Municipal Guide Georgia Fulton County

Fulton County Building Permit — Filed & Tracked For You

Everything contractors, builders, and developers need to know about Fulton County building permits — why the county's own permitting footprint shrank to the Fulton Industrial District, which city permits your address, the original-signature rule, the trade permit forms, and the temporary power affidavits.

Authority: Fulton County Public Works — Permits and Plan ReviewCode: 2024 Georgia State Minimum Standard CodesWatch for: Fifteen cities permit their own construction
Authority
Public WorksPermits & Plan Review
Footprint
Industrial DistrictCities permit the rest
Signatures
Originals onlyNo photocopies accepted
Since 2017
Dept dissolvedSouth Fulton took over

Fulton County is Georgia's most populous county and permits the least of its own land. On July 3, 2017 the Department of Planning and Community Services ceased to exist as a standalone department — permitting for all of south Fulton except the Fulton Industrial Business District passed to the new City of South Fulton, and what remained moved into Public Works.

So the practical question here is almost never how to file with the county. It is which of the fifteen cities permits your address — and whether the parcel happens to fall in the industrial district the county kept.

Applies to the Fulton County permitting jurisdiction, effectively the Fulton Industrial Business District. Atlanta, Sandy Springs, Roswell, Johns Creek, Alpharetta, Milton, South Fulton, College Park, East Point, Hapeville, Fairburn, Palmetto, Union City, Chattahoochee Hills, and Mountain Park each permit their own construction.

🔢

Originals, not scans. Fulton County does not accept photocopies of signatures on any permit application form, and required notarised stamps must be original too. This is the most common reason a Fulton application is rejected before review even begins.

What requires a permit in Fulton County?

Fulton County is the most populous county in Georgia, and it is also the county that permits the least of its own land. That is not an accident of geography — it is the result of a deliberate dissolution. On July 3, 2017 the Fulton County Department of Planning and Community Services ceased to exist as a standalone department. Planning, zoning, permitting, building inspections, and land development for all of south Fulton — except the Fulton Industrial Business District — became the responsibility of the newly incorporated City of South Fulton.

What remained moved into Public Works. Planning, zoning, permitting, building inspections, and land development for the Fulton Industrial Business District are now provided by the Department of Public Works, through its Permits and Plan Review group, which reviews land disturbance permits and building permits for compliance with county regulations.

So the practical question in Fulton is almost never how do I file with the county. It is which of the fifteen cities permits this address. The opposite process has been reshaping metro Atlanta for twenty years. Sandy Springs incorporated in 2005 and was followed by Johns Creek and Milton in 2006, Dunwoody in 2008, Peachtree Corners in 2012, Brookhaven in 2013, Tucker and Stonecrest in 2016 and 2017, South Fulton in 2017, and Mableton in 2022. Each incorporation moved permitting authority off the county and onto the new city on a specific date. A contractor who filed a job with the county five years ago may be filing the same job with a city today, and the county will not forward it.

Whichever authority you land on, the enforced code is the same: the Georgia State Minimum Standard Codes — the 2024 International Building Code and 2024 International Residential Code with Georgia Amendments, alongside the 2024 International Plumbing, Mechanical, Fuel Gas, and Swimming Pool and Spa Codes and the 2023 National Electrical Code with the 2026 Georgia Amendments. Georgia turned its codes over on January 1, 2026. The Board of Community Affairs, acting on the recommendation of the State Codes Advisory Committee, adopted the 2024 editions of the building, residential, plumbing, mechanical, fuel gas, and swimming pool and spa codes, together with the 2023 National Electrical Code carrying the 2026 Georgia Amendments. A project drawn to the previous editions is drawn to a superseded code, and the Georgia Amendments — not the base I-Code text — are what the plan reviewer reads.

Permit required

  • New construction, additions, alterations, and tenant finish work
  • Re-permits of work under a lapsed permit, which reference the old permit number
  • Electrical, plumbing, mechanical, and gas work, filed on trade permit forms
  • Temporary electrical service, on its own notarised affidavit
  • Land disturbance, reviewed by Permits and Plan Review alongside building permits
  • Demolition and change of use within the county's permitting jurisdiction
  • Adult entertainment oriented business occupancy, which the application asks about directly

Typically exempt

  • Painting, flooring, cabinetry, and other cosmetic work
  • Ordinary repairs that do not touch structure or a regulated system
  • Work inside any of Fulton's fifteen cities — permitted by that city, not exempt
  • Work in south Fulton outside the Industrial District — City of South Fulton since 2017
⚠️ Do not assume a Fulton County mailing address means a Fulton County permit. Atlanta, Sandy Springs, Roswell, Johns Creek, Alpharetta, Milton, Mountain Park, Chattahoochee Hills, College Park, East Point, Hapeville, Fairburn, Palmetto, Union City, and South Fulton all permit their own construction. The county's own permitting footprint is the Fulton Industrial Business District.

