In Libertyville, the village’s Building Division handles plan review, permits and inspections for everything from commercial buildings to backyard fences. It is in the PNC Bank Building, 325 N. Milwaukee Avenue, Suite 203, open 8 a.m. to 4:30 p.m. on weekdays (847-918-2020), and takes PDF submittals at building@libertyville.com, with an online application for roofing, low-voltage and private sewer repair work. Fees are tied to the estimated cost of construction: 0.12% for plan review and 1.3% for the permit, each with a $75 minimum.
What requires a building permit in Libertyville?
Libertyville requires a permit for any building, electrical, plumbing, heating and air conditioning work, and a permit may also be needed to remove a tree. The village’s own shorthand is that if a job sends you to the hardware store, it probably needs a permit. Its list of the most common permit projects includes:
Structures and exterior
- Additions, new houses and structural systems, new or altered
- Decks, patios, sheds, walkways and sidewalks (public or private)
- Roofing, and siding, gutters, soffit and fascia
- New window openings or changes to openings
- Replacement windows in bedrooms and basements
- Fences (maximum height 6 feet 6 inches)
- Swimming pools, above or below ground
- Demolition and tree removal
Systems and interiors
- Remodels and commercial tenant buildouts
- Plumbing work and water heaters
- Sewer repair
- Electrical work, including electrical services
- Heating and air conditioning, new or replacement
- Driveways, on private property or in the right-of-way
A pool is never a single permit: the village says it also needs fence, site engineering and electrical permits. Separate site-work permits may come from the Engineering Division of the Public Works Department, especially for work in the public right-of-way.
Construction hours apply to every permit. No work, material hauling or equipment start-up before 7 a.m. Monday to Friday, 8 a.m. on Saturday or noon on Sunday, and work must stop by 6 p.m. on any day.
What Libertyville decides and what the state holds
Libertyville adopts and amends its building codes through Chapter 6, Building and Technical Regulations, of the Libertyville Municipal Code, sets its fees in the Village Fee Schedule, and enforces its Building and Zoning Code. It also tests and licenses electrical contractors through its Electrical Commission. The state’s share covers plumbing (the Illinois Plumbing Code and plumber licensing by the Department of Public Health), roofing contractor licensing by the Department of Financial and Professional Regulation, irrigation contractor licensing, and the Illinois energy and accessibility codes.
Libertyville building department: who handles permitting
The Village of Libertyville issues building permits for property inside its limits through the Building Division of the Community Development Department. The division reviews plans, issues permits, inspects the work and enforces the Building and Zoning Code, and it serves as staff liaison to the village’s Electrical Commission. Work in public streets and some site work is permitted separately by the Public Works Department’s Engineering Division. Unincorporated land near the village is under Lake County’s permitting instead.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building Division, PNC Bank Building, 325 N. Milwaukee Avenue, Suite 203, Libertyville, IL 60048 |
| Phone and fax | 847-918-2020 (permit counter); fax 847-918-9439 |
| building@libertyville.com (PDF submittals and contractor documents) | |
| Hours | Monday to Friday, 8 a.m. to 4:30 p.m., except village holidays |
| Online application | Roofing, low-voltage and private sewer repair permits only |
| Right-of-way and site work | Public Works Department, Engineering Division |
Libertyville permit types
Most projects use the village’s Construction Permit Application. If plans are ready but you have not yet hired the contractors, file a Plan Review Application instead so review can start, then submit the Construction Permit Application once the contractors are known. Many residential projects also need an Engineering Permit Application, and a new house adds a Watershed Development Permit Application. All documents can be sent as PDFs to building@libertyville.com.
Residential permits
| Project | What to submit |
|---|---|
| Addition | Architectural and engineering plans; existing plat of survey and one showing the addition, with trees marked (and any to be removed); a list of existing plumbing fixtures if fixtures are added; Construction and Engineering Permit Applications |
| New house | Plat of survey, architectural and engineering plans, energy calculations, photos of the existing right-of-way, and Construction, Engineering and Watershed Development Permit Applications |
| Air conditioner, new or replacement | Plat of survey showing the unit (screening is required), the HVAC company’s proposal or contract, the unit’s specification sheet, Construction Permit Application |
| Deck | Plans with step and railing details, plat of survey with the deck drawn, Construction and Engineering Permit Applications |
| Driveway | Plat of survey with the work highlighted (new area drawn to dimension), existing and new impervious-surface and lot-coverage calculations, photos of the right-of-way; Construction Permit Application for private-property work, Engineering Permit Application for right-of-way work or any change in size |
| Electrical service | Construction Permit Application; an outside disconnect is required and the work must be done by a licensed, insured electrician |
| Demolition | Water, sewer, gas and electric disconnect notices; a tree survey signed by a certified arborist; plat of survey; site plan showing the 6-foot temporary fence, silt fence, tree fencing, dumpster and portable toilet; neighbor notification; site, trash and street agreements; Construction and Engineering Permit Applications |
Not sure this scope needs a permit?
