In the City of Easthampton, the Building Department run by the Building Commissioner at the Municipal Building, 50 Payson Avenue, issues building, electrical, plumbing, gas and trench permits and annual certificates of inspection. Contractors must apply through PermitEyes; paper applications need prior approval and carry a $25 processing fee. Residential work costs $7.50 per $1,000 of cost, with a $750 minimum for a new house, under fee schedules effective October 30, 2025, and new buildings must meet the Specialized energy code, which the City Council made the city’s minimum energy code from January 1, 2025.
What work requires a building permit in Easthampton?
The city’s FAQ repeats the state rule (780 CMR 105.1): a permit is needed to construct, reconstruct, alter, repair, remove or demolish a building or structure, to change its use or occupancy, or to install or alter equipment the code regulates. The residential fee schedule lists the jobs the department actually prices, and the FAQ adds the city’s own thresholds for sheds, fences and pools.
Building permit
- New houses, foundations and additions
- Detached garages, sheds, gazebos and pergolas over 200 sq ft
- Renovations, kitchen and bath remodels, basement or attic conversions
- Decks and porches; re-roofing, re-siding and re-decking
- Replacement windows and doors; insulation
- Pools, pool houses and pool decks (above-ground pools also need an electrical permit)
- Solar systems, fire alarms and sprinklers
- Sheet metal, ductwork and mechanical work; chimneys and stoves
- Demolition
Placement application only
- Sheds under 200 sq ft: no building permit, but a fence/shed placement application and the setbacks in Zoning Ordinance section 6.7
- Fences 6 feet and under: placement application and the fence ordinance (section 6.9)
The two city documents set the fence threshold differently: the FAQ says every fence above 6 feet needs a building permit, while the October 2025 residential fee schedule lists “fences over 7’ high”. For a fence between 6 and 7 feet, the FAQ is the stricter of the two. Decks count as part of the building they are attached to and must meet the setbacks in Table 6.1 of the zoning ordinance.
What Easthampton decides and what the state holds
The building code is the state’s 780 CMR, from the Board of Building Regulations and Standards, and the department enforces it together with the city’s Zoning Ordinance. The City Council sets the local layers by ordinance: the Specialized energy code (Section 4-2.1), the demolition delay ordinance in Chapter 4, and the Wetlands Protection Ordinance it passed on May 20, 2026. Planning, Public Works, the City Engineer and the Fire Department may each have to approve a project before a permit issues.
Easthampton building department: who handles permitting
David Gardner is the Building Commissioner. The wire inspector and the plumbing and gas inspector each take their own inspection calls, at the numbers printed on their fee sheets. Status questions are answered first in the online portal; general office questions go to buildinginspector@easthamptonma.gov.
Short on time to read all of this?
Get a free quote →| Item | Details |
|---|---|
| Office | Municipal Building, 50 Payson Avenue, Easthampton, MA 01027 |
| Phone; fax | 413-529-1400 ext. 402; 413-529-1417 |
| Hours | Monday to Thursday, 7:30 a.m. to 5:00 p.m.; closed Fridays |
| Wire inspector | 413-563-7153 |
| Plumbing and gas inspector | 413-265-6290; plumbing@easthamptonma.gov |
| Online filing | PermitEyes (Easthampton) |
Easthampton permit types and application documents
Residential permits
To file, register in PermitEyes with a phone number and email address (contractors can add their licenses to the profile), then choose “New Application”. Every application needs the workers’ compensation insurance affidavit; owners doing their own work add the homeowner’s exemption affidavit. The department also posts a printable plot plan sketch, a prescriptive deck construction guide and guidance for mini-split installations. Once the permit is approved, the applicant prints it and posts it at the site. A building permit expires after 180 days, though the department may grant an extension.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial work, which for fees includes apartment buildings of three or more units, must be submitted online with digital plans. It is charged $10 per $1,000 of cost: at least $2,500 and at most $150,000 for a new principal building, and at least $100 for additions, alterations, accessory structures, roofing, pools, solar, fire protection, mechanical work, conveyance systems, signs and demolition. A periodic certificate of inspection costs $75 for churches and daycares and $150 for restaurants, multifamily buildings, hotels and boarding houses; a certificate of occupancy for a new business or change of use is $75.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning: the Planning Department’s fees include $150 for a variance or special permit, $75 for an administrative appeal, and site plan review at $750 plus $100 per unit above four for residential projects of four or more units, or $750 plus $100 per 5,000 square feet for commercial projects adding more than 5,000 square feet of lot coverage. Land disturbance is $100 under an acre and $300 for an acre or more.
- Wetlands: the Conservation Commission applies the state Act and, for permits submitted from May 21, 2026, the city’s new Wetlands Protection Ordinance (filed on its own Form E). It also handles stormwater management permits and tree-cutting applications.
