Inside Bettendorf city limits, the Building Division of Community Development (563-344-4074) issues building, electrical, plumbing and mechanical permits under the 2021 International Building and Residential Codes and the 2023 National Electrical Code. Applications go through the city’s One Stop portal or to the counter at 4403 Devils Glen Road, and the building fee comes from the 2025 fee chart: $16 for work valued up to $500 and $385 for a $40,000 project. General contractors need a city bond on file before they apply.
What requires a building permit in Bettendorf?
The Building Division’s rule is that no construction work requiring a permit can start until the permit has been issued. The One Stop portal shows how wide that net is: it carries separate applications for additions, new buildings, porches, remodels, roofs, siding, windows and doors, decks, detached garages, ramps, pergolas, sheds, signs, pools, fences, retaining walls, tanks, waterproofing, solar panels, fireplaces, kitchen hoods, driveway approaches and sidewalks, plus the electrical, plumbing, mechanical, fire alarm and sprinkler permits.
Permit needed
- New homes, additions, porches and remodels
- Sheds larger than 120 square feet
- Decks, and replacing a deck’s handrail or guardrail
- Window replacements that change the header or the window size
- Pools more than 18 inches deep, with a barrier at least 4 feet high
- Fences, retaining walls, roofs and siding
- Driveway approaches, sidewalks and other work in the right of way
- Electrical, plumbing and mechanical work
No permit
- Sheds of 120 square feet or less (placement rules still apply)
- Replacing deck floor boards only
- Same-size window replacements with no header change
Even an exempt shed has to follow the city’s shed placement guidelines, and a larger one is reviewed by a city planner as well as a building inspector. Condominium owners need a letter from their homeowners association before the city will take a permit application.
What Bettendorf decides and what the state holds
Bettendorf adopts its own codes: the 2021 International Building, Residential, Fire, Property Maintenance and Swimming Pool and Spa codes, the 2024 International Mechanical Code, the 2024 Uniform Plumbing Code, the 2023 National Electrical Code and the 2012 International Energy Conservation Code. The city keeps its own Building Board of Appeals, Mechanical Board of Appeals, Plumbing Board and Electrical Commission; the Electrical Commission, appointed by the Mayor, rules on proper installation, alternate materials and the reasonable interpretation of the electrical code. The zoning regulations that took effect on October 18, 2017 sit in Title 11 of the city code. Licensing of electricians, plumbers and mechanical contractors stays with the State of Iowa.
Bettendorf building department: who handles permitting
The Community Development Department, led by Director Mark Hunt, runs three divisions that touch a building project: the Building Division (permits, plan review and inspections), the Planning Division (zoning, site plans, platting and the boards) and the Code Enforcement Division (rental inspections and complaints). Business and occupational licenses are handled at City Hall, 1609 State Street.
Short on time to read all of this?
Get a free quote →| Office | Information |
|---|---|
| Building Division | 4403 Devils Glen Road, Bettendorf, IA 52722; 563-344-4074; building@bettendorf.org; Monday to Friday, 7:00 am to 4:00 pm on the division page (the One Stop help page lists 8:00 am to 5:00 pm) |
| Inspectors’ office hours | 8:00 to 9:00 am and 1:00 to 2:00 pm daily |
| Online | One Stop (permits.bettendorf.org): applications, payments, permit downloads, inspection requests; help at permits@bettendorf.org |
| Planning Division | 563-344-4100; planning@bettendorf.org; 8:00 am to 5:00 pm |
| Floodplain questions | 563-344-4079 |
| Code enforcement and rental inspections | 563-344-4064 (hotline); CodeEnforcement@bettendorf.org |
The two published office schedules differ by an hour at each end, so anyone driving over late in the afternoon should call first. The inspectors themselves are at their desks only in the two daily windows.
Bettendorf permit types
Every permit starts in One Stop or on the matching paper form from the Permit Applications & Forms page. The general building permit application covers new buildings, decks, demolition, alterations, remodels, additions, pools, sheds, sprinklers and accessory structures, and asks for the cost split into building, electrical, HVAC and plumbing; fences, roofs, siding and signs share a shorter form. Applications print the city’s construction hours of 7 am to 10 pm.
Residential permits
A new house needs the building permit application, a digital plan set, a plot plan, a COSESCO (construction site erosion and sediment control) application with an erosion control site plan, a survey certificate and a RESCHECK energy report. Remodels and additions need the application and a digital plan set with as much detail as possible, stamped where required. Decks add the city’s deck worksheet, a plot plan with the deck drawn on and an easement map, both of which the division supplies on request; fences need the same plot plan and easement map. A pool application needs the plot plan, easement map and a MidAmerican Energy approval letter for the location, and must be filed together with a fence permit unless a fence at least 4 feet tall already encloses the yard; automatic pool covers do not count as the barrier. The water’s edge must sit at least 10 feet from property lines, 8 feet from any building with a basement and 5 feet from one without.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
New commercial buildings need two full-size and two half-size color plan sets, a digital set stamped and signed by an Iowa-registered engineer or architect, the COSESCO application and erosion plan, a site plan and a COMCHECK energy report. Commercial remodels need the same paper and stamped digital sets. Before a new commercial, industrial or multifamily building reaches the Building Division, the Planning Division reviews its site development plan.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Rezonings, subdivisions and special use permits go through the Planning and Zoning Commission, which recommends to the City Council; variances go to the Board of Adjustment. The Planning Division staffs both.