Fulton County building department: who handles permitting

Permitting sits inside the Department of Public Works, under Planning, Zoning and Permitting, in the Permits and Plan Review group. That is an unusual home for a building department, and it is a direct consequence of the 2017 dissolution — when the standalone planning department went away, its surviving functions were absorbed rather than rebuilt.

Fulton County also issues business licences only for businesses located in the Fulton Industrial District. Every other business licence in the county is issued by the city. Environmental health inspections — restaurants, public pools, hotels and motels — are handled separately again, through the Fulton County Board of Health, Environmental Health Division.

The paperwork rules are stricter than most Georgia counties and they have been in force for years. Fulton County does not accept photocopies of signatures on any permit application form. All signatures must be original, and any required notarised stamps must be original. That single rule turns a scanned and emailed application into a rejected one, and it is the most common reason a Fulton file bounces on intake.

Fulton County permitting contact
DetailInformation
AuthorityFulton County Department of Public Works — Permits and Plan Review
ScopeFulton Industrial Business District; the county's fifteen cities permit their own work
What changedPlanning and Community Services dissolved July 3, 2017
SignaturesOriginal only — photocopies are not accepted
NotarisationRequired stamps must be original, not copies
Business licencesCounty issues only inside the Fulton Industrial District
Environmental healthFulton County Board of Health, Environmental Health Division
ApplicationBuilding Permit Application with Appendix I agreement and Site Plan Checklist
💻

The county's Building Permit Application is a four-page document that absorbed two things that used to be separate: page 3 carries the Appendix I agreement, which used to be its own form, and page 4 is a Site Plan Checklist. Filing an older standalone Appendix I alongside a current application is a sign the applicant is working from a superseded form set.

The City of South Fulton and Fulton County are different authorities with similar names, and the split is recent enough that search results still mix them. South Fulton runs its own permitting through the SagesGov portal. If the project is in south Fulton and not in the Industrial District, it is a city matter and has been since 2017.

Fulton County permits: record types and what each covers

Fulton's record set reflects a department that kept its forms and tightened its intake. Trade permits are split into Pay and No Pay forms, temporary power has its own notarised affidavits, and property ownership information now appears on every trade form. These are the records you will file:

Residential permit types

Residential permit types in Fulton County
Permit typeWhat triggers itReview pathFee basis
New constructionNew dwellings, additions, and accessory structures above the local size thresholdFull plan review against the 2024 IRC with Georgia Amendments, plus zoningValuation-based
Renovation / alterationStructural changes, layout changes, or added plumbing, mechanical, or electricalPlan review scaled to scope; existing-building provisions apply only where locally adoptedValuation-based
ReroofRoof covering replacement, recover, and structural deck repairDry-in and deck inspection; plan review rarely requiredValuation or squares
Solar photovoltaicRooftop or ground-mount arrays, with or without battery storageElectrical review led, with structural review of the attachmentFlat or system-size based
Battery energy storageWall or floor-mounted storage added to a dwellingElectrical review plus fire separation and location checkFlat or per-permit minimum
ElectricalService changes, panel upgrades, new circuits, EV chargers, and rewiringTrade review; filed as its own record under a Class I or Class II licencePer-permit minimum or per-device
PlumbingNew piping, repipes, fixtures, gas piping, and water heater replacementTrade review under a Journeyman or Master licencePer-permit minimum or per-fixture
Mechanical / HVACChangeouts, new ductwork, and refrigerationTrade review; conditioned air licence class keyed to system capacityPer-permit minimum or per-unit
Deck and porchNew decks, screened porches, and structural rebuildsFooting and framing review against the residential codeFlat or valuation-based
Pool and spaIn-ground and above-ground pools, spas, barriers, and bondingStructural, barrier, and electrical bonding review under the 2024 ISPSCValuation-based
Accessory structureSheds, detached garages, and carports above the local size thresholdZoning first, then structural review where applicableFlat or valuation-based
DemolitionFull or partial demolition of a structureUtility disconnect verification and asbestos notificationFlat
Land disturbanceClearing, grading, and any disturbance above the local thresholdErosion and sedimentation review on its own statutory clockPer-acre or valuation-based
New Residential ChecklistA new home application, checked against the county's one-page listCompleteness check before review beginsStandard residential basis
Owner-builder permitAn owner acting as their own general contractorNotarised acceptance of sole responsibility for code complianceStandard residential basis