- Historic buildings: demolishing a building 50 or more years old goes through the Historical Commission first.
- Septic: on-site sewage systems are a Board of Health matter under Title 5; the Health Department is in the same Municipal Building at extension 430.
Not sure this scope needs a permit?
Get a free quote →Easthampton building permit fees
All five of the department’s fee sheets (residential, commercial, miscellaneous, electrical, and gas and plumbing) are dated effective October 30, 2025. Residential building work is a single rate of $7.50 per $1,000 of cost, so the only differences between job types are the minimums.
| Project | Fee and minimum |
|---|---|
| New principal building (house) | $7.50 per $1,000 of cost; $750 minimum |
| Detached accessory structure over 200 sq ft | $7.50 per $1,000; $75 minimum |
| Additions, including upper stories, attached garages, sunrooms | $7.50 per $1,000; $75 minimum |
| Repairs, renovations, alterations, remodels and conversions | $7.50 per $1,000; $75 minimum |
| Decks and porches; re-roofing, re-siding, re-decking; replacement windows and doors | $7.50 per $1,000; $75 minimum |
| Pools, solar, insulation, fences over 7 feet, fire alarms and sprinklers | $7.50 per $1,000; $75 minimum |
| Foundation only, demolition, sheet metal, mechanical, chimneys and stoves | $7.50 per $1,000; $75 minimum |
| Work begun without a permit | Double fee; $150 minimum |
| Re-inspection after uncorrected violations | $75 each, paid before the inspection |
| Trench permit; tent or temporary structure | $75 each |
| Vacant property registration; agricultural buildings | $500; $0.15 per sq ft |
Worked example. A $400,000 new house pays 400 × $7.50 = $3,000, well above the $750 minimum. A $30,000 bathroom and kitchen remodel is 30 × $7.50 = $225, and an $8,000 roof replacement works out to $60, so the $75 minimum applies. Filing on paper, where allowed, adds $25.
Trade permits and who may pull them
The city issues wiring permits only to Massachusetts-licensed electricians and plumbing and gas permits only to licensed plumbers and gas fitters, under MGL c. 143, s. 3L and c. 142, s. 13. Building work on homes needs a licensed construction supervisor, and a registered home improvement contractor for existing owner-occupied homes, unless the owner files the homeowner’s exemption. A replacement gas water heater needs both a plumbing and a gas permit.
Rather talk it over?
Call 1-855-478-4290 →| Permit | Fee |
|---|---|
| Electrical: single-family dwelling, without service | $200 |
| Electrical: 2–4 unit building, without service | $200 per apartment |
| Electrical: new, temporary or changed service | $75 per inspection; over 200 A add $5 per 100 A; $5 per added meter |
| Electrical: above-ground pool; in-ground pool | $75 per inspection; $150 |
| Electrical: solar panels; EV chargers; solar batteries | $200; $75 per inspection; $75 per inspection |
| Electrical: appliance wiring; non-specific work; re-inspection | $75 per inspection (plus $15 per added appliance); $75; $75 |
| Commercial electrical: new construction and major renovations | $0.15 per sq ft; $225 minimum |
| Commercial electrical: minor renovations under 400 sq ft; repair and maintenance | $200; $150 |
| Commercial electrical: service; solar; EV chargers | $150 (over 200 A add $35 per 100 A); $250; $125 each |
| Plumbing or gas, new home or each new multifamily unit | $150 first fixture; $20 each added fixture |
| Plumbing or gas, residential renovation | $100 first fixture; $20 each added |
| Plumbing or gas, new commercial; commercial renovation | $200 or $150 first fixture; $25 each added |
| Plumbing or gas, repair or replace | $75 first fixture; $15 each added |
| Plumbing or gas re-inspection | $75 |
How to apply for an Easthampton building permit
Confirm setbacks in Table 6.1 and section 6.7, and whether the site is within 100 feet of a wetland or 200 feet of a perennial stream.
Planning, Conservation Commission, Public Works, the City Engineer, the Fire Department or the Historical Commission, as the project requires.
Create a profile with phone, email and any contractor licenses.
Upload plans, a plot plan and the workers’ compensation affidavit (or homeowner’s exemption).
Follow the status in PermitEyes; fees follow the October 2025 schedules.
Print the issued permit, post it on site and book inspections with each inspector.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
Under 780 CMR 105.3.1 the building official acts within 30 days of the application’s filing; Easthampton’s pages count the 30 days from receipt of all proper documentation and note that most permits issue sooner, while larger projects can take the full period. Paper filings, which need prior approval, are flagged as a cause of delay. Applications filed after May 21, 2026 near wetlands now also wait on review under the city’s own ordinance, and a building over 50 years old proposed for demolition can face a six-month delay.
