The City of East Point Planning & Community Development Department operates separate Permits and Building Inspections divisions. The Permits Division handles application intake, coordinates plan review and ultimately issues the permit and Certificate of Occupancy or Completion for new construction and renovations in the City.
What requires a building permit in East Point?
East Point publishes separate building applications for new 1- and 2-family residential construction and for commercial, multifamily and existing residential work. The City’s application page places triplexes, quadraplexes and apartment buildings on the commercial application track.
The same City page lists existing residential additions, alterations, general repairs, renovations, fire restorations, pools, siding and windows under the second building-permit application. It also lists commercial work such as antenna/co-location installations, EV charging stations, conveyors and racking/shelving installations.
Demolition work has a separate power-kill request form, and the City publishes separate paths for MEP, fire alarm/sprinkler/irrigation, decks, driveways, fences, land-development permits and signs.
Who issues permits in East Point?
The City lists the permitting counter at East Point City Hall, 2757 East Point Street, Ground Floor, East Point, GA 30344. Current posted hours are Monday through Friday, 8:00 a.m. to 5:00 p.m., with walk-in application intake and processing from 8:30 a.m. to 3:30 p.m.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Permits | 2757 East Point Street, Ground Floor |
| Phone / email | (943) 200-2029, option 1; permits@eastpointcity.org |
| Portal | BS&A Online |
East Point permit types and BS&A filing
East Point uses BS&A Online for permit applications, document uploads, fee payment, record status and inspection scheduling. To link an online account to City records, request a web PIN through the City's online Web PIN Request Form; you do not need to call the office.
The City’s review matrix is scope-specific. Its published FAQ lists Building Permits as involving Building, commercial pretreatment, Electric, Fire, Zoning, Water & Sewer, Permits, Sanitation, Transportation and Storm Water. MEP permits use a narrower Permits-and-Inspector route, while LDPs involve Storm Water, Arborist, Building, commercial pretreatment, Economic Development, Electric, Fire, Permits, Zoning, Sanitation, Transportation and Water & Sewer.
Permit costs and fees in East Point
East Point's current Planning & Community Development fee schedule lists a $75 base fee for building and rehab permits, single-family and commercial, plus a fee based on the value of the job.
The valuation table starts at $0 for jobs of $1 to $500 and rises in steps for higher values. Building plan review is one-half of the building permit fee. Expedited review costs double the regular fee: 7 business days for building plan review or 2 business days for a mini review.
Not sure this scope needs a permit?
Get a free quote →Commercial reinspections are $90, $110 and $130 for the first, second and third trips, and residential reinspections are $70, $90 and $110.
Electrical, plumbing, mechanical and fire permits
East Point’s permit workflow identifies MEP permits as a distinct review path handled through the Permits Division and inspectors. Fire alarm, sprinkler and irrigation records involve Building, Permits, Fire, Water/Sewer and Electric reviewers according to the City’s published permit FAQ.
File trade work under its own BS&A record. The City also publishes instructions for tradesmen applying for permits and for downloading stamped plans after review.
Application documents and plan review
East Point publishes a step-by-step permit sequence that starts with determining whether a permit is required and who can pull it, then moves through the fee schedule, BS&A account setup, permit application, plan review, technical review, stamped-plan download, trade permits, inspections and Certificate of Completion or Occupancy.
For residential work, the City publishes plan-submittal guides for accessory structures, additions, basement finishes, covered patios/carports/pergolas, decks and uncovered patios, reroofs and swimming pools. Each guide lists the documents needed for that project type.
When a plan review is disapproved, East Point’s FAQ says the permit has not been issued and recommends requesting a plan-review meeting to clarify comments. Resubmittal documents are uploaded through BS&A so the next review cycle can begin.
Rather talk it over?
Call 1-855-478-4290 →How to apply: 6-step East Point process
Separate new 1- and 2-family construction from multifamily, commercial and existing-residential work.
Create the account and request a web PIN through the City's online form.
Use the project-specific submittal guide and attach the required plans and supporting files to the BS&A record.
Respond to the departments assigned to the record type and upload corrections through BS&A when needed.
Book inspections in BS&A by 3:30 p.m. for the next business day.
Pass required final inspections and complete the City Certificate of Occupancy or Certificate of Completion process.
East Point inspections
All building inspections are scheduled through the BS&A Online portal. Requests for the next available business day must be in by 3:30 p.m. The inspections phone line is (943) 200-2029, option 4.
Rather not deal with the building department?
Get a free quote →Inspectors take phone calls from 7:00 a.m. to 8:30 a.m. and inspect from 9:00 a.m. to 3:30 p.m., Monday through Friday. Occupied homes are not inspected unless the owner or an authorized agent is present. Lock-box codes are accepted for unoccupied sites, but inspectors will not inspect with an active alarm system.
East Point also makes the sequencing rule explicit: work cannot proceed beyond the point of a required inspection without approval, and noncompliant work cannot be covered or concealed until authorized. The Building Official may require covered work to be exposed for inspection.
Georgia building code
Georgia's State Minimum Standard Codes apply statewide: the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, and Swimming Pool and Spa Codes and the 2023 National Electrical Code, with Georgia Amendments, in force since 1 January 2026; the energy code is still the 2015 IECC with Georgia supplements. The Georgia State Minimum Standard Codes
Official East Point permitting resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
Want this handled start to finish?
Get a free quote →- Georgia DCA current state minimum codes
- East Point fee schedule
- East Point permit applications and forms
- East Point Building Inspections
- East Point Permits Division
- East Point plan-review guide
East Point permit FAQs
Does East Point use BS&A for permits?
Yes. The City uses BS&A Online for permit records, document uploads, payments and inspection scheduling.
What is the inspection cutoff?
The City states that next-available-business-day inspections must be scheduled by 3:30 p.m.
Are triplexes reviewed as residential?
East Point’s application page directs new residential construction with 3 or more units to the commercial application track.
Does East Point publish current permit fees?
Yes. Planning & Community Development publishes a fee schedule with valuation-based building permit fees and reinspection charges.
Inspections are where schedules slip.
Get a free quote →Who issues the CO or Certificate of Completion?
The City Permits Division states that it ultimately issues permits and Certificates of Occupancy or Completion for new construction and renovations in the City.
Simplify East Point permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Georgia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in East Point sooner?
Let Alliance prepare, file, and track your East Point permits while your crew stays on the job.