In the Village of South Holland, building permits are issued by the Community Development Department at 16220 Wausau Avenue (708-210-2900 ext. 5201, permits@southholland.org). Permit applications and contractor registrations are accepted online only. Under the fee schedule updated in December 2023, residential permits cost 1.2% of the project valuation with a $35 minimum and commercial permits 1.5%, plus inspection fees paid before the permit is issued.
What requires a building permit in South Holland?
South Holland lists the common projects that need a permit, and many of them also need a plat of survey and a written scope of work. Whoever does the work, every contractor on the job must be registered with the village.
Permit required
- Additions, garages, remodeling and finishing a basement
- Decks, porches and accessibility ramps
- Roofing, siding, soffit and fascia, and windows
- Fences, residential and commercial, including replacing or altering a fence
- Driveways and paving in concrete, asphalt or paver brick; parking lot repair or replacement; site work
- Electrical, plumbing and HVAC, including replacement furnaces and air conditioners
- Sheds, pools, spas and hot tubs, lawn irrigation and solar panels
- Demolition, dumpsters and pods, signs, special events, fire suppression and detection systems, underground storage tanks, and water and sewer repairs or connections
Not required or not allowed
- Property sale inspections: South Holland neither requires nor performs them
- Residential signs: the fee schedule lists signs as not permitted at homes
Project handouts set the local limits. A shed may cover no more than 150 square feet with walls no taller than 9 feet, must stay 6 feet from a side lot line or other building, inside the 25-foot build line and out of easements, and total roofed lot coverage may not pass 35%. Residential fences may be no taller than 6 feet and may not sit in front of the building setback line; barbed wire, electric fences and sharp pickets are banned, and privacy fences must be raised 2 inches off the ground so water can pass.
What South Holland decides and what the state holds
The village has adopted the 2021 International codes (building, residential, existing building, mechanical, fuel gas, fire, property maintenance, private sewage disposal, swimming pool and spa, and wildland-urban interface, with listed appendices) and the 2023 National Electrical Code, with its own zoning ordinance and auto repair standards. It also sets its own fees and contractor registration. The energy code, plumbing code and Illinois Accessibility Code apply in the editions the state has adopted.
South Holland building department: who handles permitting
Community Development has four divisions. Building and Code Enforcement issues building permits and contractor registrations and handles building inspections and Housing Court; Planning and Zoning handles zoning, property divisions, conditional use permits and variances; Property Standards and Flood Assistance handles flood zone determinations and the flood rebate program; and Economic and Business Development works with new businesses. Fire protection plans (alarms, sprinklers, paint booths, hood and suppression systems) are reviewed for the village by the consultant FSCI in Elgin. Land outside the village in unincorporated Cook County is permitted by the county’s Department of Building and Zoning instead.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Community Development, 16220 Wausau Avenue, South Holland, IL 60473 |
| Phone | 708-210-2900 ext. 5201 (permits); ext. 5202 (code enforcement); ext. 5203 (rental team) |
| permits@southholland.org; inspections: permitinspections@southholland.org | |
| Hours | Building Department Monday to Friday, 8:00 a.m. to 5:00 p.m.; Village Hall 9:00 a.m. to 5:00 p.m. |
| Fire plan review | FSCI, 2175 Point Blvd., Suite 380, Elgin, IL 60124; 847-697-1300 |
South Holland permit types
Permits and registrations are filed in the Elements Connect portal: sign up for a user ID, log in, choose the Contractor Registration or Building Permit icon, and upload every document with the application. Each company may have only one user ID, so the village suggests a shared company email. Registered contractors from the old system should ask staff whether an ID was already created for them, and the South Holland Library offers technical help with the portal.
Residential permits
- Every permit needs a copy of the contract, and exterior work such as asphalt, concrete, fences, sheds and pools needs a plat of survey with the work marked.
- Roofing applications must say whether the roof is re-covered or torn off. If a contractor does the work, the contractor pulls the permit. Roofs are limited to two layers, need an ice barrier running 24 inches inside the exterior wall line and a drip edge, and only village-registered scavengers may supply the dumpster.
- Sheds need the plat with distances to the house and lot lines and the shed’s specification sheet; a concrete slab must be named in the description.
- Fences need the material, height, style and contractor, with the fence line drawn on the plat.
