Building permits in the City of Quincy come from the Department of Inspection and Enforcement at Quincy City Hall, 730 Maine Street (217-228-4540), led by Director Michael Seaver. Applications go in through the city’s iWorQ portal or on PDF forms at the permit desk, which takes walk-ins Tuesday to Friday. Under the fee schedule in effect since May 1, 2018, one- and two-family work costs 0.25% of the construction value with a $50 minimum, and the department usually finishes its review within 3 to 5 working days of a complete application.
What requires a building permit in Quincy?
The city’s building permit page sets a wide rule: a permit is needed before starting any new project, including extensions, additions, alterations, repairs, foundations, fences and demolitions. The owner or the owner’s representative completes the application. Separate permits cover electrical, plumbing, signs, pools and demolition, and each has its own form and fee.
Permit needed
- New houses, commercial buildings, additions and foundations
- Remodeling and repairs, priced on the construction value
- Every new fence, whatever its height ($50)
- Decks, sheds and other accessory buildings, roofing and siding (flat $50 for houses)
- Swimming pools more than 24 inches deep or over 250 square feet of surface
- Electrical work on any distribution system, and plumbing that is installed, replaced, modified or repaired
- New signs and billboards, and every demolition
Extra reviews
- Site plan review for multi-family (R3), commercial (C1A, C1B, C2, C3), downtown (D1–D5) and industrial (M1–M3) projects
- Preservation Commission review of demolitions in a historic district (35 days)
- A City Engineer development permit for any work in a flood hazard area
- A street opening permit and $5,000 bond for digging in the city right-of-way
The building, electrical, plumbing and sign pages all say their permits reach beyond the city limits into the contiguous territory within 1½ miles of them, and the zoning map covers the same band. If a parcel sits just outside Quincy, call the department before assuming the county handles it.
What Quincy decides and what the state holds
Quincy adopts and amends its own construction codes. The department’s Building Codes page lists the 2018 International Building, Residential, Existing Building, Mechanical, Fuel Gas, Fire and Property Maintenance Codes, an electrical code read with Chapter 115 of the Municipal Code, and the 2021 energy code; the older building permit page still cites the 2006 building code, so ask which edition your review uses. The Illinois Plumbing Code and the 2018 Illinois Accessibility Code apply as state codes. The city also sets its own fees, licenses electrical and mechanical contractors, and runs zoning, historic preservation and floodplain rules.
Quincy building department: who handles permitting
The Department of Inspection and Enforcement handles construction permitting, building inspections, property maintenance and nuisance enforcement. Planning and Development, a separate department, runs zoning under Chapter 162, site plan review, special permits and the subdivision process, and staffs the Plan Commission, the Zoning Board of Appeals and the Preservation Commission. The Engineering Department deals with streets, driveways, flood zones and new addresses.
Short on time to read all of this?
Get a free quote →| Office | Handles | Contact |
|---|---|---|
| Department of Inspection and Enforcement | Building, electrical, plumbing, fence, pool, sign and demolition permits; inspections; certificates of occupancy; unrelated housing permits | Quincy City Hall, 730 Maine Street; 217-228-4540; inspections@quincyil.gov; Mon–Fri 8:00 a.m.–4:30 p.m.; permit desk walk-ins Tue–Fri |
| Director of Inspection and Enforcement | Department head | Michael Seaver, 217-228-4540 |
| Planning and Development | Zoning, site plan review, subdivision permits, special permits | 217-228-4515 (site plan and subdivision line) |
| Engineering Department | Street opening and driveway permits, flood zone development, new addresses | 217-228-4527; engineering@quincyil.gov |
Land beyond the city and its 1½-mile band is unincorporated Adams County, outside the reach of Quincy’s permit pages; the city’s Engineering Department assigns addresses for new construction in Quincy and in Ellington, Melrose and Riverside townships.
Quincy permit types
Quincy lists seven permits that can be filed online through iWorQ or on a PDF form: building, demolition, electrical, fence, plumbing, pool and sign. A certificate of occupancy, site plan review, subdivision permit and unrelated housing permit go through the offices in the contact table instead. The building permit application asks for the zoning district, subdivision, block and lot, the type of construction, floor areas by level, roof height, bedrooms and bathrooms, the total project cost and the party paying the fee.
Residential permits
- New houses and additions are priced on construction value and inspected in five stages, ending with a certificate of occupancy before anyone moves in.
- Decks, sheds, roofing and siding carry a flat $50 permit for one- and two-family homes.
- Fences need a $50 permit every time. Fences up to 4 feet may go anywhere on a lot, but nothing over 3 feet within 30 feet of the intersection of two public streets; fences up to 6 feet may stand in side and rear yards, and on a corner lot the street side and rear yards are limited to 4 feet. Height is the panel height, and the gap under the panels may not average more than 6 inches.