Commercial permit types

Commercial permit types in Fulton County
Permit typeWhat triggers itReview pathFee basis
New constructionGround-up commercial, industrial, and multifamily buildingsFull multi-discipline review; sealed plans requiredValuation-based
Tenant build-outInterior fit-ups and suite build-outs in an existing shellConcurrent building, trade, and fire reviewValuation-based
Renovation / alterationStructural, envelope, or system changes to an existing buildingPlan review scaled to scope; accessibility triggers attachValuation-based
Change of occupancyConverting a building from one occupancy classification to anotherLife-safety, accessibility, and zoning reviewValuation or flat
Shell buildingA building permitted without a known tenant or useShell review only; no certificate of occupancy until a build-out closesValuation-based
ReroofCommercial roof covering replacement or recoverStructural check on added dead load; fire review where applicableValuation or squares
Solar photovoltaicCommercial rooftop, carport, and ground-mount arraysStructural, electrical, and fire access reviewValuation or system-size based
ElectricalService, distribution, and branch circuit workTrade review; separate record from the building permitValuation or per-device
PlumbingSupply, waste, vent, grease, and gas systemsTrade review; backflow and grease interceptor sign-offs attachValuation or per-fixture
Mechanical / HVACRooftop units, ductwork, exhaust, and refrigerationTrade review; energy compliance documented against the 2015 IECCValuation or per-unit
Fire protectionSprinkler, standpipe, alarm, hood, and suppression systemsFire review under the state Safety Fire Commissioner's adopted codesValuation or per-device
SignWall, monument, and illuminated signageZoning review plus electrical where illuminatedFlat or per-sign
Land disturbanceSite clearing, grading, and stormwater installationErosion and sedimentation review as a Local Issuing AuthorityPer-acre or valuation-based
Tenant finishFit-out of a tenant space, with tenant or occupant name stated on the applicationCommercial building permit processCost of construction with proof of estimate
Re-permitWork resuming under a previously issued permitReferenced to the old permit number on the applicationCost of construction basis

Residential

  • Single-discipline review in most cases
  • Trade records filed separately under Chapter 14 licences regardless of job value
  • State licence required once the work exceeds the statutory threshold, per project
  • A private professional provider may be engaged to shorten the review path

Commercial — multi-discipline

  • Concurrent review across building, trades, fire, and zoning
  • Signed and sealed plans across every affected discipline
  • Land-disturbance review runs on its own statutory clock under Title 12
  • Accessibility and life-safety review attach to any change of occupancy

Records you will actually see in Fulton County

Fulton County record catalog
RecordWhat it covers
Building permitNew building, addition, alteration, or tenant finish, on the four-page county application
Re-permitWork resuming under a lapsed permit, referencing the old permit number
Trade permit — PayElectrical, plumbing, mechanical, or gas work carrying a fee
Trade permit — No PayTrade work filed against an existing permitted scope
Temporary Power Pole (T-Pole) affidavitTemporary electrical service to a site, notarised by the electrical contractor
Temp to Perm affidavitTemporary power connection to permanent service, also notarised
Land disturbance permitReviewed by Permits and Plan Review on the Title 12 track
New Residential ChecklistA one-page list of everything that makes a new-home application complete

Solar permits in Fulton County

Solar is filed as its own record across Georgia rather than as a line item on a building permit, and it is reviewed on two tracks at once: the electrical side (conductors, overcurrent protection, rapid shutdown, labelling, and the service or supply-side connection, all against the 2023 National Electrical Code with the 2026 Georgia Amendments) and the structural side (attachment detail, rail spacing, and whether the existing framing carries the added dead load).

Solar in Fulton is nearly always a city permit, because the county's own permitting footprint is the industrial district. Establish the authority before you design the array — Sandy Springs, Roswell, Johns Creek, Alpharetta, Milton, and Atlanta each run their own review, and a rooftop array is exactly the scale of job where the address gets assumed.

