Inside Dixon, permits come from the city’s Building Department, led by Building Official Tim Shipman at City Hall, 121 West Second Street (815-288-1403, fax 815-288-0396). The department issues the major permits for building, electrical, plumbing and mechanical work, and also requires permits for fences and minor projects such as storage sheds. Its Application for Building Permit covers homes and commercial property, and contractors register with the city with insurance and a bond. The forms are in the city’s document library, and if you are unsure which one applies, the department asks you to call before you start.
What requires a building permit in Dixon?
The Building Department’s job is to protect public health, safety and welfare by administering the city’s building, electrical, plumbing, mechanical, housing and other codes, and to eliminate unsafe buildings. The city states which work needs a permit:
Major permits
- Building permits
- Electrical work
- Plumbing work
- Mechanical work: heating, cooling and refrigeration
Minor permits
- Putting up a fence
- Storage sheds
- Other minor construction projects
The city’s pages give no list of exempt work. If you are not sure whether a project needs a permit, the department’s instruction is to call it at 815-288-1403 before you go ahead with the improvement, rather than after.
What Dixon decides and what the state holds
Dixon sets its own building codes, and its ordinances and codes are hosted online by Sterling Codifiers. The city’s posted code list, updated in January 2016, names the 2015 editions of the International Building, Fire, Residential, Property Maintenance, Mechanical, Existing Building, Energy Conservation and Fuel Gas Codes, and the 2014 National Electrical Code. Because that list is from 2016, ask the department whether a newer edition applies when you file. Plumbing follows the Illinois State Plumbing Code, which the city lists alongside its own codes, with work done by plumbers licensed by the Illinois Department of Public Health; roofing contractors hold the state roofing license; energy work follows the state energy code.
Dixon building department: who handles permitting
The Building Department, part of the city’s Building & Zoning department at City Hall, issues every building and trade permit inside the city limits and enforces the housing and property maintenance rules.
| Office | Contact |
|---|---|
| Building Department (building, electrical, plumbing, mechanical, fence and shed permits) | City Hall, 121 West Second Street, Dixon, IL 61021; 815-288-1403; fax 815-288-0396; Building Official Tim Shipman |
| City Hall main line | 815-288-1485; Monday to Friday 8:00 a.m. to 4:30 p.m. |
| Lee County Building & Zoning Office (land outside the city) | Zoning Administrator 815-288-3643 |
Short on time to read all of this?
Get a free quote →Dixon (population 14,582) lies in Lee County but is a separate government: the city’s permits apply inside its limits. Lee County’s Building & Zoning Office regulates activity in the unincorporated areas and asks anyone building outside a city, village or town with its own zoning to contact it before the project begins. For a parcel near the city edge, check which side of the limits it falls on first; the Lee County building permit guide covers the county process.
Dixon permit types
Most work goes on one form, the city’s Application for Building Permit, which asks whether the property is a single-family home, a two-or-more-family building or commercial, and has check boxes for each kind of job: house or garage roof, remodel, siding, addition, shed or garage, electrical, sign or other, pool, deck or patio, sidewalk or driveway, new construction, fence, windows, demolition and retaining wall. The Building Permit Application & Forms folder of the document library also holds a temporary sign permit application, a right-of-way permit application with instructions for street-opening repairs, and the city’s fence permit guidelines for chain link, wood and vinyl fences.
Residential permits
- Roofs: say whether the job is a tear-off or an overlay and, for an overlay, how many layers are on the roof now.
- Siding, soffit and fascia: give the siding area in squares and the soffit and fascia in linear feet.
- Windows and doors: list how many and whether each replacement is the same size as the opening.
- Sheds, garages, decks, patios, sidewalks and driveways: give width, depth and square feet, attach a drawing and show the left, right and rear setbacks. For an accessory building the owner signs a statement taking full responsibility for placing it at least 5 feet from the rear property line and 3 feet from the side property line, the city’s minimum setbacks.
- Fences: give the total length, height and material, say whether it is a corner lot and whether the property pins have been located, and attach a drawing. The owner signs that the property lines on the drawing are correct to the best of their knowledge; the city is not responsible for discrepancies when a fence is placed on a property line.
