In the Village of River Forest, building permits come from the Building & Zoning department at Village Hall, 400 Park Avenue (708-714-3552, building@vrf.us). New permit applications and contractor licenses are filed online only. A residential remodel or addition costs 2% of the total project cost with a $100 minimum, commercial work 2.35%, and plan review for new construction, additions and remodels takes about 3 weeks on average.
What requires a building permit in River Forest?
River Forest asks owners to get a permit before any work starts and keeps the right to require one for work that is not on its lists. If work begins without a permit, the village stops the job until one is issued, adds a surcharge (twice the permit fee on the fee schedule) and may order the unpermitted work removed.
Permit required
- New buildings, additions, structural alterations and structural repairs after fire or decay
- Decks, stairs, porches, garages, carports, skylights and framing; new or replacement windows, and doors that change size or location
- Roofs (new or re-roof), siding, gutters and downspouts, chimneys, fireplaces and tuckpointing
- Driveways, patios, walks, pavers, retaining walls, ramps, sport courts, fences, arbors and pergolas
- New central air, generators, solar panels, fuel tanks and piping, EV chargers and new HVAC equipment
- Pools, spas and hot tubs; interior, garage and whole-structure demolition
- Plumbing and electrical work on the trade lists, signs, awnings, elevators and temporary dumpsters
No permit needed
- Painting, wall coverings, trim, cabinets, countertops and floor coverings
- Window and door screens, window air conditioners, garage overhead and service doors
- Replacing a hearth, a water heater or HVAC equipment with like kind
- Residential driveway seal coating and landscaping with no grade change
- Low-voltage, cable and phone wiring; alarm systems (registration recommended); portable heaters
- Sheds of 100 square feet or less without a concrete foundation
- Tree removal on private property
Some permit-free work still has rules. A shed of 100 square feet or less must sit in the rear yard or buildable area, at least 3 feet from side and rear lot lines; a larger shed, or any shed on a poured foundation, needs a permit. Like-kind HVAC and private tree work still need village-licensed contractors. The water heater appears both on the no-permit list and on the express-permit list, so ask Building & Zoning which applies before a swap.
What River Forest decides and what the state holds
Since January 1, 2023 the village has enforced the 2018 International Code Council series (building, residential, existing building, mechanical, fuel gas, fire, property maintenance, swimming pool and spa, wildland-urban interface and solar provisions) with the 2017 National Electrical Code and local amendments in its Village Code. River Forest sets its own fees, contractor licensing, grading ordinance, zoning and historic preservation rules. The plumbing code, energy conservation code and the 2019 Illinois Accessibility Code are state codes the village applies.
Short on time to read all of this?
Get a free quote →River Forest building department: who handles permitting
Building & Zoning reviews plans, checks zoning and property maintenance, licenses contractors and issues every building, express, trade, fence, demolition and grading permit inside the village limits. The Assistant Village Administrator supervises the Building Department. Electrical and plumbing inspections are done for the village by B & F Technical Code Services. Land outside the village in unincorporated Cook County is permitted by the county’s Department of Building and Zoning, not by River Forest.
| Detail | Information |
|---|---|
| Office | Building & Zoning, Village Hall, 400 Park Avenue, River Forest, IL 60305 |
| Phone / fax | 708-714-3552 / 708-366-3702; Village Hall 708-366-8500 |
| Zoning questions | Building Official, 708-714-3557 |
| building@vrf.us | |
| Hours | Monday to Friday, 8:00 a.m. to 4:30 p.m. |
| Portal | riverforest.onlama.com (applications, contractor licenses, inspection requests) |
River Forest permit types
Every application goes through the online portal, where each permit type carries its own requirements; printed contractor applications are not accepted. The portal groups permits as structure, accessory, trade and engineering permits. Plans can be reviewed before the contractors are named, but every contractor must be named and licensed before the permit is issued.
Residential permits
- Express permits are issued over the counter while you wait for air conditioners, furnaces, water heaters, roofs, chimneys, gutters, siding, soffits, windows on properties outside historic review, tuckpointing, electrical upgrades, water service repairs, parking lot paving, dumpsters and emergency repairs. A roof that involves structural work needs a full building permit with drawings instead.
- Simple remodels without structural changes can be sped up by booking a walk-through inspection when you apply, with a $200 non-refundable deposit.
- Fences need the application, a plat of survey marked with the fence, the contract and the $100 fee. Fences may reach 7 feet, with the part above 6 feet at least 50% open; front-yard fences are limited to 6 feet, at least 80% open and of fabricated metal, and the village inspects before it approves the permit.
