Inside Winder city limits, the City’s Planning & Development Services department at 138 Sweetwater Trail reviews, issues and inspects all permits, and applications go through the online Citizen Portal with a Project Manager assigned to each project. Under the FY 2027 fee schedule a new building costs $8 per $1,000 of ICC construction value, including plan reviews, inspections and the certificate of occupancy.
What requires a permit in Winder?
Winder requires a plan review and a building or development permit before construction or remodeling. The City’s FAQs and FY 2027 fee schedule cover:
Permit needed
- New homes and commercial buildings, additions and remodels
- Mechanical system replacements
- Accessory structures: carports, detached garages and sheds
- Accessory dwelling units
- HVAC, electrical and plumbing trade permits
- Fences and retaining walls
- Solar panels and swimming pools
- Demolition, mobile homes and standalone driveways
- Change of use, signs and land disturbance
No permit
- Minor repair
- Painting
- Carpeting, new flooring and countertops
- Wall paneling, crown molding, baseboards and casing
- Removing a tree on your own private property
These lists are examples only. Call Planning & Development at 770-867-3510 for help deciding whether a permit is needed.
Winder building department: who handles permitting
Planning & Development Services reviews, issues and inspects all permit and licence requests inside the city, and its Building Inspections Division inspects new construction, remodels and additions. Beth Reynolds is the Planning and Development Services Director.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Authority | City of Winder Planning & Development Services |
| Phone | 770-867-3510 |
| Location | 138 Sweetwater Trail, Winder, GA 30680 |
| Spanish-language help | 678-425-6859 |
| Apply / inspections | Citizen Portal (iWorQ) |
Property in unincorporated Barrow County is permitted by Barrow County, not the City.
Office hours: Monday to Friday, 8:00 a.m. to 5:00 p.m.
Winder permit types and filing path
Apply online through the City’s Citizen Portal. Every land use project is assigned a Project Manager who helps with submittals, scheduling and coordination with other development staff. Permit and licence applications, inspection requests and development payments are all handled through the Project Manager.
Owners building their own home must complete a homeowners affidavit and must live in the home for at least two years to qualify. Properties in the Historic District may need a certificate of appropriateness.
Permit costs and fees in Winder
Fees come from the Fiscal Year 2027 Planning & Development Services Fee Schedule. Building permits are priced from the ICC Building Valuation Data table and include all plan reviews, inspections and the certificate of occupancy.
| Project | Fee |
|---|---|
| New construction (including accessory dwelling units) | $8 per $1,000 of construction value (100% of ICC table) |
| Modifications (additions, remodels) | $8 per $1,000 of 80% of the ICC value |
| Plan review deposit, paid with the application | $1,000 residential; $1,500 commercial (credited to the permit) |
| Fourth and later plan reviews | $300 each |
| House location plan | $100 |
| Trade permit (HVAC, electrical or plumbing) | $225, including up to 2 inspections and CC |
| Accessory structure | $225, including up to 2 inspections and CC |
| Fence or retaining wall | $100 |
| Swimming pool | $100 (trades, fence and decks extra) |
| Solar panels | $300 |
| Demolition | $200 residential; $300 commercial |
| Mobile home | $500 |
| Change of use | $125 |
| Standalone driveway | $100 |
| Building or site reinspection | $75 |
Not sure this scope needs a permit?
Get a free quote →The initial permit fee covers three plan reviews. Land disturbance permits are $1,000 or $100 per acre, whichever is greater, plus a $40 per acre NPDES inspection fee and a $3,000 bond, letter of credit or cash. In the Historic District, a certificate of appropriateness for a building is $300.
Electrical, plumbing, mechanical and gas work
HVAC, electrical and plumbing work each need a $225 trade permit, which includes the permit, up to two inspections and the certificate of completion. The first inspection is paid with the trade permit; extra inspections must be paid before they are carried out. An illuminated sign also needs an electrical trade permit, which the City recommends the licensed electrician apply for.
Fire alarm and fire sprinkler systems are reviewed and inspected by the City for $150 each, and businesses are inspected by Winder Fire Prevention before they open.
Alliance handles electrical permit applications for contractors here. More on this: who pulls the electrical permit.