- Floodplain. A city floodplain development permit is required before any new construction, remodel, major repair or excavation on property in the floodplain, under Title 13 (Flood Control) of the city code.
- Right of way. Driveway approaches, sidewalks, street cuts, boring and grading are permitted through the Building Division; a homeowner may replace small pieces of private sidewalk, but a new driveway approach must be applied for by a bonded contractor.
- Contractor bond. General contractors file a $10,000 bond for residential work or a $250,000 bond for commercial, industrial and multifamily work before applying.
Not sure this scope needs a permit?
Get a free quote →Bettendorf permit costs and fees
Building permits are priced on project value from the city’s 2025 Building Permit Fee Chart, which prints every $100 and $1,000 step. Trade permits have their own charts, and work started without a permit brings a double fee, a municipal infraction citation or both, unless the Chief Building Official finds the work was an emergency.
| Project value or item | Fee |
|---|---|
| $1 to $500 | $16 |
| $501 to $2,000 | $16 plus $2 per $100 |
| $2,001 to $25,000 | $50 plus $10 per $1,000 |
| $25,001 to $50,000 | $280 plus $7 per $1,000 |
| $50,001 to $100,000 | $455 plus $5 per $1,000 |
| $100,001 to $500,000 | $705 plus $4 per $1,000 |
| $500,001 to $1,000,000 | $2,305 plus $3.50 per $1,000 |
| Over $1,000,000 | $4,055 plus $2.50 per $1,000 |
| Plan review of revisions | $50 per hour |
| ADA plan review | $17 |
| Reinspection | $50 |
| Inspection after hours (2-hour minimum) | $55 |
| Fence: residential / commercial | $13.50 / by value |
| Demolition or moving a building | $26.50 |
| Tank removal | $26.50 each |
| Mobile home installation / temporary use / 30-day temporary sign | $13.50 each |
| 60-day temporary sign | $27.50 |
| Street opening: patch under 10 sq yd / 10 to 25 sq yd / over 25 sq yd | $25 / $75 / $250 |
| Boring or excavation in the right of way: up to 100 ft / each extra foot; general excavation | $50 / $1; $16.50 |
| Permit renewal | Half the original fee, $16 minimum |
| Driveway approach: new residential / widening / commercial | $50 / $25 / $100 |
| Sidewalk | $12 up to 100 sq ft, plus $0.10 per extra sq ft |
| Grading: under 1 acre / 1 acre and over | $75 / $125 |
Rather talk it over?
Call 1-855-478-4290 →| Permit | Fee |
|---|---|
| Electrical, new single-family home or each multifamily unit | $77 |
| Electrical, service repair, replacement or upgrade | $16.50 |
| Electrical, temporary service | $50 |
| Electrical, incidental unit (dishwasher, water softener, fan) | $16.50 |
| Electrical, grounding a metal building / swimming pool or pump | $27.50 each |
| Electrical, homeowner permit | $11 |
| Electrical, remodel or addition | $16.50 for the first 2 rooms, $5.50 per extra room |
| Electrical, commercial | $22 for the first $200, $16.50 for the next $800, $8.50 per extra $1,000 |
| Plumbing, residential | $16.50 first fixture, $9 each additional opening |
| Mechanical | $24.50 up to $2,000; then plus 1.5% of the balance to $250,000 |
| Trade reinspection | $45 |
The chart makes the arithmetic easy to check: a $40,000 deck or addition falls in the $39,001 to $40,000 row and costs $385 ($280 plus 15 × $7), while a $75,000 project costs $580. The summary box at the top of the chart prints the two bands above $50,000 as “per $100”, but its own rows climb by $1,000 steps ($460 at $51,000, $745 at $110,000), so price from the rows. One Stop takes cards with a 2.99% convenience fee, and the city does not accept cash.
Trade permits and who may pull them
- Electrical: issued and inspected by the city under the 2023 National Electrical Code, so electrical permits here are Bettendorf permits, not state ones. Contractors need their state license, master certification and state contractor registration on file.
- Plumbing and mechanical: city permits under the 2024 Uniform Plumbing Code and 2024 International Mechanical Code, filed by state-licensed contractors.
- Homeowners: only an owner who lives in the home may do general construction work on it, such as additions, decks, sheds, pools, fences and siding. The owner may take out an electrical permit but may not touch the panel or service, and may replace water lines, faucets and toilets; all other plumbing needs a permit pulled by a state-licensed plumber.
- General contractors: a $10,000 residential or $250,000 commercial bond on the city’s form, returned by the insurer with signatures, power of attorney and a visible seal.
