Butler County, Kansas Building Permit Guide

To get a building permit in Butler County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Butler County Community Development in El Dorado issues building permits, trade licences and septic permits for the unincorporated county; most of its cities issue their own.

Scope: Unincorporated Butler CountyCode route: 2006 International Codes, Resolution 16-06Trades: County Building Trade licence, $50 a year
Authority
County Community Development121 South Gordy Street, Suite 202, El Dorado
Phone
316-322-4325Permits@bucoks.com
Building code
2006 IBC and IRCAdopted by Resolution 16-06, 2016
Septic permit
$200 for a new systemIssued to a licensed installer

In unincorporated Butler County, building permits come from the Building Safety and Construction Enforcement Division of Butler County Community Development, 121 South Gordy Street, Suite 202, El Dorado (316-322-4325). You apply through the county’s online permit portal; plans get a land-use and code review, and the county’s own building inspectors check the work. Fees follow the valuation table of the 1997 Uniform Building Code, so a $200,000 project costs $1,553.75.

The same office runs three divisions: Planning and Zoning (zoning, subdivision and floodplain), Environmental Health (the county sanitary code, septic and well permits, and installer licensing) and Building Safety. The county code is the Butler County Building Code adopted by Resolution 16-06 on February 23, 2016, which brings in the 2006 International Building, Residential and Mechanical Codes, the 2006 Uniform Plumbing Code and the 2005 National Electrical Code with local amendments. Andover, Augusta, El Dorado, Rose Hill and the other cities with their own building departments permit inside their limits.

Unincorporated Butler County. Nine of the 13 cities run their own permit desk; the town-by-town list is in the next section.

📜

Older code editions apply here. Butler County enforces the 2006 International Codes and the 2005 National Electrical Code, not the newer editions that cities such as Rose Hill enforce. Plans are reviewed against the 2016 county code, whatever edition they were drawn to.

What requires a building permit in Butler County?

The county building code covers construction, demolition and remodeling of structures in the unincorporated county. Its permit forms list single-family homes, commercial buildings, accessory structures and agricultural buildings, and separate applications exist for signs, solar systems, floodplain development and septic or well work.

Permit or county approval needed

  • New houses, additions and remodels under the 2006 International Residential Code as the county amended it
  • Commercial buildings and alterations under the 2006 International Building Code
  • Pole barns and other post-frame agricultural or accessory buildings, which must meet the minimum standards added by Resolution 23-12 in May 2023
  • Solar installations, on their own solar permit with a fee based on labor and materials
  • Signs, on the county sign permit application
  • Any development in a mapped floodplain, on a floodplain development permit
  • New septic systems, lagoons and wells, on an environmental permit

Fee or licence exemptions

  • Nonresidential structures used solely for agriculture are exempt from paying permit fees, though the pole barn standards still apply
  • The owner of a single-family dwelling not over two stories does not need a contractor’s licence for work on that home, but still needs the permits; subcontractors must be licensed
  • Work the 2006 International Residential Code exempts from a permit, as the county code allows

Short on time to read all of this?

Get a free quote →

Pole barn standards (Resolution 23-12)

A post-frame building needs plans sealed by a Kansas-licensed engineer when it exceeds a 14-foot sidewall, a 40-foot width measured by the truss span or an 80-foot length; every metal-framed building and every pole barn with living quarters also needs an engineer’s seal. Post holes are at least 12 inches across for a building 20 feet wide or less, 15 inches at 30 feet and 18 inches at the 40-foot maximum, and 30 inches deep for sidewalls up to 9 feet or 48 inches deep for 9- to 14-foot sidewalls. Truss specifications must be legible and carry the manufacturer’s contact details.

Kansas has no general statewide building code: each city and county adopts and amends its own. A few state rules apply everywhere, led by the Kansas Fire Prevention Code. Kansas rules

Butler County building department: who handles permitting

Community Development is the permit office for the unincorporated county; its Director is Toby Stewart, and two county building inspectors carry out site inspections. Inside a city, the city’s own office or clerk takes the application.

