Acworth, Georgia Building Permit Guide

To get a building permit in Acworth, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

How to get a building permit from the City of Acworth: who issues it, how to file, what is exempt, what it costs and how inspections work.

Authority: City of AcworthCode: Georgia State Minimum Standard Codes (2024)Phone: 770-974-2032
Authority
City of AcworthBuilding Services
Apply
Self-ServiceConstruction permit portal
Inspection cutoff
3:30pmFor next-day inspection

Inside Acworth city limits, building, electrical, plumbing and mechanical permits are issued by the City’s Building Services division at City Hall, 4415 Center Street, and applications are filed through the City’s Construction Permit Self-Service portal. A residential permit starts with an $80 base fee plus a valuation fee ($150 for work up to $25,000), and inspections run on Monday, Wednesday and Friday.

What requires a permit in Acworth?

Building Services says a building permit is needed for most construction, and that every structural change needs one: altering a roof design, moving walls, additions, decks and porches, and basement finishes. Electrical, plumbing and mechanical (HVAC) work is permitted separately.

Permit needed

  • New homes and commercial buildings, including shell-only and foundation-only permits
  • Additions, remodeling and commercial tenant finish
  • Decks and porches, and basement finishes
  • Accessory structures and retaining walls covered by the fee schedule
  • Swimming pools
  • Demolition
  • Electrical, plumbing (water, sewer and gas) and mechanical work
  • Signs, tents, construction or sales trailers, storage racking and underground fuel tanks

Exempt

  • Non-habitable accessory storage buildings under 200 sq ft (setbacks and erosion control still apply)
  • Fences
  • Retaining walls under 4 feet, with conditions
  • Sidewalks and driveways
  • Interior finish work such as painting, flooring and cabinets
  • Prefabricated pools under 24 inches deep and playground equipment
  • Detached decks of 200 sq ft or less, no more than 30 inches above grade, that do not serve an egress door
  • Ordinary repairs: replacing shingles, siding or windows, and minor maintenance

An exemption does not allow work that breaks any code or ordinance. Starting work without a required permit adds a penalty of 100% of the standard permit fee under Sec. 18-56(g)(2) of the City Code. When City offices are closed, state-licensed plumbers, electricians and conditioned air contractors may make emergency repairs if they apply for the permit on the next business day.

Acworth building department: who handles permitting

Building Services, part of the City’s Development Department, issues building and trade permits and inspects all phases of residential and commercial construction inside the city. The division is led by Kathy Vaughan, Director of GIS, Code Compliance & Building Services.

Short on time to read all of this?

Get a free quote →
Acworth permitting contact
DetailInformation
AuthorityCity of Acworth Building Services
Phone770-974-2032
Emailbuilding@acworth-ga.gov
AddressAcworth City Hall, 4415 Center Street, Acworth, GA 30101
Office hoursMonday–Friday, 8:00 a.m.–5:00 p.m.
Inspection daysMonday, Wednesday and Friday
Primary filingConstruction Permit Self-Service

Acworth permit applications and forms

Permits are filed through the Construction Permit Self-Service portal linked from the Building Services page. The City’s Permits, Applications & Ordinances page lists a separate application for each permit type:

  • Residential: building, addition, remodeling, accessory structure, foundation only, retaining wall, demolition, electrical, plumbing and mechanical permits.
  • Commercial: building, shell only, foundation only, addition, tenant finish or remodeling, accessory structure, retaining wall, demolition, electrical, plumbing and mechanical permits.
  • Specialty: swimming pool, racking, underground fuel storage tank, construction or sales trailer, tent or temporary structure, and a Tenant Occupancy Permit for a business moving into a space with no work being done.

Supporting forms include the Swimming Pool Barrier Affidavit, a Second Kitchen Affidavit, the Duct Tightness Verification Application and the Owner/Builder Affidavit. Land disturbance applications are filed through a separate City online form, and work in the right-of-way needs a Right-of-Way Utility Encroachment Permit.