- Pools: an in-ground pool needs a fence at least 4 feet high with a positive locking gate. An above-ground pool with a wall 4 feet or higher can use a lockable ladder that swings up instead. A complete pool application is usually approved the same day.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial, industrial and multi-family buildings pay twice the residential rate and need site plan review in the R3, C, D and M zoning districts. The application notes that state law requires a registered design professional for any project other than one- and two-family dwellings and farm buildings. Change of occupancy, temporary structures up to 180 days, and towers and antennae have flat fees, and signs are reviewed by the Zoning Administrator against the sign ordinance.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Planning and Development checks the use and setbacks. The Director may grant minor yard, fence and accessory-structure variations of less than 20% of the standard, and side or rear fence heights up to 8 feet, when every surrounding owner consents in writing. Other variations go to the Zoning Board of Appeals, which meets the third Tuesday of each month at 5 p.m. and recommends to City Council; appeals of a Director’s decision are due within 30 days.
- Plan Commission. Subdivisions, rezonings and annexations go through the commission, which meets the fourth Tuesday at 7 p.m.
- Historic districts. The Quincy Preservation Commission, created in 1984, meets the first Tuesday at 5:30 p.m. and reviews demolitions of landmarks and buildings in local historic districts.
- Floodplain. Development in flood-prone areas is prohibited unless the City Engineer authorizes it with a development permit under §155.05; the application asks you to confirm the flood zone with Engineering.
- Streets and driveways. A new or wider driveway that removes curb needs an Engineering driveway permit, and any digging in the right-of-way needs a street opening permit backed by a $5,000 bond.
Quincy permit costs and fees
Building permit fees are set by Section 162.210 of the Municipal Code; the posted permit fee schedule took effect on May 1, 2018. The inspection cost is included in the building permit fee. Construction value may not be lower than the latest ICC Building Valuation Data figures.
| Work | Fee |
|---|---|
| One- and two-family: new construction, additions, remodeling and repairs | Construction value × 0.0025; minimum $50 |
| Decks, fences, sheds, roofing, siding, above-ground pools | $50 each |
| In-ground pools | Value × 0.0025 ($50 minimum) |
| Residential demolition | $45 accessory structure; $95 single story; $5 for each story above |
| Commercial, industrial and multi-family: new construction, additions, remodeling, repairs | Construction value × 0.005; minimum $75 |
| Commercial demolition | $325 single story; $50 for each story above |
| Temporary structure (under 180 days) / change of occupancy / towers and antennae | $100 / $100 / $200 |
| Signs | $25 (up to 24 sq ft) to $300 (over 150 sq ft); temporary $50; billboards $300 or $500 |
| Plumbing | $30 for up to 2 fixtures; $14 per fixture from 3; $30 water heater or backflow device; $45 water or sewer service |
Rather talk it over?
Call 1-855-478-4290 →Worked examples from the schedule: a new house valued at $300,000 costs 300,000 × 0.0025, or $750, for the building permit; a $200,000 commercial remodel costs 200,000 × 0.005, or $1,000. Electrical and plumbing permits are extra. The demolition web page lists slightly different amounts (for example $60 for a detached garage), so confirm the demolition fee when you file.
Electrical fees come from the 2026 electrical permit application. A new service costs $85 for 100 amps, $95 up to 200 amps and $150 up to 400 amps, rising to $850 at 3,001–4,000 amps. Wiring for a new house or addition is 0.07% of the construction value (minimum $50), and residential alterations are 1.5% of material and labor up to $50,000; commercial new work is 0.09% of value with a $100 minimum. Replacing only a meter base or panel on a home, up to 200 amps, is $50. All fees are paid before the permit issues.
Trade permits and who may pull them
Electrical, mechanical and plumbing work each need a separate permit from the department, and the building application names the contractor for each trade.
- Electrical: Quincy licenses electrical contractors, and Section 150.08(B)(3) requires a licensed electrical contractor for all electrical work. The one exception lets a homeowner wire their own single-family home if they intend to live there for one year after the work is finished, and service entrance equipment must still be installed by a licensed contractor. Call the inspection office two days before any wiring is covered. The department asks would-be electricians to talk to the Electrical Inspector or the Office of Inspection before buying or taking an ICC exam, because passing it alone does not guarantee a city license.
- Mechanical: the application marks mechanical contractors as needing a city license and a separate permit.
- Plumbing: permits come from the city’s Plumbing Inspector under the Illinois Plumbing Code. The contractor needs a state plumbing license (the form asks for the 055- number) and must be registered with the city; inspections are underground, rough-in and final.
