In the City of Lake Station, the Building Department at City Hall, 1969 Central Avenue (219-850-1331), issues permits, inspects the work and enforces the zoning and development ordinances. A licensed contractor pulls each permit unless an inspector approves a homeowner permit first, the cost is read from the department’s table by estimated job value ($322 for a $25,000 job), and the office takes only cash or checks.
What requires a building permit in Lake Station?
Lake Station publishes a permit form for each kind of work rather than a single list, and its requirements page says a new home needs separate building, electrical, plumbing, HVAC and sewer permits. The forms on the department’s documents page cover:
Building and site work
- New houses and other new construction, with plans turned in to the Building Commissioner
- Additions, attached and detached garages and accessory buildings
- Remodeling, including any work that opens walls
- Roofs, with inspection of the ice and water shield
- Paving, sealcoating, asphalt and rock or stone surfaces
- Demolition, signs and swimming pools
- Tree removal by a licensed tree contractor
Trade, utility and land work
- Electrical, plumbing and HVAC permits
- Sewer repair and new sewer connections
- Water meter sets
- Digging or other earth disturbance with stormwater or sanitary sewer impacts (MS4 permit)
- Horizontal directional drilling
- Zoning, site plan and plat vacation applications
The building application adds a city rule on older homes: if walls are opened, the electrical work must be brought up to date by an electrical contractor, and no drywall or insulation may go back until the first inspection has passed.
What Lake Station decides and what the state holds
The city sets its zoning limits, sidewalk and parking rules, permit prices and contractor licensing, and it has its own Board of Licensing & Registration. Construction standards are the state’s; the department’s page, for example, gives the state energy code insulation values it looks for in new homes (R-38 ceilings, R-19 walls, R-10 foundations). A Class 1 building, such as a store, office or any building used by employees or by three or more tenants, needs the state Construction Design Release before construction unless 675 IAC 12-6-4 exempts the work.
Lake Station building department: who handles permitting
The Building Department issues every permit inside the city limits, enforces the adopted building code, administers the land use and development ordinances and reviews conditional use applications. Dina Cortez is the Building Department Administrator and Code Enforcer, and also signs as secretary to the Planning Commission and the Board of Zoning Appeals. The Lake County Plan Commission covers only unincorporated land, so it does not issue permits in Lake Station.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | City Hall, 1969 Central Avenue, Lake Station, IN 46405 |
| Phone / fax | 219-850-1331 / 219-850-1386 |
| Lsbuildingdept@gmail.com (used for roof inspection requests) | |
| Hours | Monday to Friday, 9:00 a.m. to 4:00 p.m., closed noon to 1 p.m., weekends and holidays |
| Payment | Cash or check payable to the City of Lake Station; money orders for licenses; no cards |
| Boards | Planning Commission, Board of Zoning Appeals, Board of Licensing & Registration, Stormwater Board, Sanitary Board |
Lake Station permit types
The building, trade, roof and paving applications each ask for the contractor, any licensed subcontractors, the property owner and an estimated job value that includes labor and materials, and they are not issued without a work order or contract. Contractors’ trucks must carry the business name, and the permit must be posted in the customer’s front window.
Residential permits
- New houses in the R-2 single-family district need a legal plat of survey with the stakes visible and a street address assigned, the size and location of the house on the survey, and one set of plans. A house must have at least 912 square feet of living area, a height of no more than 35 feet, a 30-foot front setback, 5-foot side yards (25-foot side yards on corner lots), sidewalks, two off-street parking spaces and an occupancy permit, on a lot of at least 60 by 125 feet.
- Additions and attached garages need foundations 42 inches deep (40 inches without a basement) on footings 8 inches thick and 16 inches wide.
- Detached garages are capped at 988 square feet and 14 feet high on the department’s page, on a 12-by-12-inch footing with a 4-inch floor, and need an electrical permit if wired. Accessory buildings may be up to 100 square feet and 10 feet high.
- Lot coverage. Structures may cover no more than 30% of a residential lot.