Rather not deal with the building department?
Get a free quote →Homeowners who pull their own permits also take on the job of calling in every inspection.
How to apply for a Bettendorf building permit
Check the zoning map, and the city’s floodplain map for lots near the river or Duck and Crow creeks.
Ask the Building Division for both before drawing a deck, fence or pool.
Or apply yourself if you own and live in the home.
Pick the matching application, upload the plans and cost breakdown, or file at 4403 Devils Glen Road.
Review starts only once every required item is in.
By card or check; the permit downloads from One Stop.
Book each stage by phone or email and pass the final before anyone moves in.
Review, corrections and what causes delay
The Building Division begins review only when all paperwork is in and every requirement is met, and it reviews files in the order received, so a missing survey certificate, energy report or erosion plan simply leaves an application waiting. Changes made to the plans part way through the job must be resubmitted and can bring extra review fees, charged at $50 an hour for revisions. Pools are a common holdup when the fence permit or utility approval letter is missing, and commercial projects wait on Planning’s site plan review first.
Inspections in Bettendorf
Request inspections by calling 563-344-4074 or emailing building@bettendorf.org with your name, company, any entry code and a contact phone; One Stop also takes requests. Give 24 hours’ notice for footing, electrical service, driveway approach and sidewalk inspections.
- Before concrete: the general contractor calls for the footing, approach or sidewalk inspection before the pour.
- Rough-in: the electrical, mechanical and plumbing subcontractors call for their cover inspections, then the general contractor calls for the building rough before the structure is covered.
- Final: the trade finals come first, then the general contractor’s building final, all before occupancy.
- Temporary power and gas: temporary electrical service is inspected on its own, and a gas meter can be set early once the plumber has filed the gas piping affidavit and the heating or plumbing final, or a temporary heat inspection, has passed.
Rental homes are inspected separately: a landlord registers the property with the City Clerk, then books a rental inspection through Code Enforcement and receives an inspection certificate once the home meets the city code.
Iowa building code
Bettendorf enforces its own adopted code set, the 2021 International Building and Residential codes with the 2023 National Electrical Code and the 2012 energy code, rather than relying on the state code. FEMA’s Community Status Book lists Bettendorf as participating in the National Flood Insurance Program, with its current flood maps effective April 11, 2024.
Want this handled start to finish?
Get a free quote →Iowa lets most cities and counties adopt the state building code, another code or none (a city of more than 15,000 must enforce at least the state code), but the energy, accessibility, fire, plumbing, mechanical and electrical rules apply statewide. Iowa rules
Bettendorf permit search and official resources
One Stop’s search box finds permits, licenses, planning projects and code violations by street address, licensed contractor or license holder, and registered users get an advanced search. The Building Division also posts monthly permit reports listing the permits it issued. For older files or plans, send a public records request to the city under Iowa Code chapter 22.
- Building Division
- One Stop permitting and licensing portal
- One Stop help: hours, payments, searching
- Permit applications and forms
- Permit fee charts
- Building permit fee chart (2025)
- Electrical permit fees (2025)
- Adopted building codes
- Inspection requests
- Contractor requirements and bond
- Building Division FAQ
- Shed requirements
- Decks
- Pools
- Fences
- Planning Division
- Floodplain management
- Rental housing inspection program
- Monthly permit reports
- Public record requests
- FEMA Community Status Book, Iowa
Inspections are where schedules slip.
Get a free quote →Bettendorf building permit FAQs
How much is a building permit in Bettendorf?
It depends on project value: $16 up to $500, $385 for a $40,000 job and $580 for $75,000 under the 2025 chart, plus separate electrical, plumbing and mechanical fees.
Do I need a permit for a shed in Bettendorf?
Only if it is larger than 120 square feet. Smaller sheds still have to follow the city’s placement guidelines.
Can a homeowner do their own electrical work?
Yes, with an $11 homeowner electrical permit, on a home they own and live in, but not on the electrical panel or service.
Does a pool need a fence?
Yes. Any pool over 18 inches deep needs a permit and a barrier at least 4 feet tall; if no such fence exists, the fence permit is filed with the pool permit.
Do I need a permit to replace windows?
Not for same-size replacements. A permit is needed when the header or window size changes.
What does a contractor need before applying?
A city bond on file: $10,000 for residential work or $250,000 for commercial, industrial and multifamily work.
Is my lot in the floodplain?
Search the city’s floodplain web map by address or parcel number; flood maps took effect April 11, 2024, and building there needs a floodplain development permit.
Can I pay permit fees in cash?
No. The city does not accept cash; card payments carry a 2.99% convenience fee.
Simplify Bettendorf permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Iowa. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Bettendorf sooner?
Let Alliance prepare, file, and track your Bettendorf permits while your crew stays on the job.
More Iowa permitting guides
Scott County
Read guide →Davenport
Read guide →Ankeny
Read guide →Black Hawk County Building Permit Guide
Read guide →Boone Building Permit Guide
Read guide →Boone County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Bettendorf permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.