Inside Richmond Hill city limits, building and trade permits come from the City’s Planning & Zoning Department, and applications, revisions and inspection requests all go through the CivicGov portal. A residential application is filed with a $100 plan review fee, house plans must be stamped for the 130 mph wind zone, and inspections must be requested by 4:00 p.m. on the business day before.
What requires a permit in Richmond Hill?
The City sorts work into two application packets, and the packet tells you which permit the job needs.
Residential building packet
- New single-family and multifamily homes
- Remodels and additions
- Accessory structures that are not prefabricated
- Temporary office trailers in residential developments
- Projects with several subcontractors (electrical, HVAC, plumbing)
- Manufactured homes
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Limited Use packet
- Change of occupancy or existing-building inspection
- Prefabricated accessory structures
- Fences and irrigation systems
- Re-roofing and window replacement
- Fire suppression and fire alarm
- Swimming pools
- Demolition (plus the demolition packet)
- Sign footers and electrical
- Stand-alone electrical, HVAC or plumbing work
Commercial and industrial new buildings, remodels and additions do not have a single public packet: the permitting office tells you which application to use. A business moving into any previously occupied or new space needs a change of occupancy permit, and a separate building permit if electrical, HVAC, plumbing or structural work is involved. Fences and irrigation always need their own permits; they cannot ride on the permit for a new house. Lot grading, land disturbance, tree removal and right-of-way encroachment have their own applications.
Richmond Hill building department: who handles permitting
Planning & Zoning covers planning, zoning, development review, permitting, inspections, code enforcement and floodplain management for the City. Brian Crooks is the Director of Planning & Zoning, and the City’s own building inspectors carry out inspections.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Authority | City of Richmond Hill Planning & Zoning |
| Phone | 912-756-3641 (permitting); 912-756-4521 (inspections) |
| permitting@richmondhill-ga.gov; inspections@richmondhill-ga.gov | |
| Office / intake | 85 Richard R. Davis Drive, Richmond Hill, GA 31324 (mail: P.O. Box 250) |
| Portal | CivicGov (account required) |
| Permit pick-up | 8:00 a.m. to 4:00 p.m., Monday to Friday |
| Fire Chief | 912-756-4664 (fire suppression and alarm permits) |
Bryan County runs its own permitting for property outside Richmond Hill city limits.
Richmond Hill permit types and filing
Register in CivicGov and submit the packet, plans, revisions and later inspection requests on the same permit record. Without portal access, call 912-756-3641 or email permitting@richmondhill-ga.gov to send a packet in. Fees can be paid online by card or eCheck.
- Residential Building Permit Application and Packet (2025): checklist, information sheet, permit application, Authorized Permit Agent Form, Owner Exemption Affidavit, residential energy code affidavit and water meter forms.
- Limited Use Permit Application and Packet (2025): checklist and information sheets for fences, roofing, accessory buildings, HVAC, pools and spas, irrigation and decks, plus the change of occupancy use form.
- Demolition Permit Application and Packet, filed with the Limited Use packet.
- Owner Exemption Affidavit, for homeowners doing the work on the home they live in. The form tells contractors building a home to sell not to sign it.
- Pool Barrier Affidavit, Manufactured Home Requirements, Lot Grading Application and the Georgia Special Inspections Guidelines.
Signs need a separate approval from the Zoning Administrator attached to the Limited Use application, and sign design review has its own application on the Projects, Applications & Forms page.
Permit costs and fees in Richmond Hill
The City does not post a building permit fee table online; the permitting office fills in the fee on the application. The building charges it does publish are a $100 plan review fee with each residential application, a $75 fee for an unscheduled same-day reinspection, $50 to restamp a set of plans, and a $500 fine for starting work before the permit is issued. Water and sewer tap, connection, meter and reuse fees are entered on the same application, and no Certificate of Occupancy is issued until they are paid.
Not sure this scope needs a permit?