Rather talk it over?
Call 1-855-478-4290 →Application documents and plan review
Every building permit needs its own floor plans, even when several buildings on a development are identical, and a site location plan showing the zoning setbacks. Stamped architect or engineer plans are required case by case; plans for a storage shed may be hand-drawn as long as they are to scale and detailed enough for the inspector to review. Signs over 30 sq ft need engineered stamped plans.
The City’s permit resources include a Subcontractor Affidavit, Authorized Permit Agent Form, Building Trade Contractors form, Homeowners Affidavit and Property Owners Authorization.
How to apply: 6-step Winder process
Make sure the parcel is inside Winder city limits rather than unincorporated Barrow County.
Call 770-867-3510 to confirm which permits the project needs.
Gather plans, affidavits and contractor forms for the scope.
File through the Citizen Portal and pay the plan review fee with the application.
Respond to review comments and pay the remaining fees.
Request each inspection by 4:00 p.m. for the next business day and pass the finals.
Winder inspections
Request inspections through the Citizen Portal, the quickest route because requests are assigned even when staff are in meetings, or by calling 770-867-3510. Requests made by 4:00 p.m. on a business day are scheduled for the next business day, and future dates can be requested up to a week ahead. Cancel or reschedule before the 4:00 p.m. cut-off.
Rather not deal with the building department?
Get a free quote →The licensed contractor or job superintendent requests the inspection and should be on site. The permit must be posted and the approved plans available to the inspector, or the inspection will fail. Work must not be covered or move on until it passes.
Inspections are routed by area, so specific times are not given except in special cases such as early concrete pours, and inspectors do not normally call ahead. Inspection results are not online; call 770-867-3510. A failed building or site inspection costs $75 to repeat.
Local Winder details that matter
Concurrent inspections: building, site and Fire Marshal inspections may be scheduled for the same day, but the inspectors will not arrive at the same time.
Building your own home: owner-builders file the Homeowners Affidavit and must live in the home for at least two years to qualify.
Historic District: projects in the Historic District may need a certificate of appropriateness from the Historic Preservation Commission; the City publishes the application, guidelines and a map to check the district boundary.
Georgia building code
Georgia's State Minimum Standard Codes apply statewide: the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, and Swimming Pool and Spa Codes and the 2023 National Electrical Code, with Georgia Amendments, in force since 1 January 2026; the energy code is still the 2015 IECC with Georgia supplements. The Georgia State Minimum Standard Codes
Winder permit search and official resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
Want this handled start to finish?
Get a free quote →- Georgia State Minimum Standard Codes
- Winder FY 2027 fee schedule
- Winder Planning & Development Services
- Winder Permits & Inspections
- DCA effective-date memorandum
- Winder Citizen Portal
- Winder Planning & Development FAQs
Winder permit FAQs
Who issues building permits in Winder?
The City of Winder Planning & Development Services Department, for property inside city limits. Barrow County handles unincorporated areas.
How much is a building permit in Winder?
New construction is $8 per $1,000 of construction value from the ICC table, including plan reviews, inspections and the CO. A $1,000 residential or $1,500 commercial plan review deposit is paid with the application and credited to the total.
Do I need a permit for a shed in Winder?
Yes. A storage shed is an accessory structure ($225, including up to two inspections), and its plans can be hand-drawn to scale with a site location plan.
Do I need a permit for a fence?
Yes. A fence or retaining wall permit is $100, including the inspection and certificate of completion.
Inspections are where schedules slip.
Get a free quote →Can I build my own home in Winder?
Yes, with a building permit and the Homeowners Affidavit; you must live in the home for at least two years.
What is the inspection cut-off?
Requests made by 4:00 p.m. on a business day are scheduled for the next business day. Results are not posted online; call 770-867-3510.
Simplify Winder permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Georgia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Winder sooner?
Let Alliance prepare, file, and track your Winder permits while your crew stays on the job.
More Georgia permitting guides
Barrow County
Read guide →Gwinnett County
Read guide →Hall County
Read guide →Woodstock Building Permit Guide
Read guide →Acworth Building Permit Guide
Read guide →Albany Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Winder permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.