Skip to main content
Municipal GuideKansasSaline County · Kansas

Saline County, Kansas Building Permit Guide

To get a building permit in Saline County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Saline County Planning and Zoning in Salina issues the free county building permit for the unincorporated county; non-farm buildings other than houses are reviewed and inspected by the City of Salina.

Scope: Unincorporated Saline CountyCode route: Uniform Building Code for non-farm buildings other than housesTrades: No county trade licence; septic by Environmental Health
Authority
Planning and Zoning229 North 9th Street, Salina
County permit fee
NoneCity, health and entrance fees may apply
Permit trigger
Larger than 10 by 12 feetOr a new footprint, roofline or 50% remodel
Permit life
120 days to startOne year to finish

For unincorporated Saline County, the Planning and Zoning Department at 229 North 9th Street in Salina (785-309-5813) issues the county building permit, which carries no fee. You apply through the county’s online forms or at the office, and the permit is reviewed by the county health, public works and planning and zoning departments. Non-agricultural buildings other than single-family homes must also meet the Uniform Building Code, and the City of Salina reviews and inspects them under a city-county agreement.

Chapter 5 of the Saline County Code, last updated in September 2025, sets the rules: a permit for each building or structure, review for floodplain, zoning, driveway entrance, subdivision, private sewage and groundwater rules, and a permit that expires if work does not start within 120 days or finish within one year. Saline County Environmental Health, in the same office, enforces the sanitary code and issues septic permits. Salina and the part of Solomon inside the county permit their own work.

Unincorporated Saline County, including the unincorporated townsites of Bridgeport, Falun, Hedville and Kipp, which have their own zoning maps. The seven cities are listed in the next section.

📜

The city inspects the county’s commercial work. Under Chapter 5, non-agricultural, non-single-family structures must meet the Uniform Building Code, and their review and inspection is done by the City of Salina’s permits and inspection office. Houses and farm buildings get the county permit only, which checks zoning, floodplain, entrance, sewage and water.

What requires a building permit in Saline County?

No building or structure, signs included, may be put up, enlarged, altered, repaired, moved or converted in the unincorporated county without a separate county permit for each one. The department’s plain-language test is a new structure larger than 10 by 12 feet, a change to a building’s footprint or roofline, or a remodel that raises the structure’s value by 50% or more.

Short on time to read all of this?

Get a free quote →

Permit required

  • New dwellings, and the placement or replacement of a dwelling
  • Accessory structures with more than 120 square feet of roof area
  • Residential additions and any change to a footprint or roofline
  • Remodels that improve a structure’s value by 50% or more, and alterations over 50% of value in the 100-year floodplain
  • Signs, swimming pools, above-ground gas or liquid tanks, billboards and wind chargers, which Chapter 5 counts as structures
  • Commercial and other non-agricultural, non-single-family buildings, which also need a City of Salina building permit

No county building permit

  • One-story sheds, playhouses and similar buildings with no more than 120 square feet of roof area (setbacks still apply)
  • Interior alterations, and exterior alterations that do not enlarge the structure (in the 100-year floodplain, only up to 50% of the structure’s value)
  • Residential fences up to 6 feet high, with vision clearance kept at intersections and alleys
  • Walks and driveways; a new driveway entrance still needs Public Works approval

Kansas has no general statewide building code: each city and county adopts and amends its own. A few state rules apply everywhere, led by the Kansas Fire Prevention Code. Kansas rules

Saline County building department: who handles permitting

Planning and Zoning administers Chapter 5 and the zoning and subdivision regulations; Tim Hamilton is the Planning and Zoning Administrator. Each permit is reviewed by the county health, public works and planning and zoning departments, and other permits usually have to be in hand before the building permit is issued.

Saline County permit contacts
OfficeContactHandles
Planning and Zoning229 North 9th Street, Salina, KS 67401; 785-309-5813; Monday to Friday 8:00 am to 4:00 pmCounty building permit, zoning certificate, floodplain development permit, zoning changes, subdivisions, variances
Environmental HealthSame address and phone; Monday to Friday 8:00 am to 5:00 pmSeptic permits, wells, real estate transaction inspections, licensed contractors
Road and BridgeSaline County Road and Bridge DepartmentDriveway entrance permits, oversize loads, building moves
City of SalinaBuilding Services, 785-309-5715Building permits for non-agricultural, non-single-family structures in the county

Not sure this scope needs a permit?

Get a free quote →
Who issues building permits in each Saline County city
City (2025 pop.)Who issues building permitsNotes
Salina (46,094)City of SalinaPermits for buildings, plumbing, electrical and mechanical work, demolition and signs
Solomon (a small part)City of Solomon building inspectorThe city lies mainly in Dickinson County
Assaria (421), Gypsum (387), Brookville (236), Smolan (158), New Cambria (106)Not stated in published sourcesAsk the city clerk before building

In 2025, building permits issued in unincorporated Saline County authorized 16 new privately owned housing units, all of them single-family homes, according to the U.S. Census Bureau Building Permits Survey.

Permit types

Residential permits

A new home needs to meet the zoning setbacks (Planning and Zoning), an entrance permit (Road and Bridge), proof of water from a rural water district or the health office, and a percolation test (Environmental Health). A single-family permit is available on a legal agricultural split or a legal platted lot. The county applies no construction code to a single-family house or a farm building. Its online forms are split into a residential building permit (new homes, remodels, additions and accessory buildings), a commercial building permit, and an other and sign permit for work such as foundation stabilization, demolition and commercial signs.