- Decks, ramps and wooden porches file a supplement giving lumber, joist and post sizes and spans, with drawn plans and a plat showing the gas meter and power lines. Footings go 42 inches deep, guards 30 to 38 inches high are required once the deck is 30 inches above the ground, stair treads are at least 10 inches deep with risers no taller than 7¾ inches, and no deck may be built within 10 feet of overhead power lines.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Architect or engineer plans are uploaded as a PDF with one 24 by 36 inch hard copy that is stamped and kept on site, and an as-built PDF is uploaded when the job is done. Commercial and industrial sets add a site plan showing all uses, building dimensions, an emergency egress plan and the parking plan, plus a passing COMcheck energy report for new buildings, additions and remodels. Vehicle repair shops follow the village’s auto repair standards, and fire protection drawings go straight to FSCI.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Check the zoning code, maps and use table; conditional uses and variances go through the Planning and Zoning division, and the Town Center and Interstate districts have design guidelines.
- Floodplain. The Property Standards and Flood Assistance division makes flood zone determinations.
- Water and sewer. New connections carry village connection and meter charges.
- Digging. The village’s permit page reminds applicants to call JULIE before digging.
South Holland permit costs and fees
Fees come from the village’s Permit and Inspection Fee Schedule, updated December 2023. The base fee is a percentage of the project valuation, and inspection fees for the inspections your permit needs are paid before the permit is issued.
| Item | Residential | Commercial |
|---|---|---|
| Base building permit | 1.2% of valuation, $35 minimum | 1.5% of valuation, $75 minimum |
| Fire suppression or detection system | 1.2% of valuation plus $90 per riser or $30 per zone | Same |
| General inspection | $35 | $75 |
| Plumbing or electrical inspection | $70 each | $100 each |
| Failed inspection or no-show | $75 | $75 |
| Plan review | In house $250 plus $0.05 per sq ft; outside reviewer at cost plus processing | Same |
| Demolition | 1% of valuation, $25 minimum | Same |
| Water connection / sewer connection | $400 plus $100 inspection and $50 water usage; meter by size / $600 | Same |
| Signs | Not permitted | $6 per $1,000 of cost, $50 minimum; face change $0.25 per sq ft, $25 minimum |
Rather talk it over?
Call 1-855-478-4290 →Worked from the schedule: a $20,000 residential remodel carries a base fee of 1.2% of $20,000, or $240, plus a $35 general inspection fee and $70 for each plumbing or electrical inspection it needs. A $100,000 commercial alteration is 1.5%, or $1,500, before inspections and plan review. Starting work before the permit is issued, paid for and posted doubles the permit fee, and the contractor can also be cited or suspended.
The village runs a flood rebate program for owner-occupied homes: it refunds 25% of an approved flood control project, up to $2,500 per home. Qualifying work includes overhead sewers, foundation crack repair and waterproofing, drain tile, downspout diversion, flood walls, disconnecting sump pumps and downspouts from the sanitary sewer, and backflow devices and lift stations. Projects must be pre-approved, with an application and two bids.
Trade permits and who may pull them
Every contractor working in South Holland must be registered before starting work, whether or not the job needs a permit, and each subcontractor registers its own company. Registration runs one year from the date payment and insurance are received and lapses if insurance certificates expire without an update. Registrations are filed and paid in the portal; email submissions are no longer accepted.
- General contractor: $150, with a $10,000 surety bond and certificate of insurance naming the village.
- Roofing contractor: $100, bond, insurance and an Illinois roofing license.
- Electrical contractor: $100, bond, insurance and a local testing certificate; electricians also file a letter of intent for each job.
- Fire sprinkler and suppression: $100, bond, insurance and an Illinois license.
- Subcontractors, specialty trades and roll-off dumpster firms: $100, bond and insurance.
- Plumbers: no fee, with a copy of the Illinois 055 plumbing license (RPZ testers also 060) and a letter of intent on company letterhead for each job.
- Fire alarm installers: no fee, with an Illinois private alarm license.
The contractor is responsible for confirming that the permit is issued, paid and displayed before work starts. Contractors may put up a yard sign only while their crew is on site, and door-to-door solicitation is prohibited in the village.
Rather not deal with the building department?
Get a free quote →How to apply for a South Holland building permit
Call 708-210-2900 ext. 5201 or email permits@southholland.org about the project.