- Demolition: the permit must include disconnecting the water service and the sewer lateral.
- Existing homes: the 2015 International Property Maintenance Code and the city’s housing code apply to homes already standing.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Commercial projects use the same Application for Building Permit, marked commercial, and signs are listed by number, total square footage and whether they are permanent or temporary. Work must meet the 2015 International Building, Fire, Existing Building, Mechanical, Fuel Gas and Energy Conservation Codes on the city’s list and the 2014 National Electrical Code, with plumbing under the state plumbing code. Ask the Building Department what drawings and fire protection documents your project needs before you submit, since the city’s pages do not list them.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning: check the property’s district on the 2018 City of Dixon zoning map in the document library, and the zoning rules in the city code.
- Contractor registration: the city keeps a contractor registration with insurance and bond requirements, and electricians must hold the city license before bidding or working; see the trade section below.
- Right of way: work in a street or the public right of way needs the city’s right-of-way permit, and street openings follow the city’s repair instructions.
- City limits: confirm the parcel is inside Dixon; land outside the limits is handled by Lee County.
- Floodplain: Dixon is in the National Flood Insurance Program, with a flood map last revised in August 2016; mention any mapped flood zone on the lot when you first call.
Dixon building permit fees
The city’s Building & Zoning pages and its application forms print no permit fee amounts: the Application for Building Permit has only an office-use fee and receipt line, and the contractor registration form refers to a fee without stating it. Fees are set by the city, so ask the Building Department at 815-288-1403 for the amount for your project. The application does tell you what the city records to price and track the job:
| Item | Where to ask |
|---|---|
| Project costs on the application: materials and supplies, electrical, plumbing, HVAC, and total cost including labor | Building Department, 815-288-1403 |
| Building, fence, shed, sign and demolition permit fees | Building Department, 815-288-1403 (no amounts printed) |
| Contractor registration fee | Building Department (the form mentions a fee but prints no amount) |
| Work on land outside the city | Lee County Building & Zoning Office, 815-288-3643 |
Rather talk it over?
Call 1-855-478-4290 →A registration that lapses because insurance, bond or license records were not kept current is revoked, and the contractor must file a new application and pay the fee again.
Trade permits and who may pull them
Dixon issues its own trade permits: electrical, plumbing and mechanical (heating, cooling and refrigeration) work each needs a permit from the Building Department, which administers the city’s electrical, plumbing and mechanical codes. Contractors register with the city on its Contractor’s Registration Application, choosing general, electrical, plumbing, roofing, EPA or other, and sign a Contractor’s Registration Contract. Registration is not approved without an insurance certificate and a bond that, in the form’s words, “must honor the City of Dixon”, and the contractor must update license, bond and insurance details with the Building Department every year before they expire.
- Electrical: before doing any electrical work for hire, the contractor must hold an electrician’s license with the City of Dixon, either by testing with the city or by transfer, and give the department the details before bidding, estimating or working. Where the license holder is a partner or employee, an authorization transfer form is needed and the license holder must oversee the work. Work follows the 2014 National Electrical Code on the city’s list.
- Plumbing: a state plumbing license from the Illinois Department of Public Health, with a copy and its expiration date on the registration; the city lists the Illinois State Plumbing Code.
- Roofing: a valid State of Illinois roofing license, with a copy filed with the registration.
- Lead paint: contractors list their USEPA firm number and lead renovator certificate, follow EPA lead and asbestos rules, and give owners the “Renovate Right” pamphlet where a job may disturb lead-based paint.
- Home repair contracts: the city’s contract reminds contractors that the Illinois Home Repair and Remodeling Act requires a signed contract for any project costing the homeowner over $1,000 and the “Know Your Rights” pamphlet for each project.
- Mechanical: the 2015 International Mechanical and Fuel Gas Codes on the city’s list.
The registration lists the people authorized to pull permits for the business, and the registered contractor who obtains a permit may be held responsible for code compliance and its costs. The building permit application asks for the contractor’s name and phone, with the instruction to write “self” if there is none, and the contractor contract says work may not begin until the permit has been obtained by the contractor or the property owner; ask the Building Department what an owner doing the work must provide.
Rather not deal with the building department?