The covenant question comes up on nearly every residential array, and Georgia answers it less generously than several neighbouring states. Georgia's Solar Power Free-Market Financing Act (O.C.G.A. § 44-3-113 and Title 46, Chapter 3, Article 8) makes third-party solar financing lawful and limits a property owners' association's ability to prohibit solar outright, but Georgia gives homeowners materially less protection than North Carolina or Florida do: an association retains real authority over placement and appearance, and a covenant restricting where panels may sit on the roof will usually stand. Read the covenants before designing the array, not after.

Utility interconnection runs on its own clock alongside the permit. Georgia Power and the state's electric membership corporations each set their own application, meter, and witness-test sequence, and permission to operate is not something the building department controls — plan for the two tracks to finish at different times.

Roofing permits in Fulton County

A roof covering replacement needs a permit across most of Georgia. The permit is usually quick, but it is not optional, and the inspection that matters happens before the covering goes on rather than after.

Because Georgia enforces a statewide minimum code, there is no state product-approval database to search and no approval number to cite on the application. The assembly has to comply with the adopted code and the manufacturer's listed installation instructions, and that pairing is what the inspector checks — which makes the manufacturer's instructions a document worth having on site.

Reroofs across Fulton are city permits in almost every case. Where the county does permit, remember the originals rule: a roofing contractor emailing a scanned, signed application is filing a document Fulton will not accept.

Sequencing is where reroofs go wrong. The deck and dry-in condition has to be visible when the inspector arrives, so covering it first means opening it back up. Where a previous layer has been torn off, expect attention to deck fastening and to any sheathing replaced along the eaves.

Record types, document sets, and fee structures are set by local ordinance and change without notice. Confirm the current catalog against the official portal before you file.

Fulton County permit cost

Fulton County prices building permits from construction cost, and the application asks for it directly — for renovations and interior finish permits the applicant states the cost of construction and attaches proof of estimate. That is a document requirement rather than a formality, and a permit application with a bare number and no supporting estimate is incomplete.

Trade permits are handled on their own forms, split between Pay and No Pay, and the electrical form carries a line for the electric service provider. Land disturbance is priced and reviewed on its own track. If your project is inside one of Fulton's fifteen cities, none of this applies — that city's schedule governs, and the schedules differ substantially across the county.

Budget for the notarisation too. Owner-builders and electrical contractors both hit notarised signatures in Fulton, and because copies are not accepted, the original has to physically reach the county.

How Fulton County fees are structured
Fee componentHow it works
Building permitBased on construction cost stated on the application
Proof of estimateRequired to be attached for renovations and interior finish
Trade permitsFiled on separate Pay and No Pay forms
Land disturbanceReviewed and priced on its own track
NotarisationRequired on owner-builder and temporary power affidavits
City projectsPriced by the city, not the county — fifteen separate schedules
🧮

Want a precise number for a specific Fulton County project? Send us the scope and we will price the permit path before you file.

Fulton County trade permits

Fulton's trade paperwork is more prescriptive than most Georgia counties, and the details changed in ways that still catch people working from old form sets. All trade forms now include space for property ownership information, and the electrical Pay and No Pay form carries an added line for the electric service provider.

Pay and No Pay

Trade permits are split into two form types. Filing the wrong one against the wrong scope is an intake rejection rather than a review comment.

Temporary power is notarised

Both the Temporary Power Pole affidavit and the Temp to Perm affidavit require an original notarised signature from the electrical contractor — not the general contractor, and not a copy.

Ownership on every trade form

Property ownership information appears on the trade forms themselves, so the trade cannot file blind against an address it has not confirmed.

State licence still governs

County forms are county records. The Chapter 14 trade licence is what authorises the work, and it is required regardless of the value of the job.