Homeowners can act as their own contractor with the notarised Owner/Builder (Homeowner) Affidavit, with a copy of a driver’s licence or ID attached. The owner must live, or intend to live, in the home and must not have sold a home they built as owner-contractor in the previous 24 months. Plumbing, electrical and HVAC work still needs its own permits, even when the owner does that work.

Permits expire 6 months after the last passed inspection, or 6 months after issue if no inspection has passed. The Building Official may grant a 90-day extension if the permit holder asks in writing before the permit expires.

Permit fees in Acworth

Fees are set by the City’s Master Fee Schedule, effective July 1, 2026. Building permits are a base fee plus a fee on the project valuation, using the most current ICC Building Valuation Data, and plan review is charged separately.

Not sure this scope needs a permit?

Get a free quote →
Acworth building fees (Master Fee Schedule, July 1, 2026)
ProjectFee
Residential building, addition, remodel, accessory structure or retaining wall$80 base fee plus valuation fee
Commercial building or tenant finish/remodel$150 base fee plus valuation fee
Valuation fee, $1–$25,000$150
Valuation fee, $25,001–$50,000$300
Valuation fee, $50,001–$75,000$450
Valuation fee, $75,001 and over$6 per $1,000 (residential), $7 per $1,000 (commercial)
Residential building plan review$150
Commercial building plan review$200
Site plan review (pools, demolition, retaining walls)$100
Recreation impact fee$525 per unit
Foundation-only permit$200 residential, $300 commercial
Residential demolition$100
Construction or sales trailer$100
Change of occupancy$60
Re-inspection$75 per instance

Swimming pool permits use the same valuation bands with an $80 residential or $120 commercial base fee. Site development is priced on the Planning and Public Works pages of the same schedule: development plan review is $750, a local development permit is $500 or $100 per acre, whichever is larger, and a right-of-way permit is $150.

Electrical, plumbing, mechanical and gas work

Building Services issues electrical, plumbing (water, sewer and gas) and mechanical permits separately from the building permit, each on its own application. Residential trade permits carry an $80 base fee and commercial ones $150, and each failed inspection costs $75 to repeat.

Rather talk it over?

Call 1-855-478-4290 →
Acworth trade permit fees (July 1, 2026)
PermitFee
Electrical, temporary service (T-pole)$50
Electrical, 110–200 A service$35
Electrical, 400 A service$65
Electrical, service charge under/over 200 A$50 / $80
Electrical, residential sub-panel$30 each
Plumbing fixtures (toilets, sinks, tubs, gas line per appliance and similar)$5 each
Plumbing, water heater, water or sewer line service, grease trap$6 each
Water heater replacement$50
MechanicalBase fee plus the valuation bands above

Trade inspections follow the stages Building Services lists: underground, rough-in and final for electrical, plumbing, mechanical and gas, plus a temporary power meter set and a temp-to-permanent power release for electrical and a meter set for gas. Plumbing underground and rough-in inspections, and the gas rough-in, need a pressure test.

Application documents and plan review

Most commercial developments are reviewed by several departments: Building, Planning & Zoning, Engineering, Fire Marshal, Water & Sewer and Environmental Health. Plans for assembly, educational and institutional buildings, buildings of three or more stories and structures of 5,000 sq ft or more must carry the seal of a Georgia-registered architect or engineer. For other buildings, the applicant certifies which state law exemption allows a non-registered person to prepare the plans.

Single-family plans generally do not need an architect’s or engineer’s certification, but Building Services may require professional review if structural integrity or life safety is in question.

Each residential and commercial application names the owner, the contractor and the square footage, and is signed by the contractor or an authorised agent; homeowners acting as contractor add the Owner/Builder Affidavit. Site work is reviewed on separate Concept Plan Review and Development Plan Review applications.

Rather not deal with the building department?

