing or repairing an onsite system.

3. Check the floodplain

If the site may be in the mapped floodplain, contact the Meramec Regional Planning Commission (573-265-2993), which gives the county technical assistance with floodplain administration, before building or filling.

4. Mark the lot

For a plot plan or stake-out, the County Surveyor can help.

Floodplain and data center notes

Floodplain: Crawford County takes part in the National Flood Insurance Program, with flood maps dated May 20, 2010, as do Bourbon, Cuba, Leasburg, Steelville and Sullivan. The Commission signed a contract in February 2025 for the Meramec Regional Planning Commission to continue providing technical assistance in administering the floodplain, and noted in April 2026 that the agreement’s rates would rise. The commission’s office is at 4 Industrial Drive, St. James, in neighboring Phelps County.

Data centers: the Commission held a long discussion at its July 7, 2026 meeting on what the county would do if a data center came to Crawford County; the minutes record the discussion but no action.

Rather not deal with the Crawford County building department?

Get a free quote →

Missouri building code

Missouri has no mandatory statewide building code for private construction: a county, fire protection district or municipality may adopt one (usually by reference under RSMo 67.280), and in parts of the state none has. Building codes in Missouri

Crawford County permit FAQs

Does Crawford County issue building permits?

The county lists no building, planning or zoning office, and its published sources describe no county building permit. Septic and floodplain rules still apply outside the cities.

Who issues septic permits in Crawford County?

The Crawford County Health Department, 202 W. Main Street, Steelville (573-775-2555), under the county’s onsite wastewater ordinance.

Who handles floodplain permits?

Contact the Meramec Regional Planning Commission (573-265-2993), which gives the county technical assistance with floodplain administration under contract.

Who issues building permits in Cuba?

The City of Cuba’s building official, under the 2009 International Codes; City Hall is at 202 N. Smith Street (573-885-7432).

When does the County Commission meet?

Every Tuesday at 9 a.m. at the courthouse in Steelville.

Want this handled start to finish?

Get a free quote →

Crawford County permit search and official resources

Simplify Crawford County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Inspections are where schedules slip.

Get a free quote →

Alliance Permitting is a permit documentation and submission company in Missouri. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Crawford County sooner?

Let Alliance prepare, file, and track your Crawford County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Crawford County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.