Get a free quote →| Project | Fee |
|---|---|
| Local land disturbing permit | $150 plus $5 per acre |
| City NPDES fee | $40 per acre |
| Residential driveway | $100 |
| Tree removal permit | $50 residential; $150 commercial |
| Certificate of Appropriateness | $150 minor work; $500 major work |
| Building elevation review | $150 |
| Initial site development plan review | $150 |
Online card payments carry a 3% convenience fee with a $2 minimum, and eCheck payments up to $50,000 cost $2 per transaction (pricing in effect from December 18, 2025).
Electrical, plumbing, mechanical and gas work
Planning & Zoning issues the trade permits. When electrical, HVAC and plumbing are part of a new home or addition with several subcontractors, they go on the residential packet with a subcontractor list; every sub needs a valid Georgia business licence, and a copy of each sub’s business licence and state licence (where one applies) goes in with the application. A stand-alone electrical, HVAC or plumbing job by a single subcontractor goes on the Limited Use packet, with copies of the state trade licence and a Georgia business licence.
Fire suppression and fire alarm permits also use the Limited Use form, which asks for the installer’s name and certification number; the form lists the Richmond Hill Fire Chief at 912-756-4664. Restaurants need Bryan County Health Department approval, and hoods and suppression systems must be tagged and current.
For a temporary electrical service, the requesting electrician must be on site for the inspection with the dead-front covers removed, and the building may not be occupied until the Building Official issues the Certificate of Occupancy.
Alliance handles electrical permits for contractors here. More on this: who pulls the electrical permit.
Rather talk it over?
Call 1-855-478-4290 →Application documents and plan review
New home or addition
- One digital set of architectural plans designed for the 130 mph wind zone, stamped by an engineer or architect: floor plan, elevations, typical wall sections and structural plans
- Digital site plan with setbacks, easements, distances to property lines and the proposed finished floor elevation with datum
- Information sheet and signed application with a written description of the work
- Notarized Authorized Permit Agent Form or the Owner Exemption Affidavit (not both)
- State contractor licence and driver’s licences
- Energy code affidavit with REScheck
- Subcontractor list and business licences
- Water meter request and installation forms
- $100 plan review fee
Limited Use work
- Sketch of the work; construction drawings for decks, accessory buildings and pools
- Site plan on the recorded plat for fences, accessory buildings, decks and pools
- State licences for electrical, HVAC and plumbing contractors
- Georgia business licence for every trade
- Change of occupancy use form and floor sketch with room uses
- Signed roofing affidavit for re-roofs
- Bryan County Health Department approval for food service and public pools
For work on an existing building, the information sheet asks for the market value of the structure and the cost of the work. If the work equals or exceeds 50% of the market value, the substantial improvement rules for flood areas apply.
How to apply: 6-step Richmond Hill process
Make sure the parcel is inside Richmond Hill city limits rather than unincorporated Bryan County, and note its flood zone.
Residential packet, Limited Use packet, or an email to permitting@richmondhill-ga.gov for commercial and industrial work.
Fill in the checklist and put it on top; attach plans, site plan, licences, affidavits and the $100 plan review fee where it applies.
Register, upload the packet and pay online by card or eCheck.
Upload revisions on the same permit; issued permits can be picked up 8:00 a.m. to 4:00 p.m. on weekdays.
Request inspections a business day ahead, submit the final elevation certificate in flood zones, pay tap fees, then get the CO.
Rather not deal with the building department?
Get a free quote →Richmond Hill inspections
Request inspections in CivicGov. Without portal access, call 912-756-4521 or email inspections@richmondhill-ga.gov, giving your name, the permit number, the builder or owner, the location, the inspection type and a contact number. Requests must be in 24 hours ahead and no later than 4:00 p.m. on the business day before; the older residential packet says 5:00 p.m., so use the earlier time. Don’t call more than one day in advance.
Specific times cannot be booked. On the day, call after 8:15 a.m. to find out whether you are before or after noon; concrete pours are always scheduled first. Cancel by 9:00 a.m., and pay any reinspection fee by 9:00 a.m. to stay on that day’s list. Results are sent by email.