Get a free quote →The village publishes handouts for decks, fences and electrical services alongside this list. Fences may be no taller than 6 feet 6 inches.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects (stores, offices, factories and tenant buildouts) have their own Commercial Permit Information page of submittal requirements. They are reviewed under the same cost-of-construction fee formula as residential work, and elevator or other specialist reviews carry the outside consultant’s fee plus $75. Signs need a sign permit with a $75 minimum plus $1 per square foot over 75 square feet.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Engineering review. Additions, decks, demolitions and new houses file an Engineering Permit Application with the building application; right-of-way work is the Engineering Division’s.
- Watershed development. A new house needs a Watershed Development Permit Application.
- Trees. Additions show trees on the plat of survey and mark any to be removed; demolition needs a certified arborist’s tree survey and tree fencing; tree removal may need its own permit.
- School and park donations. A new home on a vacant lot may owe school and park donations.
- Zoning. Driveway applications must show lot coverage and impervious surface before and after the work, and the Building Division checks projects against the Building and Zoning Code.
Libertyville permit costs and fees
Libertyville’s building fees come from the Village Fee Schedule and are summarized on the Building Division’s Fee Summary page. Both plan review and the permit are based on the estimated cost of construction (COC) of all labor and materials, which the village works out from the ICC construction type and the floor area, not simply from your contract price. Fees charged by other village departments are in the Annual Fee Ordinance.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Plan review | COC x 0.0012; minimum $75 |
| Second plan review | No charge |
| Third and later reviews | 50% of the original fee each time |
| Project permit | COC x 0.013; minimum $75 per discipline |
| Renewal or cancellation | 20% of the original fee |
| Demolition of a principal structure | $2,500 |
| Work started without a permit | Project permit fee doubled; minimum $150 |
| First and second inspections, each discipline | No charge |
| Third and later inspections | $150 each |
| Not ready for inspection (not cancelled) | $150 |
| Hardscape inspection (patios and similar) | $75 |
| Inspection without an active permit | $150 |
| Stop work order | $250, paid before the placard is removed |
| Building or temporary occupancy bond | $500 minimum; $1,500 minimum for work needing a certificate of occupancy; $5,000 minimum for a new or demolished principal structure; $75 bond administration |
| Temporary certificate of occupancy, monthly renewal | $250 minimum; new principal structure $500 first renewal, $1,000 each later renewal |
| Electrical contractor registration: application and registration (includes examination and initial license) | $100; annual renewal of registration $120; annual renewal late fee $75 |
Worked example. If the village puts the estimated cost of construction for a project at $100,000, plan review is $120 (0.0012 x $100,000) and the permit fee is $1,300 (0.013 x $100,000), a total of $1,420 before any bond. Both figures clear the $75 minimums, and the first two inspections in each discipline are included.
Payment is by cash, by check made payable to the Village of Libertyville, or by credit card in person at the village offices for certain project types only. The village warns that it never asks for payment by wire transfer and sends fee requests only from an official village e-mail address; if a notice looks wrong, call the permit counter at 847-918-2020.
Trade permits and who may pull them
Libertyville has no contractor registration: there is no form and no fee. Instead, each contractor on a permit must be on file with the documents the Building Division lists, sent with the application or separately to building@libertyville.com.
Rather not deal with the building department?
Get a free quote →- General contractors provide a certificate of insurance naming the Village of Libertyville as certificate holder and showing general liability and workers’ compensation coverage. A contractor without workers’ compensation may submit a letter saying so and why.
- Electrical contractors provide the same insurance certificate plus an electrical license from an approved Illinois municipality, and a letter of intent for every project on company letterhead, stating the scope, signed and dated by the license holder and either corporate-sealed or notarized. The village runs its own Electrical Contractor License Exam ($100 including the first license).
- Homeowner electrical work. On a residential project where the owner wants to do the electrical work, the owner signs the village’s Electric Verification Letter.
- Irrigation contractors need the insurance certificate and a State of Illinois irrigation contractor’s license; low-voltage and HVAC contractors file insurance certificates too.
- Plumbing and roofing are state-licensed trades: plumbers through the Illinois Department of Public Health and roofers through the Department of Financial and Professional Regulation.