Butler County Community Development contacts
DetailInformation
Office121 South Gordy Street, Suite 202 (Courthouse East Annex, second floor), El Dorado, KS 67042
Phone and email316-322-4325; fax 316-322-4264; Permits@bucoks.com
HoursMonday to Friday, 8:00 am to 5:00 pm
OnlinePermit applications and trade licence applications through the county’s permit portal; a free account is needed, and applications can take 24 to 72 hours to process
DivisionsPlanning and Zoning; Environmental Health (sanitary code, septic and wells, installer licensing); Building Safety and Construction Enforcement
Who issues building permits in each Butler County city
City (2025 pop.)Who issues building permitsNotes
Andover (17,370)City of AndoverBuilding Inspections Department; permit fees can be paid online
El Dorado (12,696)City of El Dorado Building Department, part of Community DevelopmentOnline permits and contractor licensing through the city’s municipal payments portal
Augusta (9,073)City of Augusta inspection officeBuilding Inspections, 114 East 6th Avenue, 316-775-4505
Rose Hill (4,320)City of Rose Hill Building Official2018 IBC, IRC, IPC, IMC and IFGC, 2024 IFC and 2017 NEC; City Hall 316-776-2712
Douglass (1,506)City of DouglassOnline building permit application for roofing, plumbing, mechanical and electrical work
Towanda (1,426)City planning and zoning administratorMost repairs need a city permit and inspection; City Hall 316-536-2243
Benton (939)City of Benton Building Permits and InspectionsPermits, plan review, inspections and certificates of occupancy; 316-778-1625
Leon (652)City of LeonOnline city building permit application
Whitewater (650)City clerkPermit filed with the clerk at 201 South Elm Street (316-799-2445); good for 180 days, 24 hours’ notice for inspections
Potwin (411)Not stated in the city’s published pagesAsk the city office, 620-752-3422
Elbing (223), Cassoday (107), Latham (99)Not stated in published sourcesAsk the city clerk before building

Not sure this scope needs a permit?

Get a free quote →

Permit types

Residential permits

A house, addition or garage in the unincorporated county is reviewed against the 2006 International Residential Code as Butler County amended it. The local table sets a 15 psf ground snow load, 90 mph wind speed, seismic category A, severe weathering and a 30-inch frost depth; casement egress windows may have a 17-inch minimum clear width; accessory buildings of 400 square feet or less with eaves of 10 feet or less need no frost-depth footings; and every structure, accessory buildings included, must be anchored to the ground. Truss prints may be requested for review and must be on site for inspections. For new construction on vacant land, the county portal notes that a soil profile may have to be submitted first.

Commercial permits

Commercial projects get plan, site plan and land-use review against the 2006 International Building Code, with appendices C, E and K adopted, before construction permitting. Commercial solar and commercial wind projects need a conditional use permit, and the county’s planning and zoning filing fee schedule calls for a pre-permit application review before that application.

⚠️ Data-center rules are still pending. The Planning Commission recommended data-center zoning regulations (Resolution 26-40) on September 1, 2026; on October 13, 2026 the County Commission tabled adoption until October 27, 2026. Until they are adopted, the county’s data-center page carries the draft and meeting records only.

Rather talk it over?

Call 1-855-478-4290 →

Other county permits

The environmental permit covers septic tanks, lateral fields, lagoons and wells and is good for 180 days from approval or the last inspection. A floodplain development permit is needed for filling, grading, excavation and building in a mapped flood zone; in a floodway or an A zone, a no-rise analysis or a state permit determination must be provided before the county issues it, and additions or remodels must report the value of the improvement and the building’s pre-improvement assessed value.

Kansas has no state licence for general contractors or the main trades; cities and counties license them under state rules. Roofers register with the Attorney General. Kansas rules

Butler County permit costs and fees

Building, electrical, mechanical and plumbing permit fees are set by Resolution 99-02, which uses Table 1-A of the 1997 Uniform Building Code; the 2016 building code repeats the table. The permit forms base the fee on the value of labor and materials.

Butler County building permit fee table (Resolution 99-02)
Total valuationFee
$1 to $500$23.50
$501 to $2,000$23.50 for the first $500 plus $3.05 for each additional $100
$2,001 to $25,000$69.25 for the first $2,000 plus $14.00 for each additional $1,000
$25,001 to $50,000$391.25 for the first $25,000 plus $10.10 for each additional $1,000
$50,001 to $100,000$643.75 for the first $50,000 plus $7.00 for each additional $1,000
$100,001 to $500,000$993.75 for the first $100,000 plus $5.60 for each additional $1,000
$500,001 to $1,000,000$3,233.75 for the first $500,000 plus $4.75 for each additional $1,000
$1,000,001 and up$5,608.75 for the first $1,000,000 plus $3.65 for each additional $1,000

Worked example: a project valued at $200,000 pays $993.75 for the first $100,000 plus 100 × $5.60 = $560, a building fee of $1,553.75.

Rather not deal with the Butler County building department?