🧢 Georgia's contractor licensing threshold is $2,500, which is far lower than most states and catches work people assume is too small to regulate. Under O.C.G.A. § 43-41-2 a state licence is required once the value of the work — or the contractor's compensation, whichever is higher — exceeds that figure, and the test is per project, not per invoice. The State Licensing Board for Residential and General Contractors sits under the Secretary of State and issues four tiers: Residential-Basic (detached one- and two-family homes and townhouses up to three stories); Residential-Light Commercial (adding multifamily and light commercial under four stories and under 25,000 square feet); General Contractor (all building types, no dollar cap); and General Contractor Limited Tier (the same scope capped at $1,000,000 per contract). The consequence of getting this wrong is not just a fine. Under O.C.G.A. § 43-41-17 a contract for work requiring a licence, entered into with a contractor who does not hold one, is unenforceable in law or in equity by that contractor — who also cannot file a mechanic's lien and cannot make a bond claim. An unlicensed contractor on a Georgia job has no collection mechanism at all. The trades are licensed separately under O.C.G.A. Title 43, Chapter 14 through the divisions of the Construction Industry Licensing Board, and those licences are required regardless of project value — the $2,500 floor does not apply to them. Electrical runs Class I (restricted to low-voltage and single-phase installations not exceeding 200 amperes) and Class II (unrestricted). Conditioned air runs Class I (not exceeding 175,000 BTU heating and 60,000 BTU cooling) and Class II (unrestricted). Plumbing runs Journeyman, Master Class I (one- and two-family dwellings and commercial structures not exceeding 10,000 square feet), and Master Class II (unrestricted). Senate Bill 553, enacted as Act 472, repealed and reenacted the whole of Chapter 14 effective July 1, 2026. A year of full-time experience now means 2,000 documented hours, applicants submit sworn affidavits and consent to fingerprint background checks they pay for, and lending, leasing, renting, or assigning a licence to an unlicensed person — or conspiring to evade the chapter — is now expressly a disciplinary offence. Licences renew biennially with a 31-day late window.

Fulton County permit application: how to apply step by step

Here is how to get a building permit in Fulton County, from confirming the requirement through to close-out. Each step below corresponds to a real decision point where projects commonly stall.

1. Establish which authority permits the address

This is the whole job in Fulton. Fifteen cities permit their own construction, the City of South Fulton has permitted most of south Fulton since July 2017, and the county's own footprint is the Fulton Industrial Business District. Confirm from the parcel, not the mailing address, before you draw or price anything.

2. Pull the current form set

Fulton updated its permit application forms and they are not interchangeable with older ones. The current Building Permit Application runs four pages, with the Appendix I agreement on page 3 and a Site Plan Checklist on page 4. For a new home, work the New Residential Checklist — it is a one-page list of everything that makes the application complete.

3. Assemble originals, not scans

Photocopied signatures are not accepted on any permit application form, and required notarised stamps must be original. Build the signing and notarising into the schedule; this is the step that most often sends a Fulton application back before review even starts.

4. State construction cost and attach the estimate

For renovation and interior finish permits the application asks for the cost of construction with proof of estimate attached. Provide the supporting document at submission rather than waiting to be asked for it.

5. File the trade permits on the right forms

Trade permits split into Pay and No Pay forms, all now carrying property ownership information, with the electrical form also asking for the electric service provider. Temporary electrical service needs either a Temporary Power Pole affidavit or a Temp to Perm affidavit, each with an original notarised signature from the electrical contractor.

6. Track the permit and hold the paperwork

During an active building permit the permit holder carries responsibility for the permitted work. Keep the permit and approved plans on site, and if the owner is acting as their own general contractor, note that the application requires a notarised signature accepting sole responsibility for quality and code compliance.

Inspections in Fulton County

Inspections in the county's permitting jurisdiction are run through Public Works, and the county publishes a Residential Building Inspection Process document describing the sequence for a new home. Inside the cities, inspection scheduling differs by city — some run text-message scheduling, some portal-only, some by phone — so a contractor working several Fulton addresses is working several systems at once.

The application language is explicit about who may work under an owner-issued permit: where the permit is issued to the owner or an owner's agent, no one other than the owner or licensed subcontractors can perform work under that permit. That is a scope limit on the permit itself, not general advice.

For private-provider inspections, also from July 1, 2026, the local governing authority keeps two business days to identify deficiencies in an approved inspection report, and any deficiency notice must describe the problem and name the regulatory requirement that has not been met. If no timely written notice arrives, the inspection is deemed approved as a matter of law. Correcting a deficient report afterwards cannot undo or delay work the private professional provider already approved (O.C.G.A. § 8-2-26(g)(14)).

Keep the permit and approved plans on site throughout. a Georgia building permit generally becomes invalid if work does not begin within 180 days of issuance, or if work is suspended or abandoned for 180 days after commencing, under the administrative provisions of the adopted International Building and Residential Codes — local ordinance may set a different period, and extensions are usually available in writing on request.

Fulton County permit search and official resources

Fulton publishes its permit forms, checklists, and process documents through Public Works, and maintains an open data portal where permit datasets are searchable — useful for confirming whether a permit exists on a parcel before you rely on it.

