Reno County, Kansas Building Permit Guide

To get a building permit in Reno County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Reno County Planning and Zoning in South Hutchinson issues zoning and floodplain permits for the unincorporated county by appointment; the county enforces no building code, and its Environmental Division permits septic systems and wells.

Scope: Unincorporated Reno CountyCode route: No county building code; zoning permit onlyTrades: No county trade permits; wastewater contractors licensed
Authority
Planning and Zoning600 Scott Boulevard, South Hutchinson
Appointments
620-694-2978Required before you visit
Zoning permit
Over 120 sq ftAny size in a floodplain
Septic permit
$275Environmental Division, 620-259-2105

In unincorporated Reno County you need a county zoning permit, not a building permit, for any structure over 120 square feet, and a floodplain development permit for a structure of any size in a floodplain. Both come from the Planning and Zoning Division of Reno County Public Works, 600 Scott Boulevard in South Hutchinson, by appointment at 620-694-2978. Reno County does not enforce or implement building codes and makes no construction inspections.

The county suggests building to the latest code standard, and its zoning permit form recommends the Uniform Building Code, Uniform Plumbing Code, National Electrical Code and Uniform Fire Code, but nothing is inspected. Wells and private wastewater systems are permitted by the Environmental Division of Public Works under the Reno County Sanitation Code, and entrances onto county roads by Public Works. Part of the county is unzoned; the planning office still has to be contacted there because floodplain, entrance, septic and well permits may apply.

Unincorporated Reno County. Hutchinson, South Hutchinson, Haven, Buhler and the other cities handle permits inside their own limits; the next section lists all 15.

📜

No county building code, no county inspections. Reno County does not enforce or implement building codes and requires no HVAC, concrete or other code inspections in the unincorporated county. The permits it does issue are zoning, floodplain, entrance, well and wastewater approvals.

What requires a building permit in Reno County?

No county building permit exists. The approvals below apply in the unincorporated county, in zoned and unzoned areas alike for the floodplain, entrance, well and wastewater items.

County permit or approval needed

  • A zoning permit for any structure over 120 square feet, new, moved on or added to (houses, garages, shops and commercial buildings)
  • A floodplain development permit for any structure, dirt work or channel change in a floodplain, whatever its size; some also need a state Division of Water Resources permit first
  • A private wastewater permit and a private water well permit from the Environmental Division
  • An entrance permit from Public Works for a driveway onto a county road; for a township road, the township official
  • Rezonings, conditional use permits and variances, heard by the Planning Commission or Board of Zoning Appeals

No county permit

  • Structures of 120 square feet or less outside the floodplain
  • Building code, plumbing, electrical or mechanical permits and inspections, which the county does not issue

Short on time to read all of this?

Get a free quote →

A street address is assigned to vacant land only when a zoning permit is issued for a structure.

Kansas has no general statewide building code: each city and county adopts and amends its own. A few state rules apply everywhere, led by the Kansas Fire Prevention Code. Kansas rules

Reno County building department: who handles permitting

Planning and Zoning and the Environmental Division are both part of Reno County Public Works at 600 Scott Boulevard. An appointment is needed before filing a zoning permit, zoning amendment, conditional use permit or variance, so the planner can go over the proposal and procedure first.

Reno County permit contacts
OfficeContactHandles
Planning and Zoning Division600 Scott Boulevard, South Hutchinson, KS 67505; 620-694-2978 (County Planner Mark Vonachen, CFM); by appointment, Monday to Friday 8:00 am to 5:00 pm, closed 1:00 to 2:00 pmZoning permits, floodplain permits and map checks, rezoning, conditional uses, variances
Public Works620-694-2976Appointments when the planner is unavailable (Monday to Thursday), county road entrance and culvert permits
Environmental Division620-259-2105; same addressPrivate water well and wastewater permits, wastewater contractor licences, subdivision site evaluations
Who issues building permits in each Reno County city
City (2025 pop.)Who issues permitsNotes
Hutchinson (39,595)City of HutchinsonResidential and commercial building permits, trade licensing and an online permit portal
South Hutchinson (2,516)City of South HutchinsonBuilding permits and contractor registrations online; the city adopted the 2012 IBC and IFC in January 2015; City Office 620-663-7104
Buhler (1,320)City of BuhlerZoning and building application on the city’s forms page
Haven (1,169)City of HavenBuilding permit application, fee schedule and floodplain development permit
Nickerson (1,051)City of NickersonThe municipal code has a Buildings and Construction chapter; city office 620-422-5981
Pretty Prairie (652)City zoning administratorCity zoning permit and occupancy certificate needed before building
Arlington (430), The Highlands (352), Turon (308), Sylvia (212), Partridge (210), Plevna (83), Abbyville (81), Willowbrook (72), Langdon (41)Not stated in published sourcesAsk the city clerk before building

Not sure this scope needs a permit?

Get a free quote →

Permit types

Residential permits

For a house, garage or shop, the planning office reviews the zoning permit for compliance with the land development regulations, and the owner completes the health department water and wastewater form so staff can check that the building does not interfere with the septic system or well. The permit records the site and building dimensions, estimated value, zoning, setbacks and whether septic, water, entrance and floodplain permits are needed. In a floodplain, the elevation or floodproofing certificate showing as-built elevations must reach the planning office after the lowest floor, basement included, is finished and before any further construction.