- Demolition needs a survey, grading plan, asbestos report, a plan protecting the parkway, a Cook County demolition permit (312-603-8200), Nicor and ComEd disconnect letters, a plumbing permit and a $1,000 hydrant meter deposit.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
The village recommends a preliminary walk-through of a commercial space before plans are drawn, attended by the Fire Marshal, the building, plumbing and electrical inspectors and, for restaurants, the Village Sanitarian. The application then goes in with five sets of drawings stamped by a registered architect (six for restaurants). Developments over 20,000 square feet may need planned development approval.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning. The village is zoned R1 to R4 residential, C1 to C3 commercial, ORIC and PRI; the Building Official (708-714-3557) will talk through whether a project needs a variation, special use or planned development.
- Historic review. Significant and landmark properties go to the Historic Preservation Commission before building, window or demolition permits are issued; a demolition can be delayed up to six months.
- Grading and stormwater. Under the 2012 grading ordinance (Title 4, Chapter 17), new homes, larger additions, pools, new hard surfaces, work in a FEMA floodway or floodplain and demolitions need grading approval designed by a licensed professional engineer.
- Utilities and digging. Call JULIE at 1-800-892-0123 at least 48 hours before digging.
River Forest permit costs and fees
Fees come from the village’s permit fee schedule, which prints no ordinance number or date. Building fees for remodels, additions and new construction are a percentage of the total project cost; most single-item permits are flat. Work started without a permit is charged twice the permit fee.
| Work | Fee |
|---|---|
| Residential construction, addition, remodel or rehab | 2% of total project cost; $100 minimum; $200 non-refundable deposit |
| Commercial construction, remodel or rehab | 2.35% of total project cost; $100 minimum; $300 non-refundable deposit |
| In-ground pool / above-ground pool | 1.5% of cost, $150 minimum / $25; electrical permit extra |
| Roof, siding, gutters, exterior remodel, fence, driveway, brick pavers | $100 each |
| Electrical | $100 plus $9 per circuit and $1.75 per opening |
| Electrical service upgrade | $75 to 200 amps; $100 to 399; $150 to 799; $200 at 800 amps and up |
| Plumbing | $100 plus $15 per fixture |
| HVAC / generator / drain tile | $100 / $115 / $115, each plus an electrical permit |
| Lawn sprinkler system | $115 |
| Demolition | $1 per sq ft; $200 minimum for accessory structures, $1,500 for a primary building |
| Dumpster on private property / in the street | $50 / $350 per 30 days |
| Parkway opening / street obstruction | $100 / $350 per 30 days |
| Certificate of occupancy | $50; $40 temporary |
| Re-inspection | $75 |
| Permit extension | 1/3 of the original fee for 3 months on a single-family home; 100% for all other permits |
Rather talk it over?
Call 1-855-478-4290 →Worked from the schedule: a $50,000 kitchen remodel is 2% of $50,000, or $1,000. An electrical job adding 4 circuits and 10 openings is $100 + $36 + $17.50 = $153.50, and three new plumbing fixtures are $100 + $45 = $145. The schedule lists the $200 residential deposit without saying whether it is credited against the percentage fee, so ask the permit clerk when you apply. Grading review is a $50 fee plus the cost of the village’s engineer, passed through to the applicant.
Trade permits and who may pull them
River Forest licenses contractors by trade: a contractor applies online for the specific work it performs, and a general contractor license is not offered. A license needs:
- The annual license fee of $125 ($187.50 for landscaping and snow removal); the express-permit page still quotes a $100 registration fee.
- An original $25,000 surety bond signed by the company principal, naming the trade and indemnifying the village (copies and faxes are refused).
- A certificate of insurance with $1 million per occurrence and $2 million aggregate, with the village named as additional insured, plus proof of workers’ compensation or a signed waiver.
Electricians also submit a copy of a State of Illinois or city electrical license and a bond that states “Electrician”; the electrical permit must be signed by the registered supervising electrician licensed and bonded with the village. Plumbers do not take out a village license, but the plumbing permit must be signed by a supervising plumber holding a current State of Illinois plumbing license, with a letter of intent on the plumber’s letterhead that is sealed or notarized; plumbers working in the street or parkway add a $25,000 excavation or sewer bond and the same insurance. Roofers submit their State of Illinois roofing license. The village’s pages describe licensed contractors on every job and say nothing about homeowner-performed work, so owners planning to do their own work should raise it with Building & Zoning before applying.
How to apply for a River Forest building permit
Use the work-requiring-a-permit sheet, and for new structures or additions call the Building Official at 708-714-3557 about zoning and historic status.
Create an account at riverforest.onlama.com; the village posts help videos and a written guide.
Each contractor applies online with bond, insurance and fee before the permit can be issued.
Choose the permit type and attach the survey, drawings and documents it lists; commercial plans need an architect’s stamp.