Before the first inspection, the job box must hold the permit, the approved stamped plans and the approved site plan, the lot number must be posted, the backflow device installed on the water lateral, erosion control in place and a chemical toilet on site off the street. The City’s Residential Inspection Reference Checklist then runs through the saw pole, footing or stem wall, under-slab plumbing, sewer tie-in, slab, sub-floor, nailing, the mechanical, plumbing, electrical and framing rough-ins, insulation, power release and the building, electrical, mechanical and plumbing finals. For footing, slab and pier inspections the property pins must be visible with string lines pulled so setbacks can be measured.
Local Richmond Hill details that matter
Flood zones: the City has had a flood damage prevention ordinance since April 21, 1992. In a Special Flood Hazard Area, submit an under-construction elevation report and a complete final FEMA elevation certificate, and allow three days for the final certificate to be reviewed before the CO.
Grading and erosion control: each house permit comes with the approved neighborhood drainage plan for the lot, and no CO is issued until the lot drains as shown. Erosion control must be in place before the first inspection and within seven days of starting work, with no dirt in the road or storm drains.
Working hours: construction and demolition are not allowed from 10:00 p.m. to 7:00 a.m. on weekdays or from 10:00 p.m. to 9:00 a.m. at weekends. Dumpsters and portable toilets may not be placed in the street.
Permit life: a permit must be renewed if work has not started within six months or stops for a year.
Utilities and HOAs: the application asks whether power comes from Coastal EMC or Georgia Power, and the applicant is responsible for any property owners’ association approvals before building.
Want this handled start to finish?
Get a free quote →Georgia building code
Georgia's State Minimum Standard Codes apply statewide: the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, and Swimming Pool and Spa Codes and the 2023 National Electrical Code, with Georgia Amendments, in force since 1 January 2026; the energy code is still the 2015 IECC with Georgia supplements. The Georgia State Minimum Standard Codes
Richmond Hill permit search and official resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
- Georgia DCA current state minimum codes
- Richmond Hill Planning & Zoning
- Richmond Hill Building Permits and Inspections
- Richmond Hill CivicGov portal
- Richmond Hill Residential Building Permit Packet (2025)
- Richmond Hill Limited Use Permit Packet (2025)
- Richmond Hill Residential Inspection Reference Checklist
- Richmond Hill Development and Review Fees
- Richmond Hill Projects, Applications & Forms
Richmond Hill permit FAQs
Who issues building permits in Richmond Hill?
The City of Richmond Hill Planning & Zoning Department, for property inside city limits. Unincorporated areas are handled by Bryan County.
Inspections are where schedules slip.
Get a free quote →How do I apply for a building permit in Richmond Hill?
Register in the CivicGov portal and upload the residential or Limited Use packet. Without portal access, email permitting@richmondhill-ga.gov or call 912-756-3641.
How much does a building permit cost in Richmond Hill?
The City does not publish a building permit fee table online. A residential application is filed with a $100 plan review fee, and the permit fee is set by the permitting office.
Do I need a permit for a fence or a new roof in Richmond Hill?
Yes. Fences, re-roofs, window replacement, pools and prefabricated sheds all use the Limited Use permit packet, and a fence always needs its own permit.
Can a homeowner pull a permit in Richmond Hill?
Yes, for work on the home you live in. Submit the Owner Exemption Affidavit with the application; contractors building homes to sell may not use it.
When do I have to book an inspection?
At least 24 hours ahead and by 4:00 p.m. on the business day before. Call 912-756-4521 after 8:15 a.m. on the day to learn whether it is a morning or afternoon visit.
What happens if I start work without a permit?
The City’s residential packet sets a $500 fine for beginning work before the building permit is issued.
Simplify Richmond Hill permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Georgia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Richmond Hill sooner?
Let Alliance prepare, file, and track your Richmond Hill permits while your crew stays on the job.
More Georgia permitting guides
Bryan County
Read guide →Chatham County
Read guide →Savannah
Read guide →Rincon Building Permit Guide
Read guide →Riverdale Building Permit Guide
Read guide →Rockdale County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Richmond Hill permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.