- Swimming pools are allowed only in single-family districts and need a building permit, with drawings at a scale of at least 1/8 inch to the foot and a plat of survey showing the pool, walks and fence. No part of the pool may be closer than 5 feet to a side or rear property line or a building line, pumps and filters must be at least 10 feet from side lot lines, and the pool or the whole property must be enclosed by a wall or fence at least 6 feet high.
- Fences need a permit from the property owner or a licensed contractor, with fees paid to the Clerk-Treasurer. Front-yard fences must be see-through and between 36 and 42 inches high; side and rear fences may be 36 to 72 inches, built of one uniform material.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial work uses the same building, trade and new construction applications, with plans turned in to the Building Commissioner; the new construction form also asks for the type and location of roof and floor trusses and I-joists. HVAC applications cover ductwork, gas furnaces, electric heat and rooftop units, and ask whether the site is in a special flood hazard area. Signs have their own permit.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Check the parcel on the June 2022 zoning district map. Special uses, special exceptions and variances go to the Board of Zoning Appeals; site plans, rezoning and plat vacations have their own applications.
- Stormwater and sewer. Digging or other earth disturbance that affects storm or sanitary sewers uses the MS4 building permit application, and sewer repairs and connections have their own permits. All connections on a lot are classified to the same address.
- Utilities. The owner must confirm that public utilities reach a new building site; call Public Works at 962-8511 as the department’s page lists it, and call 811 before digging.
- State design release. Class 1 projects need the IDHS release before construction.
Lake Station permit costs and fees
The Building Department posts a permit price table, linked as “Correct Permit Prices”, that reads the permit cost straight from the estimated job value, in $100 steps from $500 to $2,000 and in $1,000 steps above that, up to $1,081,000. The table is undated and does not cite an ordinance, and it is not labeled by permit type. Selected rows:
| Estimated job value | Permit cost |
|---|---|
| $1 to $500 | $24 |
| $1,000 | $39 |
| $5,000 | $102 |
| $10,000 | $157 |
| $25,000 | $322 |
| $50,000 | $576 |
| $100,000 | $996 |
| $200,000 | $1,720 |
| $250,000 | $2,070 |
| $500,000 | $3,820 |
| $1,081,000 (last row) | $6,567 |
Rather talk it over?
Call 1-855-478-4290 →A few rows of the table break its own pattern: the $31,000 and $32,000 rows appear twice, $70,000 and $71,000 are both $756, and $76,000 ($781) is priced below $75,000 ($792). Other charges on city forms: contractor licenses (below), a $25 Board of Zoning Appeals filing fee, and a non-refundable HVAC application fee. Payment is by cash or check only.
Trade permits and who may pull them
When a contractor does the work, the contractor must be licensed with the City of Lake Station and pulls the permit; subcontractors must be licensed too. Licenses are issued for general, electrical, HVAC, plumbing, sewer, sub and specialty contractors.
- License fees. General contractor: $125 to renew, $140 new or late after January 1. Subcontractor or specialty: $60 to renew, $75 new or late.
- Paperwork every year. A new packet each year, even if documents have not expired: at least $1 million of general liability, property damage and workers’ compensation coverage naming the city as holder, a $5,000 surety bond for all cities, towns and municipalities in Lake County recorded at the Lake County Government Complex in Crown Point, and photo IDs of everyone authorized to pull permits.
- First-time applicants for general, electrical, HVAC, plumbing or sewer licenses must bring proof of licenses from at least two other cities or towns, the city’s license requirements say.
- Conduct rules. Work vehicles must be lettered, permits posted, and every inspection called in; the form warns that skipped inspections can lead to a suspended license.
- Homeowners doing their own work may get a homeowner’s permit only with the inspector’s approval before it is issued. Wiring opened up during a remodel must be updated by an electrical contractor.
How to apply for a Lake Station building permit
Use the zoning map and the R-2 rules on setbacks, lot coverage and building size.
File the license application with insurance, the recorded bond and ID before any permit is requested.
Building or new construction, plus electrical, plumbing, HVAC, sewer, roof, paving or MS4 forms as the job needs.
A work order or contract, the plat of survey for new construction, and plans for the department’s files.
Bring the package to 1969 Central Avenue with cash or a check; the cost comes from the price table.