Answer plan review comments; express permits are issued on the spot when the paperwork and fee are complete.
Pay the fee, then display the permit placard where it can be seen from the street for the whole job.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
On average, plan review takes 3 weeks for new construction, additions and remodels, 2 weeks for a re-review of those projects and a week or less for everything else. Incomplete or inaccurate submittals are the delay the village names, and every resubmittal adds review time. Significant and landmark properties wait up to 30 days for Historic Preservation Commission review (7 days for windows), and grading plans go to the village engineer. Large jobs (whole-house demolition, 300 square feet or more of new floor area, or $200,000 or more) also need a preconstruction meeting.
Inspections and certificates in River Forest
The permit applicant books inspections at least 24 hours ahead, online through the portal (Your Account, Your Items, Schedule an Inspection) or by calling 708-714-3552, with the project number, inspection type and preferred time. Required inspections are listed in the permit conditions and usually come in two rounds, rough and final.
- Inspection types run from footing, pre-pour, slab, backfill and drain tile through framing and insulation to rough and final checks, plus occupancy.
- New foundations need an as-built survey by an Illinois licensed land surveyor, showing top-of-foundation elevations and distances to lot lines, approved before framing can continue (not required for additions).
- Failed inspections carry a $75 re-inspection fee.
Work hours are 7:00 a.m. to 6:00 p.m. on weekdays and 8:00 a.m. to 5:00 p.m. on Saturdays, with no work on Sundays or six listed holidays. Commercial occupancy follows once every inspector signs off on the finals, and restaurants also need the Sanitarian’s final, booked 48 to 72 hours before opening at 708-366-8500.
Illinois building code in River Forest
River Forest enforces the 2018 International Code Council series adopted effective January 1, 2023, with the 2017 National Electrical Code and its local amendments, through Building & Zoning. FEMA’s Community Status Book lists the Village of River Forest (community 170151) as participating in the National Flood Insurance Program, with a current flood map dated August 19, 2008, and in the Community Rating System at class 7, a 15% premium discount.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Want this handled start to finish?
Get a free quote →River Forest permit search and official resources
Issued permits can be searched and turned into custom reports on the village’s online permitting portal; advanced searches may need a registered account. Building & Zoning also keeps a public list of licensed contractors. For permit files and plans, use a Freedom of Information Act request: mail, email or hand it in at Village Hall, Monday to Friday, 8:00 a.m. to 4:30 p.m. The village answers within 5 business days (21 for commercial requests); the first 50 black-and-white pages are free, then $0.10 a letter page and $0.25 for other sizes. Denials can be appealed in writing to the Village Administrator.
- River Forest Building & Zoning
- Building permit applications (online filing)
- Work requiring a permit
- Permit and no-permit lists (PDF)
- Permit fee schedule
- Express permits
- Residential work
- Commercial work
- Plan review timeframes
- Adopted codes
- Contractor licenses
- Electrical permits
- Plumbing permits
- Fence permits
- Demolition permits
- Grading permits
- Inspections
- Construction requirements
- Zoning variations
- Historic preservation
- List of issued permits
- Freedom of Information Act requests
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →River Forest building permit FAQs
Do I need a permit to replace windows in River Forest?
Yes. New and replacement windows need a permit, issued as an express permit while you wait. On a significant or landmark property, replacing a window on a street-facing facade first goes to the Historic Preservation Commission, which has 7 days to review it.
How much does a building permit cost in River Forest?
Residential construction, additions and remodels are 2% of the total project cost, with a $100 minimum and a $200 non-refundable deposit; commercial work is 2.35% with a $300 deposit. Roofs, siding, fences and driveways are $100 each.
Can my roofer pull the permit over the counter?
A non-structural roof is an express permit, but the roofer must hold a village contractor license and a State of Illinois roofing license. Structural roof work needs a full building permit with drawings.
Do I need a permit for a shed?
Not for a shed of 100 square feet or less without a concrete foundation, as long as it meets the setbacks. Larger sheds and any shed on a poured foundation need a permit.
How long does plan review take?
About 3 weeks for new construction, additions and remodels, 2 weeks for a re-review, and a week or less for other projects.
How do I get a zoning variation?
Apply with the $750 fee by the 15th of the month for the next Zoning Board of Appeals meeting, usually the second Thursday. The board recommends and the Village Board decides; a variation lapses after nine months unless a permit is issued and work starts.
Simplify River Forest permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in River Forest sooner?
Let Alliance prepare, file, and track your River Forest permits while your crew stays on the job.
More Illinois permitting guides
Cook County
Read guide →River Grove
Read guide →Rolling Meadows
Read guide →Rock Island County Building Permit Guide
Read guide →Rockford Building Permit Guide
Read guide →Roselle Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about River Forest permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.