Each contractor creates a portal account, uploads bond and insurance and pays the registration fee, then receives a certificate by email.
Prepare the contract, scope of work, plat of survey and any architect or engineer plans the handout for your project lists.
Choose the Building Permit icon and upload everything with the application.
Pay the permit and inspection fees before the permit is issued.
Display the permit before work starts and keep any stamped plan set on site.
Review, corrections and what causes delay
Plan review takes anywhere from 5 business days to several weeks depending on workload, and turnaround for simpler permits depends on the review needed and the volume of applications. The department may send a project to a third-party reviewer, with the applicant paying that cost. Fire protection plans are reviewed separately by FSCI, usually within 10 business days. Missing contracts, surveys or plan sets, unregistered contractors and lapsed insurance are what stop applications.
Inspections and certificates in South Holland
Building permit inspections are booked by email to permitinspections@southholland.org with the permit number, the type of inspection (building, electrical, rough, final and so on), the address and the on-site contact. An automatic reply confirms receipt, and a second email within 24 hours gives the scheduled day and time. Inspections are done Monday to Friday between 8:30 a.m. and 3:30 p.m.
- Required inspections are listed on the back of the permit placard, and every permit needs a final inspection; a roof, for example, gets an ice and water barrier inspection and a final.
- Failed inspections, or a contractor missing from the site at the appointed time, cost $75, paid before the re-inspection is scheduled.
- Fire systems: new alarm and sprinkler systems follow the building permit inspection process; businesses, churches, schools and home daycares also get annual fire inspections tied to their business license.
- Rental homes registered with the village are inspected by its rental team, booked at GNRHI@southholland.org or ext. 5203.
Construction is allowed from 7:00 a.m. until dusk, with no contractor work on Sundays in residential zones. Commercial projects finish by uploading an as-built set of drawings to the portal.
Illinois building code in South Holland
South Holland enforces its adopted 2021 International codes and the 2023 National Electrical Code, with local zoning and auto repair standards, through Community Development. FEMA’s Community Status Book lists the Village of South Holland (community 170163) as participating in the National Flood Insurance Program, with its current flood map dated August 19, 2008, and in the Community Rating System since October 1, 1992, at class 5 (a 25% premium discount) since October 1, 2002.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
South Holland permit search and official resources
Applicants follow their own permits and registrations in the portal. For permit histories, plans and inspection results on a property, ask Community Development at ext. 5201, or file a Freedom of Information Act request with the Village Clerk, the village’s official keeper of records.
- South Holland permits and contractor information
- Community Development Department
- Permit and inspection fee schedule (December 2023)
- Plan submission requirements
- Contractor regulations guideline
- Online contractor registration sheet
- Residential roofing handout
- Residential fence handout
- Shed permit requirements
- Deck, ramp and porch supplement
- Scheduling inspections
- Zoning code and maps
- Flood resources
- Flood prevention rebate
- Village Clerk
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →South Holland building permit FAQs
How much is a building permit in South Holland?
Residential permits are 1.2% of the project valuation with a $35 minimum, commercial permits 1.5% with a $75 minimum, plus inspection fees paid before issuance.
Can I apply by email or in person?
No. Building permits and contractor registrations are accepted online only, through the village portal; the South Holland Library can help with the system.
How do I schedule an inspection?
Email permitinspections@southholland.org with the permit number, inspection type, address and on-site contact. You will get a confirmation of the date and time within 24 hours.
How big can a shed be?
Up to 150 square feet with walls no higher than 9 feet, at least 6 feet from the side lot line and other buildings.
Does my plumber need to register?
Yes, but at no fee: plumbers register with a copy of their Illinois plumbing license and send a letter of intent for each job.
Does the village inspect homes before a sale?
No. South Holland neither requires nor performs property sale inspections; buyers may hire a private inspector.
Is there help paying for flood control work?
Yes. Owner-occupied homes can get 25% of an approved flood control project back, up to $2,500, after pre-approval and two bids.
Simplify South Holland permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in South Holland sooner?
Let Alliance prepare, file, and track your South Holland permits while your crew stays on the job.
More Illinois permitting guides
Cook County
Read guide →Westchester
Read guide →Western Springs
Read guide →Springfield Building Permit Guide
Read guide →St. Charles Building Permit Guide
Read guide →St. Clair County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about South Holland permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.