Inspections in Easthampton
Each trade books its own inspections: the wire inspector at 413-563-7153 and the plumbing and gas inspector at 413-265-6290, with building inspections arranged through the office at extension 402 during its Monday to Thursday hours. Many electrical fees are charged per inspection, so an extra visit for a service, pool or EV charger adds $75. Re-inspections after violations that were not corrected cost $75 on residential and $100 on commercial work and must be paid before the inspector returns. Buildings on a periodic inspection schedule renew their certificate of inspection through PermitEyes, and a new business or change of use needs a $75 certificate of occupancy inspection.
Energy code and local ordinances in Easthampton
Easthampton adopted the Stretch energy code with effect from July 1, 2010, and on June 25, 2024 the City Council adopted the Specialized energy code (225 CMR 22 and 23, with appendices RC and CC) as the city’s minimum energy code, including future editions, effective January 1, 2025 (Section 4-2.1). The demolition delay ordinance treats any building 50 or more years old, or of unknown age, as potentially significant: the Building Inspector forwards the application to the Easthampton Historical Commission, which makes an initial determination within 14 days. A positive finding leads to a public hearing advertised in a local newspaper at least 14 days ahead, with notice mailed to the applicant and affected owners; if the Commission then finds the building preferably preserved, no demolition permit may issue for at least six months. The Wetlands Protection Ordinance, in effect from May 21, 2026, covers vegetated wetlands, banks and intermittent streams with a 100-foot buffer (including the springs and seeps on Mount Tom), perennial rivers and streams out to 200 feet, land under water bodies and land subject to flooding. The Commission usually meets on the second and fourth Monday of the month, in person at 50 Payson Avenue and online, and its Conservation Agent is available Monday to Thursday, 9:00 a.m. to 4:30 p.m., at 413-529-1463.
Massachusetts has one State Building Code, 780 CMR, for every city and town; towns cannot rewrite it, though many opt into a stricter energy code. The trades run under their own state codes. Massachusetts rules
Easthampton building permit FAQ
Want this handled start to finish?
Get a free quote →How much is a building permit in Easthampton?
$7.50 per $1,000 of project cost for homes, with a $750 minimum for a new house and $75 for other work; commercial work is $10 per $1,000. The schedules took effect October 30, 2025.
Can I file a paper application?
Only with the department’s prior approval, and paper applications carry a $25 processing fee. Contractors must use PermitEyes.
Do I need a permit for a shed or fence?
Sheds under 200 square feet need no building permit but do need a fence/shed placement application. Fences 6 feet and under need a placement application; the FAQ requires a permit for anything taller.
Which energy code applies to new homes?
The Specialized energy code, the city’s minimum energy code since January 1, 2025.
How long is a building permit good for?
180 days; the department may grant an extension in some cases.
How long does review take?
The city’s page gives 30 days from receipt of all proper documentation and says most permits issue sooner.
Does demolishing an old garage need Historical Commission review?
If the building is 50 or more years old or of unknown age, the application goes to the Historical Commission, and a preferably-preserved finding delays the permit by at least six months.
Can I look up permits online?
Yes. The PermitEyes public view shows pending and issued permits without an account. FEMA lists Easthampton (community 250160) as participating in the National Flood Insurance Program, with current flood maps effective August 15, 1979.
Easthampton permit search and official resources
Anyone can look up pending and issued permits, and follow a job’s progress, on the PermitEyes public view without an account. Applicants see full status after signing in. For older paper files, ask the Building Department; the city’s ordinances are posted as a PDF compiled in May 2026.
Inspections are where schedules slip.
Get a free quote →- Easthampton Building Inspector
- PermitEyes online permitting
- PermitEyes public view of permits
- Permit applications and affidavits
- Building and inspection FAQs
- Permit fee schedules
- Residential building fees (October 30, 2025)
- Commercial building fees
- Miscellaneous building fees
- Electrical permit fees
- Gas and plumbing fees
- Zoning Ordinance
- City ordinances
- Wetlands Protection Ordinance
- Conservation Commission
- Planning Department fees
- Health Department
- Official 2020 municipal census
- Massachusetts municipal energy code list
- Massachusetts State Building Code
- FEMA Community Status Book, Massachusetts
Simplify Easthampton permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Massachusetts. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Easthampton sooner?
Let Alliance prepare, file, and track your Easthampton permits while your crew stays on the job.
More Massachusetts permitting guides
Amherst
Read guide →Belchertown
Read guide →Northampton
Read guide →Easton Building Permit Guide
Read guide →Essex County Building Permit Guide
Read guide →Everett Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Easthampton permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.