Commercial permits

A commercial, industrial or other non-agricultural, non-single-family building gets the county permit and a City of Salina building permit, with plan review and inspection under the Uniform Building Code by the city’s permits and inspection office. Solar energy systems and battery energy storage systems have their own zoning amendments (Resolutions 24-2408 and 25-2423).

Rather talk it over?

Call 1-855-478-4290 →

Moving a building

Building moves are permitted through Road and Bridge Policy 2025-101, adopted by Resolution 25-2433 on September 2, 2025.

Kansas has no state licence for general contractors or the main trades; cities and counties license them under state rules. Roofers register with the Attorney General. Kansas rules

Saline County permit costs and fees

Chapter 5 states that there is no fee for the county building permit. Other offices charge for their own permits.

Fees connected to a Saline County building permit
ItemWho chargesRule
County building permitPlanning and ZoningNo fee
Building permit for non-agricultural, non-single-family structuresCity of SalinaCity permit fees apply
Septic and well permitsEnvironmental HealthHealth department fees apply
Driveway entrance permitRoad and BridgePublic works fee applies
Card payments to Planning and ZoningPlanning and Zoning2.5% card fee
⚠️ Half the city permit fee can come back to qualifying businesses. When a certificate of occupancy is issued, Saline County reimburses 50% of the building permit fees for new buildings, additions or renovations in the unincorporated county used only for manufacturing, research and development, or storing goods sold or traded in interstate commerce (Resolution 92-1315).

Rather not deal with the Saline County building department?

Get a free quote →

Trade permits and who may pull them

Where trade work is regulated

  • On non-agricultural, non-single-family buildings, the City of Salina’s permit and inspections cover the building under the Uniform Building Code
  • A new septic permit is needed for any change to a septic system, such as adding lateral lines or a new tank
  • Environmental Health keeps the list of licensed septic contractors and handles real estate transaction inspections

Not issued by the county

  • Electrical, plumbing and mechanical permits for houses and farm buildings in the unincorporated county
  • Contractor or trade licences

Trade work is permitted separately under the codes the jurisdiction has adopted. Kansas rules

How to apply for a Saline County building permit

1. Check the parcel

Make sure it is outside the cities, is a legal agricultural split or platted lot, and find its zoning and floodplain status on the county zoning map and FEMA’s flood map service.

2. Ask about setbacks

Setbacks depend on the zoning district and building type; the Planning and Zoning office gives them by phone.

3. Line up water, sewage and access

Get proof of water from the rural water district or health office, a percolation test and septic permit from Environmental Health, and an entrance permit from Road and Bridge.

4. Apply for the county permit

File the building permit form online or at the office; there is no county fee.

5. Add the City of Salina permit for commercial work

Non-agricultural, non-single-family buildings go through the city’s plan review, fees and inspections.

6. Start within 120 days and finish within a year

A permit lapses if work has not begun in 120 days or is not finished within one year.

Review, corrections and what actually causes delay

Because health, public works and planning and zoning all review the permit and other approvals usually come first, the county permit waits for the septic, water and entrance pieces. Parcels that were not legally split cannot receive a single-family permit.

Want this handled start to finish?

Get a free quote →

Inspections in Saline County

The county has no building inspectors and makes no construction inspections of houses or farm buildings. For non-agricultural, non-single-family buildings, the City of Salina inspects; it schedules commercial final inspections and site visits on Tuesdays and Fridays at 10:00 am and 2:00 pm, and other times can be requested at 785-309-5715. Environmental Health inspects septic work and carries out real estate transaction inspections when a property with a septic system or well is sold.

Saline County permit search and official resources

Inspections are where schedules slip.

Get a free quote →

Frequently asked questions

Does the Saline County building permit cost anything?

No. Chapter 5 sets no fee for the county permit, but city building, health and driveway entrance permits carry their own fees.

When do I need a permit in unincorporated Saline County?

For a new structure larger than 10 by 12 feet, a change to a footprint or roofline, or a remodel that raises the value by 50% or more.

Which building code applies?

The Uniform Building Code, for non-agricultural, non-single-family buildings, enforced by the City of Salina. Houses and farm buildings have no county construction code.

Who permits a septic system?

Saline County Environmental Health at 229 North 9th Street (785-309-5813). A new permit is needed for any change, such as added lateral lines or a new tank.

How long is a permit good for?

Work must start within 120 days and be finished within one year of the permit date.

Does the county issue permits inside Salina?

No. Salina and the part of Solomon in the county issue their own; for Assaria, Gypsum, Brookville, Smolan and New Cambria the published sources do not say.

Simplify Saline County permitting with Alliance Permitting

In Saline County the county is the jurisdiction and its resolution is the whole of the standard. We read that resolution, confirm the water and wastewater position at the parcel, and file with the office that holds it.

Ready to break ground in Saline County sooner?

Send us the scope and the parcel. We confirm the review path with the Saline County Planning and Zoning Department, assemble the submittal, file it, and track it through issuance — corrections included.

More Kansas permitting guides

This guide is provided by Alliance Permitting for general information about Saline County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.