Get a free quote →
Other Butler County fees
ItemFee
Inspections outside business hours, inspections with no listed fee, re-inspections, extra plan review caused by changes$47 an hour (half-hour minimum for unlisted inspections and extra plan review), or the county’s full hourly cost if greater
Outside consultants for plan review or inspectionActual cost plus administrative and overhead costs
Nonresidential buildings used solely for agricultureNo permit fee
Building Trade licence (contractors)$50 a year; expires December 31
Environmental permit: new septic system or lagoon (soil profile required)$200
Environmental permit: partial rework, cleanout, add-on, or tank or lateral replacement$75
Environmental permit: well$100
⚠️ A contractor needs the county licence first. No building permit is issued to a contractor who has not obtained the county Building Trade licence, owes fees or has had a licence revoked. The licence names an individual, costs $50 and needs proof of at least $100,000 of general liability insurance.

Trade permits and who may pull them

County rules

  • Electrical work under the 2005 National Electrical Code, with the ICC Electrical Code Administrative Provisions and county amendments
  • Plumbing under the 2006 Uniform Plumbing Code as the county amended it
  • Mechanical work under the 2006 International Mechanical Code
  • Every contractor and subcontractor needs a county Building Trade licence; the county posts a public lookup of licensed contractors
  • Septic systems and lagoons are permitted only to a licensed installer; wells to the owner or the driller

Who may skip the licence

  • The owner of a single-family dwelling of not more than two stories, for work on that home
  • Owners of commercial and industrial property must follow the licensing and permitting rules before work starts

Trade work is permitted separately under the codes the jurisdiction has adopted. Kansas rules

How to apply for a Butler County building permit

1. Check that the parcel is unincorporated

If it lies inside one of the 13 cities, apply there instead; the county zoning map and flood map are linked from the Community Development portal.

2. Settle zoning, platting and floodplain

Zoning changes, plats and conditional uses go to the Planning Commission on its published deadlines; floodplain sites need the floodplain development permit.

3. Get the soil profile and environmental permit

On unsewered land, a licensed installer files the soil profile and the septic or lagoon permit with Environmental Health.

4. Make sure every contractor is licensed

The general contractor and each subcontractor need a current county Building Trade licence; owners of a home of up to two stories may do their own work.

5. Apply through the county portal

Create a free account, upload plans and a site plan, and allow 24 to 72 hours for processing; Permits@bucoks.com handles questions.

6. Pay, post the permit and call inspections

Pay the valuation-based fee, post the permit near the front of the structure and give 24 hours’ notice for each inspection.

Want this handled start to finish?

Get a free quote →

Review, corrections and what actually causes delay

The licence check comes before issue: no permit goes to a contractor who is unlicensed or owes the county fees. A pole barn over the size limits without an engineer’s seal, a floodway site without the no-rise analysis or state determination, and a vacant lot with no soil profile on file also hold up the permit.

Inspections in Butler County

The Building Safety and Construction Enforcement Division inspects the work it permits, and Environmental Health inspects septic systems, lagoons and wells. Each permit form asks for 24 hours’ notice before an inspection. For solar installations the inspector must see at least one piling or anchor going in and the open trench with conduit before backfill. The county issues a certificate of occupancy only after the final environmental and final building inspections have passed. Building and environmental permits stay valid for 180 days from approval or the last inspection; an extension must be requested in writing.

Butler County permit search and official resources

Inspections are where schedules slip.

Get a free quote →

Frequently asked questions

How much is a building permit in Butler County?

The fee follows the 1997 Uniform Building Code valuation table adopted by Resolution 99-02. A $200,000 project pays $1,553.75; nonresidential buildings used only for agriculture pay no permit fee.

Which building codes does Butler County use?

The 2006 International Building, Residential and Mechanical Codes, the 2006 Uniform Plumbing Code and the 2005 National Electrical Code, adopted with amendments by Resolution 16-06 in 2016.

Does the county issue permits inside Andover, Augusta or El Dorado?

No. Andover, Augusta, El Dorado, Rose Hill, Douglass, Towanda, Benton, Leon and Whitewater issue their own permits; for Potwin, Elbing, Cassoday and Latham the published sources do not say, so ask the city first.

Does a pole barn need engineered plans?

Yes when it exceeds a 14-foot sidewall, a 40-foot truss span or an 80-foot length, when it is metal-framed, or when it includes living quarters.

Can a homeowner build without a contractor licence?

Yes for a single-family dwelling of up to two stories, but the owner still needs the permits and any subcontractor must hold a county Building Trade licence.

Who permits a septic system?

The county’s Environmental Health Division in the same office. A new septic system or lagoon costs $200, needs a soil profile and is permitted to a licensed installer.

Simplify Butler County permitting with Alliance Permitting

Butler County is large enough that the jurisdiction question is genuine and old enough that the title question is too. We settle both before siting a building.

Ready to break ground in Butler County sooner?

Send us the scope and the parcel. We confirm the review path with the Butler County Community Development Department, assemble the submittal, file it, and track it through issuance — corrections included.