Commercial permits

Commercial buildings follow the same zoning permit route, with conditional uses and variances heard by the Planning Commission or the Board of Zoning Appeals. The zoning regulations were amended in 2026, and separate articles cover solar energy systems (2024), commercial solar (2025) and commercial wind. The county carries out no building plan review, so code compliance rests with the owner and the design team.

Kansas has no state licence for general contractors or the main trades; cities and counties license them under state rules. Roofers register with the Attorney General. Kansas rules

Rather talk it over?

Call 1-855-478-4290 →

Reno County permit costs and fees

There is no building permit fee because there is no county building permit. The zoning permit fee is set by resolution of the County Commission under Section 18-104 of the zoning regulations, and building without a zoning permit can bring a penalty that may be double the permit fee (Section 18-107). The Environmental Division fees below took effect on November 20, 2023 and apply to all requests made since then; paperwork and fees are due before the site appointment.

Reno County Environmental Division fees (effective November 20, 2023)
ServiceFee
Private wastewater permit$275 ($550 if late)
Private water well permit$175 ($350 if late)
Semi-public wastewater or water well permit$275 or $175 ($550 or $350 if late)
Wastewater contractor licence$100 countywide; $30 homeowner
Subdivision plan review$300
Subdivision environmental site assessment and soil profile, per lot$175
Sanitary service licence; vehicle inspection$35; $35 per vehicle

Card payments carry a 2.5% surcharge and electronic checks $1.50; returned payments cost $30.

⚠️ Late septic and well permits cost double. The Environmental Division charges a late fee equal to twice the normal permit fee: $550 instead of $275 for a private wastewater system and $350 instead of $175 for a well.

Rather not deal with the Reno County building department?

Get a free quote →

Trade permits and who may pull them

County requirements

  • Reno County licenses wastewater contractors ($100 countywide) and homeowners who install their own system ($30)
  • Septic pumpers and haulers need a sanitary service licence and a vehicle inspection
  • Well and wastewater placement must meet the Reno County Sanitation Code setbacks

Not issued by the county

  • Electrical, plumbing and mechanical permits or inspections in the unincorporated county
  • Trade licences for builders, electricians or plumbers

Trade work is permitted separately under the codes the jurisdiction has adopted. Kansas rules

How to apply for Reno County permits

1. Find out whether the land is zoned

The county’s zoned and unzoned map and the GIS parcel map show the zoning; the planner gives formal zoning determinations.

2. Book an appointment with the planner

Call 620-694-2978, or Public Works at 620-694-2976 if there is no answer, before bringing an application.

3. Start the well and wastewater permits

Submit the Environmental Division paperwork and fees before its site appointment.

4. Check the floodplain

The planning office runs a floodplain map check as part of the zoning permit; floodplain work may need a state permit before the local one.

5. File the zoning permit

Give site and building dimensions, the estimated value and setbacks; the county assigns an address once the permit is issued.

6. Get the entrance permit and build

Apply to Public Works for a county road entrance, or to the township for a township road, and send the floodplain elevation certificate when required.

Review, corrections and what actually causes delay

Applications are discussed at an appointment before they are filed, the Environmental Division wants paperwork and fees in hand before its site visit, and floodplain work that needs a state Division of Water Resources permit cannot get the local permit until the state permit, or written notice that none is needed, arrives.

Inspections in Reno County

Reno County makes no building, HVAC, concrete or other code inspections in the unincorporated county. The Environmental Division works with owners on the location of wastewater systems and wells, and in a floodplain construction must stop after the lowest floor until the as-built elevation or floodproofing certificate is returned to the planning office. Inside the cities, inspections are the city’s.

Want this handled start to finish?

Get a free quote →

Reno County permit search and official resources

Inspections are where schedules slip.

Get a free quote →

Frequently asked questions

Do I need a building permit in unincorporated Reno County?

No county building permit exists. You need a zoning permit for any structure over 120 square feet, a floodplain permit for any structure in a floodplain, and well and wastewater permits from the Environmental Division.

Which building code applies?

None is enforced by the county. It suggests building to the latest code standard, and its zoning permit form recommends the Uniform Building, Plumbing and Fire Codes and the National Electrical Code.

How much is a septic permit in Reno County?

$275 for a private wastewater permit and $175 for a private well, or double if the application is late, under the fee schedule effective November 20, 2023.

My land is unzoned. Do I still contact the county?

Yes. Floodplain, entrance, septic and well permits may still be required.

Does the county permit inside Hutchinson?

No. Hutchinson, South Hutchinson, Buhler, Haven, Nickerson and Pretty Prairie handle permits inside their limits; for the other nine cities the published sources do not say.

Do I need an appointment?

Yes. Call 620-694-2978 before visiting the planning office, which closes daily from 1:00 to 2:00 pm.

Simplify Reno County permitting with Alliance Permitting

In Reno County the question under the parcel matters as much as the one on it. We raise the ground and records questions before the foundation, then file the zoning, floodplain and health permits the county actually requires.

Ready to break ground in Reno County sooner?

Send us the scope and the parcel. We confirm the review path with the Reno County Planning and Zoning Department, assemble the submittal, file it, and track it through issuance — corrections included.