Contractor requirements for permits in the public right-of-way are set by the Public Works Engineering Division, not the Building Division.
How to apply for a Libertyville building permit
Confirm the property is in the village and which permits the project needs, including any Engineering or Watershed Development permit.
Send insurance certificates, licenses and letters of intent to building@libertyville.com.
Plans, plat of survey and the items on the residential or commercial submittal list for your project.
E-mail the Construction Permit Application (or a Plan Review Application if contractors are not yet chosen); roofing, low-voltage and private sewer repair permits can be filed online.
The second review is free; the third and each later one costs 50% of the original fee.
Pay as the village instructs; a $500 to $5,000 cash bond may be required.
Work within construction hours and ask the Building Division (847-918-2020) to inspect each stage.
Review, corrections and what causes delay
Because extra review rounds are charged at half the original fee from the third round on, a complete first submittal saves money as well as time. The common gaps are the ones the submittal list spells out: no tree marking on the plat of survey for an addition, missing impervious-surface and lot-coverage calculations for a driveway, no right-of-way photos for a new house, and demolition packets without disconnect notices, the arborist’s survey or the neighbor notification. Projects that also file Engineering or Watershed Development applications go through those reviews as well.
Want this handled start to finish?
Get a free quote →Inspections and certificates in Libertyville
Inspections are carried out by the Building Division (847-918-2020). The fee structure shapes how you plan them: the first and second inspections in each discipline are free, every later one is $150, and an inspection that is not cancelled when the work is not ready also costs $150. Hardscape work such as patios has a $75 inspection fee, and any inspection asked for or required without an active permit is $150.
- Stop work orders. A stop work placard may be removed only after the $250 fee is paid.
- Certificates of occupancy. Work that needs a certificate of occupancy can carry a bond of at least $1,500. A temporary certificate is renewed monthly, starting at $250; for a new principal structure the first renewal is $500 and each later one $1,000.
- Bond release. Bonds carry a $75 inspection and administration fee.
Illinois building code in Libertyville
Libertyville’s building codes are adopted and amended in Chapter 6, Building and Technical Regulations, of the Libertyville Municipal Code, which the village posts as a downloadable PDF. FEMA’s Community Status Book lists the Village of Libertyville (community 170377, Lake County) as participating in the National Flood Insurance Program, with a current flood map dated October 5, 2023, and in the Community Rating System at class 6 (a 20% discount).
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Libertyville building permit FAQs
How much is a building permit in Libertyville?
The permit fee is 1.3% of the village’s estimated cost of construction, with a $75 minimum per discipline, plus plan review at 0.12% (also $75 minimum). A job valued at $100,000 comes to $1,420.
Do I need a permit to replace windows?
Yes for replacement windows in bedrooms and basements and for any new or changed window opening; both are on the village’s permit list.
Can I file a Libertyville permit online?
Only for roofing, low-voltage and private sewer repair work. Other permits are filed by e-mailing PDFs to building@libertyville.com.
Do contractors have to register in Libertyville?
No. There is no registration form or fee, but contractors must have insurance certificates on file, and electricians need a license from an approved Illinois municipality.
Can a homeowner do their own electrical work?
On a residential project, yes, if the owner signs the village’s Electric Verification Letter; a new electrical service must be done by a licensed, insured electrician.
Inspections are where schedules slip.
Get a free quote →How tall can a fence be?
The maximum is 6 feet 6 inches, and the fence needs a permit.
What hours can construction happen?
From 7 a.m. on weekdays, 8 a.m. on Saturday and noon on Sunday, ending by 6 p.m. every day.
What happens if I start work without a permit?
The project permit fee is doubled, with a $150 minimum, and if a stop work order is posted, the placard comes down only after a $250 fee is paid.
Libertyville permit search and official resources
For the status of an application or an inspection result, contact the Building Division at 847-918-2020 or building@libertyville.com, quoting the address.
- Libertyville Building Division
- General permit information
- Residential permit submittal requirements
- Building Division fee summary
- Contractor requirements
- FEMA Community Status Book, Illinois
- Illinois Capital Development Board
- Illinois Department of Public Health – Plumbing
Simplify Libertyville permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Libertyville sooner?
Let Alliance prepare, file, and track your Libertyville permits while your crew stays on the job.
More Illinois permitting guides
Lake County
Read guide →Lindenhurst
Read guide →Mundelein
Read guide →Lincoln Building Permit Guide
Read guide →Lincolnwood Building Permit Guide
Read guide →Lisle Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Libertyville permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.