Put the permit in the customer’s front window before work starts.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
Applications without a signed work order or contract are not issued, and new homes wait until the stakes are set and a street address has been assigned. A homeowner’s permit waits for the inspector’s approval. Variances add time: the Board of Zoning Appeals meets at 7:00 p.m. on the fourth Wednesday of the month, applications are due at least 10 days before its preliminary meeting, and the petitioner pays for the adjacent owner list from the Lake County Auditor.
Inspections and occupancy in Lake Station
All inspections are requested by calling the Building Department at 219-850-1331; roof inspections, including the ice and water shield, are requested by email. The department’s page notes that inspectors have 48 hours to make an inspection. New construction, additions and attached garages get four inspections: footing before the concrete is poured, foundation (with beam, anchor bolts and sill plates), rough-in and final. A detached garage gets two: footing and foundation, then final. Plumbing and HVAC permits get rough and final inspections.
New homes need an occupancy permit, and the building application also requires one after a full remodel once every inspection has passed.
Indiana building code in Lake Station
Lake Station enforces the state building rules through its Building Department, and several of its forms ask whether the site is in a special flood hazard area. FEMA’s Community Status Book lists the City of Lake Station (community 180131) as participating in the National Flood Insurance Program, with flood maps effective January 26, 2023.
Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Lake Station permit search and official resources
Lake Station handles permits on paper at City Hall. Questions about an existing permit, an inspection or a contractor’s license go to the Building Department by phone or email, and board agendas, minutes and meeting dates are posted on the city’s Boards & Commissions page.
Want this handled start to finish?
Get a free quote →- Lake Station Building Department
- Building permit requirements
- Building Department documents and forms
- Permit price table (Correct Permit Prices)
- Building Permit Application
- New Construction Building Permit Application
- Electric Permit
- Plumbing Permit Application
- Mechanical / HVAC Permit Application
- Roof Permit Application
- Paving Permit Application
- Swimming pool and fence regulations
- Permit for projects with stormwater or sanitary sewer impacts (MS4)
- Sewer Repair Permit Application
- Contractor’s License application
- Contractor’s License requirements
- Board of Zoning Appeals application
- Zoning District Map (June 2022)
- Building Department staff
- Boards and commissions
- Indiana Fire Prevention and Building Safety Commission rules
- FEMA Community Status Book, Indiana
Inspections are where schedules slip.
Get a free quote →Lake Station building permit FAQs
How much is a building permit in Lake Station?
It depends on the estimated job value: the department’s table charges $24 up to $500, $157 at $10,000, $322 at $25,000 and $996 at $100,000.
Can I pay by card?
No. The Building Department takes only cash or checks payable to the City of Lake Station, and money orders for contractor licenses.
Can a homeowner pull a permit?
Yes, but a homeowner’s permit needs the inspector’s approval before it is issued; work done by a contractor must be permitted by that city-licensed contractor.
How big can a shed or detached garage be?
Accessory buildings may be up to 100 square feet and 10 feet high; the department’s page caps detached garages at 988 square feet and 14 feet high.
Do I need a permit to replace a roof or seal a driveway?
Yes. Roofs and paving, sealcoating or asphalt work each have their own permit application.
How high can a fence be in Lake Station?
Front-yard fences must be see-through and 36 to 42 inches high; side and back fences may be up to 72 inches, and a pool needs a 6-foot enclosure.
How do I schedule an inspection?
Call 219-850-1331 for every inspection; roof inspections are requested by email, and the department’s page says inspectors have 48 hours to inspect.
When does the Board of Zoning Appeals meet?
At 7:00 p.m. on the fourth Wednesday of the month in the Council Chambers at City Hall; the filing fee is $25.
Simplify Lake Station permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Lake Station sooner?
Let Alliance prepare, file, and track your Lake Station permits while your crew stays on the job.
More Indiana permitting guides
Lake County
Read guide →Lowell
Read guide →Merrillville
Read guide →LaPorte County Building Permit Guide
Read guide →Lawrence County Building Permit Guide
Read guide →Lebanon Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Lake Station permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.