Frequently asked questions

Who issues building permits in Fulton County, GA?

For most addresses, a city does. Fulton County's own permitting is provided by the Department of Public Works, Permits and Plan Review, and covers the Fulton Industrial Business District. The county's fifteen cities permit construction inside their own limits.

What happened to Fulton County's planning department?

It was dissolved. As of July 3, 2017 the Department of Planning and Community Services ceased to exist as a standalone department. Planning, zoning, permitting, building inspections, and land development for all of south Fulton except the Fulton Industrial Business District became the responsibility of the new City of South Fulton, and the remaining functions moved to Public Works.

Which cities permit their own work in Fulton County?

Atlanta, Sandy Springs, Roswell, Johns Creek, Alpharetta, Milton, Mountain Park, Chattahoochee Hills, College Park, East Point, Hapeville, Fairburn, Palmetto, Union City, and South Fulton. Confirm from the parcel rather than the mailing address.

Does Fulton County accept scanned permit applications?

Not with copied signatures. The county does not accept photocopies of signatures on any permit application form, and any required notarised stamps must also be original. This has been the rule since 2017 and it is the most common reason a Fulton application is rejected at intake.

What is Appendix I on the Fulton County application?

An agreement that used to be a separate form and is now page 3 of the Building Permit Application. Page 4 of the same application is a Site Plan Checklist. If you are filing a standalone Appendix I, you are working from a superseded form set.

What is the difference between Pay and No Pay trade permits?

Fulton splits its trade permit forms into two types depending on whether the trade record carries a fee. All trade forms now include space for property ownership information, and the electrical forms carry an added line identifying the electric service provider.

What is a T-Pole affidavit?

A Temporary Power Pole affidavit, used for temporary electrical service to a site. Fulton also uses a Temp to Perm affidavit for a temporary power connection to permanent service. Both require an original notarised signature from the electrical contractor.

Does Fulton County issue business licences?

Only for businesses located in the Fulton Industrial District. Every other business licence in the county is issued by the relevant city. Environmental health inspections, including restaurants, public pools, and hotels, run through the Fulton County Board of Health rather than the permitting office.

Can an owner act as their own general contractor in Fulton County?

Yes, with a notarised signature accepting that they alone are responsible for the quality of the work and compliance with applicable codes. Where a permit is issued to an owner or owner's agent, no one other than the owner or licensed subcontractors may perform work under it.

What code does Fulton County enforce?

The Georgia State Minimum Standard Codes — the 2024 International Building and Residential Codes with Georgia Amendments and the 2023 National Electrical Code with the 2026 Georgia Amendments, effective January 1, 2026. The energy code remains the 2015 IECC with Georgia supplements.

When is a Georgia contractor licence required?

Once the value of the work, or the contractor's compensation, exceeds two thousand five hundred dollars, tested per project rather than per invoice. An unlicensed contractor's contract for licensable work is unenforceable by that contractor, who also cannot file a lien or make a bond claim.

How do I check whether a Fulton County permit exists on a property?

The county maintains an open data portal carrying permit datasets, searchable by tag. If the address turns out to sit inside a city, that city's own permit search is the authoritative record rather than the county's.

Simplify Fulton County permitting with Alliance Permitting

Fulton is the hardest jurisdiction question in Georgia and one of the easiest permits to get wrong, because the answer changed in 2017 and the addresses did not. Fifteen cities, a dissolved county department, a surviving industrial-district footprint, and an intake desk that rejects copied signatures. A permit expediter for Fulton County is mostly buying you the right authority on the first attempt.

250K+Permits approved
All 50States covered
21 YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 21 years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Fulton County because the work is done by people who have stood at the counter:

  • Right authority — county, one of fifteen cities, or the City of South Fulton, resolved from the parcel before anything is drawn.
  • Current forms, original signatures — the four-page application with Appendix I and the Site Plan Checklist, notarised where required and delivered as originals.
  • Complete oversight — every Fulton-area permit tracked across your jobs in one place, whichever of the sixteen authorities issued it.

Alliance Permitting is a permit documentation and expediting service. We are not a law firm and do not provide legal advice, and we are not the permitting authority.

Ready to break ground in Fulton County sooner?

Let Alliance prepare, file, and track your Fulton County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Fulton County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.

Expedite Your Permits Today!

Free Quote1-855-478-4290