- Roofing: the roofer must hold a state roofing license, and its number goes on the building application.
Rather not deal with the building department?
Get a free quote →How to apply for a Quincy building permit
Confirm the zoning district with Planning and Development and whether the lot is in a flood hazard area with Engineering.
Multi-family, commercial, downtown and industrial projects need site plan review; demolitions in historic districts go to the Preservation Commission.
Use the iWorQ online form or the PDF building permit application, with floor areas, valuation and every contractor listed.
Submit the construction drawings; a registered design professional must prepare them for anything other than a one- or two-family home or farm building.
Pay through iWorQ or at the permit desk at 730 Maine Street; trade permits are paid separately.
Mark the lot number or permit so it is visible from the street, start within 6 months and finish within one year.
Review, corrections and what causes delay
The Building Inspector reviews a complete application within 3 to 5 working days in most cases, and the same window applies to electrical, plumbing, sign and demolition reviews. Missing contractor license numbers, a flood-zone box left blank, or a project that needs site plan review or a historic district’s 35-day demolition review are the usual causes of a longer wait. Any change to approved plans must be cleared before it is built, since the applicant certifies that approval of the papers does not excuse work done another way.
Inspections and certificates in Quincy
Inspections can be scheduled and their results viewed through iWorQ, or by calling 217-228-4540. Building inspections follow a fixed order: footing (with the approved plans on site), column footing before concrete is poured, trench footing with the trench open, rough building, and final building. A certificate of occupancy must be issued before any new structure is occupied, and the applicant agrees on the application not to use the building until then.
Plumbing inspections come at the underground stage, the rough-in before anything is concealed, and the final after fixtures are set. Electrical work must stay visible until it is inspected. Demolition jobs are inspected before the permit issues, during the work if needed, and at the end, when the contractor’s bond is returned.
Illinois building code in Quincy
FEMA’s Community Status Book lists the City of Quincy (community 170003) as participating in the National Flood Insurance Program, with flood maps effective July 5, 2018. The city enforces its floodplain ordinance through the City Engineer, who must authorize any development in a flood hazard area.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Want this handled start to finish?
Get a free quote →Quincy permit search and official resources
Permit and code enforcement records can be searched in the iWorQ portal. For older files, plans or inspection records, use the City of Quincy FOIA request form or email FOIA@quincyil.gov (the request must be typed in the body of the email; attachments are not opened). The city answers within five working days, or 21 for commercial requests; the first 50 black-and-white pages are free and later pages cost $0.15 each. The FOIA officer can be reached at 217-222-1526.
- Department of Inspection and Enforcement
- Quincy permits and iWorQ application links
- Building permit requirements and inspection sequence
- Permit fee schedule, effective May 1, 2018
- Application for building permit (PDF)
- Electrical permit application, 2026 (PDF)
- Plumbing permit application (PDF)
- Construction codes enforced in Quincy
- Fence permit rules
- Pool permit rules
- Demolition permit
- Sign permit fees
- Engineering Department: street, driveway and flood zone permits
- Planning and Development: zoning and site plan review
- Zoning Board of Appeals
- Quincy Preservation Commission
- Freedom of Information requests
Inspections are where schedules slip.
Get a free quote →Quincy building permit FAQs
How much is a building permit for a new house in Quincy?
0.25% of the construction value with a $50 minimum, so a $300,000 house pays $750, plus separate electrical and plumbing permits.
Do I need a permit for a fence?
Yes, for every new fence. The permit is $50, fences in side and rear yards are limited to 6 feet, and corner-lot street sides to 4 feet.
Can I do my own electrical work?
Only in your own single-family home that you intend to live in for a year after the work; service entrance equipment still needs a licensed electrical contractor.
How long does review take?
Usually 3 to 5 working days after a complete application; pool permits can be issued the same day.
Does Quincy permit work outside the city limits?
The city’s permit pages and zoning map cover contiguous territory within 1½ miles of the limits, so call the department before building just outside town.
Does a roof replacement need a permit?
Yes. Roofing on a one- or two-family home is a $50 permit, and the roofer must hold a state roofing license.
Where do I get a driveway permit?
From the Engineering Department (217-228-4527) for any new or wider driveway that removes curb.
Simplify Quincy permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Quincy sooner?
Let Alliance prepare, file, and track your Quincy permits while your crew stays on the job.
More Illinois permitting guides
Adams County
Read guide →Hancock County
Read guide →Bond County
Read guide →Rantoul Building Permit Guide
Read guide →Richton Park Building Permit Guide
Read guide →River Forest Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Quincy permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.