Marshall County, Mississippi Building Permit Guide

Marshall County is governed from Holly Springs; Holly Springs and Byhalia run their own permit offices, and the county permits construction on unincorporated land.

Authority: Marshall County Administrator (Board of Supervisors, unincorporated areas)Towns: Holly Springs, Byhalia, Potts CampPhone: 662-252-9067
County Administrator
P.O. Box 219, Holly Springs, 662-252-9067
Holly Springs
Zoning Department, 662-252-4280 Ext. 1209
Byhalia
Town Hall, 662-838-2135
Septic
State Department of Health, 855-220-0192

Marshall County has three incorporated places. Holly Springs permits construction through its Zoning Department and building inspector, and Byhalia through its building official under the 2018 International Building Code. For unincorporated land, the county contact is the County Administrator’s office in Holly Springs (662-252-9067).

Who issues building permits in Marshall County?

The Board of Supervisors governs unincorporated Marshall County, where state law (Miss. Code §19-5-9(11)) requires a county permit for construction. The Secretary of State’s county directory lists these county offices in Holly Springs:

Marshall County offices (Secretary of State county directory)
OfficeContact
County AdministratorP.O. Box 219, Holly Springs, MS 38634; 662-252-9067
Board of Supervisors662-252-7903
Chancery Clerk (land records, Board minutes)P.O. Box 219, Holly Springs, MS 38635; 662-252-4431

Short on time to read all of this?

Get a free quote →

Cities and towns in Marshall County

Who permits inside each incorporated place (Census 2025 population)
PlaceWho issues building permits
Holly Springs (city, 6,402)City Zoning Department (Zoning Director, 662-252-4280 Ext. 1209), which keeps all permit records, supervises the building inspector and handles floodplain applications; building, fence, sign and floodplain development permit forms are on the City’s site
Byhalia (town, 1,412)The Town’s building official approves new construction and remodeling, reviews plans under the 2018 International Building Code and 2020 electrical code, inspects and issues use and occupancy permits for commercial and industrial buildings; Town Hall, 225 MS-309, 662-838-2135, weekdays 8:00 a.m.–5:00 p.m.
Potts Camp (town, 393)The published sources do not say; ask the town clerk

Not sure this scope needs a permit?

Get a free quote →

How to start a project in Marshall County: 5 steps

1. Find the jurisdiction

Check whether the parcel is inside Holly Springs, Byhalia or Potts Camp, or in the unincorporated county.

2. Inside Holly Springs

File the City Building Permit with the Zoning Department; zoning, fire, utilities and public works sign off before the permit is issued.

3. Inside Byhalia

Call Town Hall (662-838-2135); the Town is updating its codes and ordinances and asks applicants to call for the current version.

4. Unincorporated county

Contact the County Administrator’s office (662-252-9067) for the county permit before work begins, with your contractor’s State Board of Contractors licence number to hand.

5. Septic

Where no sewer line is available, the State Department of Health must approve the septic system; apply online.

Local rules that matter in Marshall County

Holly Springs permits: the City’s building permit asks for the valuation of the work, heated and unheated area, bedrooms and bathrooms, zoning and whether the site is in a special flood hazard area or needs fire sprinklers. It lapses if work does not start within six months or stops for a year, and the building must pass the City building inspector’s and electrical inspector’s inspections before anyone uses or occupies it. Holly Springs also has a Historic Preservation Commission with its own procedures.

Rather talk it over?

Call 1-855-478-4290 →

Byhalia flood and stormwater: the Town’s storm water and flood plan coordinator checks new and existing structures against its flood plans.

Septic systems: individual onsite wastewater systems anywhere in the county are permitted by the Mississippi State Department of Health (call center 855-220-0192).

Mississippi building code

Some work is exempt statewide: farm structures once the owner files an affidavit (Mississippi Code §17-2-7), and manufactured housing built to federal standards, certain industrial and utility facilities, buildings on non-public fairgrounds and hunting or fishing camps with an owner’s affidavit (§17-2-9). None of these exemptions reaches floodplain rules. The state minimum codes are the Mississippi Building Code and Mississippi Residential Code, the residential code drawn from the 2021 International Residential Code. How building codes apply in Mississippi

Rather not deal with the Marshall County building department?

Get a free quote →

Official Marshall County resources

Want this handled start to finish?

Get a free quote →

Marshall County permit FAQs

Who issues building permits in Marshall County?

Holly Springs’ Zoning Department inside Holly Springs, Byhalia’s building official inside Byhalia, and the county for unincorporated land (County Administrator, 662-252-9067).

Which building code does Byhalia use?

The Town’s building official reviews plans under the 2018 International Building Code and the 2020 electrical code.

How long is a Holly Springs building permit valid?

It becomes void if work does not begin within six months or is suspended for a year.

Who approves a septic system?

The State Department of Health permits onsite wastewater systems throughout Marshall County; its call center number is 855-220-0192.

Simplify Marshall County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Inspections are where schedules slip.

Get a free quote →

Alliance Permitting is a permit documentation and submission company in Mississippi. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Marshall County sooner?

Let Alliance prepare, file, and track your Marshall County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Marshall County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.