Get a free quote →How to apply for a Dixon building permit
Describe the project at 815-288-1403 to learn which permits and forms apply.
Use the 2018 zoning map to find the district and confirm the parcel is inside Dixon.
Each contractor files the city registration with insurance, bond and any state license copies.
Tick the scope boxes, describe the work and materials, list sub-contractors and give the cost breakdown.
For sheds, garages, decks, driveways and fences, show sizes and the distances to each property line.
Submit to the Building Department, 121 West Second Street, 8:00 a.m. to 4:30 p.m. weekdays, and display the permit where it can be seen from the street before work starts.
Review, corrections and what causes delay
The department reviews applications against the city’s adopted codes and records who approved the permit. Plan changes and added work must be submitted to the Building Department and approved before that work begins, so a change in the field stops the job until it is cleared. A contractor whose registration was revoked for out-of-date records must file a new application and fee before it is reinstated. A parcel that turns out to lie outside the city goes to Lee County instead.
Inspections in Dixon
The city’s pages do not set out inspection stages or booking rules; ask the Building Department at 815-288-1403 which inspections your permit needs and how to book them. The contractor registration contract sets three rules that apply on every job:
- Before concealment: inspections must be done before work is covered, and any cost from covering work before approval falls on the contractor.
- Permit on display: the permit must be posted where it is visible from the street before work begins.
- Final and certificate of occupancy: the contractor must make sure a final inspection is done and a certificate of occupancy issued before accepting final payment, and must tell the owner that the certificate is needed before the new area is used.
Beyond new work, the department enforces the city’s housing and property maintenance codes, its stated aim includes eliminating unsafe buildings, and the city has a code enforcement officer. Copies of the adopted codes can be viewed in hard copy at the Building and Zoning Department in City Hall.
Want this handled start to finish?
Get a free quote →Illinois building code in Dixon
The city’s posted list (January 2016): 2015 International Building, Fire, Residential, Property Maintenance, Mechanical, Existing Building, Energy Conservation and Fuel Gas Codes; 2014 National Electrical Code; Illinois State Plumbing Code. FEMA’s Community Status Book lists the City of Dixon (community 170417) as participating in the National Flood Insurance Program, with its first flood insurance rate map dated April 15, 1988 and its current map dated August 17, 2016; the city has no Community Rating System class.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Permit search and official resources
The city posts no online permit search. For a past permit, call the Building Department at 815-288-1403 or ask at City Hall (815-288-1485).
- Dixon Building & Zoning
- Building & Zoning document library (forms, zoning map)
- Application for Building Permit
- Contractor registration application and contract
- Dixon building regulations and codes
- Building codes adopted January 2016
- Lee County Building & Zoning Office (outside the city)
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Dixon permit FAQs
Do I need a permit for a fence in Dixon?
Yes. The application asks for the fence’s length, height and material, whether the pins are located and a drawing, and the owner vouches for the property lines.
How close to the lot line can a shed go?
Accessory buildings must be at least 5 feet from the rear property line and 3 feet from the side property line.
How does contractor registration work in Dixon?
Contractors file the city’s registration application with an insurance certificate and a bond for the City of Dixon, plus copies of any state plumbing or roofing license, and update those records every year before they expire.
Do electricians need a Dixon license?
Yes. Electrical contractors must hold an electrician’s license with the City of Dixon, by testing or transfer, before working for hire.
How much is a building permit in Dixon?
Dixon does not post its permit fees online. The Building Department (815-288-1403) gives the amount when you apply.
What does a demolition permit include?
The demolition must include disconnecting the water service and the sewer lateral.
When is a certificate of occupancy needed?
After the final inspection and before the new area is used; contractors must see it issued before taking final payment.
Who handles land just outside Dixon?
Lee County’s Building & Zoning Office regulates the unincorporated areas; call 815-288-3643.
Simplify Dixon permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Dixon sooner?
Let Alliance prepare, file, and track your Dixon permits while your crew stays on the job.
More Illinois permitting guides
Lee County
Read guide →Ogle County
Read guide →Bureau County
Read guide →Douglas County Building Permit Guide
Read guide →Downers Grove Building Permit Guide
Read guide →DuPage County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Dixon permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.