Get a free quote →

How to apply: 6-step Acworth process

1. Confirm the site is in Acworth

Check the parcel on the City’s GIS map; addresses outside city limits are permitted by Cobb County.

2. Check zoning and site approvals

Commercial and site work may need a concept plan, development plan, land disturbance or right-of-way approval before the building permit.

3. Pick the right application

Download the residential or commercial application for your project type, plus the trade permit applications and any affidavits.

4. File in Construction Permit Self-Service

Upload the application and plans and pay the base, valuation and plan review fees.

5. Answer review comments

Revise plans for each reviewing department until Building Services approves them and issues the permit.

6. Book inspections by 3:30 p.m.

Request each stage in turn, wait for written approval before covering work, and pass the final inspection.

Acworth inspections

Building Services inspects on Monday, Wednesday and Friday. Requests submitted by 3:30 p.m. are scheduled for the next inspection day. Work must be inspected before it is covered, for example before concrete is placed or insulation and wall or ceiling finishes go on, and no work may continue past an inspection stage until Building Services gives written approval.

Building inspections are footing or foundation, framing, and final once the project is complete or ready for occupancy. Pools, tubs and spas, solar installations, decks, signs, accessibility compliance and property maintenance have their own required inspections. Courtesy inspections are available on request, and a permit lapses if 6 months pass without a passed inspection.

Local Acworth details that matter

City utilities: Acworth runs its own electric, sanitation and stormwater services, and its fee schedule includes power deposits, residential underground service installation ($1,250) and a stormwater fee of $62 per equivalent residential unit.

Land disturbance: grading needs a land disturbance application, with a stormwater land disturbance fee of $10.50 per acre for residential and $80 per acre for commercial sites, plus City and state Notice of Intent shares of $40 per acre each.

Signs and overlays: permanent sign permits run from $50 to $200 by sign area. Property in an overlay district uses the Overlay Approval Certificate application, at $100 for commercial and $25 for residential applications.

Want this handled start to finish?

Get a free quote →

Rooftop screening: the City publishes a Parapet Height-Screening (rooftop) Affidavit alongside its zoning forms.

Georgia building code

Georgia's State Minimum Standard Codes apply statewide: the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, and Swimming Pool and Spa Codes and the 2023 National Electrical Code, with Georgia Amendments, in force since 1 January 2026; the energy code is still the 2015 IECC with Georgia supplements. The Georgia State Minimum Standard Codes

Acworth permit search and official resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Acworth permit FAQs

Inspections are where schedules slip.

Get a free quote →

Who issues building permits in Acworth?

City of Acworth Building Services, at City Hall, 4415 Center Street, issues building, electrical, plumbing and mechanical permits for property inside city limits. Call 770-974-2032 or email building@acworth-ga.gov.

How much is a building permit in Acworth?

Residential permits are an $80 base fee plus a valuation fee: $150 up to $25,000, $300 up to $50,000, $450 up to $75,000, and $6 per $1,000 above that. Residential plan review adds $150.

Do I need a permit for a shed or a fence in Acworth?

Fences are exempt, as are non-habitable storage buildings under 200 sq ft, although setbacks and erosion control still apply. Larger accessory structures need a permit.

Can a homeowner pull a permit in Acworth?

Yes, for a home they live in or will live in, using the notarised Owner/Builder Affidavit. Plumbing, electrical and HVAC work still needs separate permits.

When does Acworth inspect?

Monday, Wednesday and Friday. Requests submitted by 3:30 p.m. are scheduled for the next inspection day.

How long is an Acworth permit valid?

6 months from issue or from the last passed inspection. The Building Official may extend it by 90 days on a written request made before it expires.

What happens if I build without a permit?

The City adds a penalty of 100% of the standard permit fee on top of the permit fees.

Simplify Acworth permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Georgia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Acworth sooner?

Let Alliance prepare, file, and track your Acworth permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Acworth permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.