Dodge County issues building permits through the County and publishes a current permit fee schedule, while septic approval is required before permit issuance for structures using on-site sewage disposal.

Authority: Dodge County Building InspectorCode: Georgia State Minimum Standard Codes (2024)Phone: Building Inspector 478-374-8127 · cell 478-285-3658
Authority
Dodge County Building InspectorAll of the county outside Eastman city limits
New home fee
$0.20 per sq ft$200 minimum, $500 maximum (2026 fee sheet)
Septic first
Health Department permitRequired before the building permit when a septic system is needed
Inside Eastman
City of EastmanThe City inspects buildings inside its limits

Outside the City of Eastman, building permits in Dodge County are issued by the County, and the County Building Inspector checks the plans and the work. A new house, addition or outbuilding costs $0.20 per square foot, with a $200 minimum and a $500 maximum, and any building that needs a septic system must have its Health Department permit before the County issues the building permit.

What requires a building permit in Dodge County?

The County code says no one may begin a building project on land in the county without first getting a permit from the county commissioners’ office. The County’s fee list, effective January 1, 2026, shows the kinds of work it permits:

Buildings

  • New homes, additions and outbuildings
  • House remodels and single-room remodels
  • Shops and pole barns
  • Poultry houses
  • Swimming pools
  • Mobile homes and tiny homes

Power and equipment

  • Service poles, irrigation and well services
  • Service change-outs, meters and panels
  • Generators
  • Center pivots
  • Residential and commercial solar panels
  • Cell towers and additions to towers

Cell tower permits need a set of plans. Within 3 miles of the Heart of Georgia Regional Airport, anyone building or altering a structure must file FAA form 7460-1 before asking the Building Inspector for a permit; between 3 and 5 miles the FAA filing is needed only for structures over 200 feet tall.

Short on time to read all of this?

Get a free quote →

Who issues building permits in Dodge County?

The County Building Inspector, Rob Stanley, handles building permits and inspections. The County’s service delivery strategy splits building inspection between two providers: the City of Eastman inside its own limits, and Dodge County everywhere else, including Chauncey, Chester, Milan and Rhine. The same strategy lists planning and zoning as a City of Eastman service only, with no County zoning in unincorporated areas.

Dodge County permit contacts
ItemDetail
Building InspectorRob Stanley, 478-374-8127 (office), 478-285-3658 (cell)
Inspector’s office5016 Courthouse Circle, Eastman, GA 31023
Board of Commissioners643 Pearl Bates Avenue, Eastman, GA 31023; 478-374-4361, fax 478-374-8121
Septic permitsDodge County Health Department
Inside EastmanCity of Eastman, 478-374-7721

Dodge County building permit fees

Most County permits are flat fees. New homes, additions and outbuildings are charged by floor area. These are the rates on the fee sheet effective January 1, 2026:

Not sure this scope needs a permit?

Get a free quote →
Dodge County building permit fees (from January 1, 2026)
ProjectFee
New home, addition or outbuilding$0.20 per sq ft ($200 minimum, $500 maximum)
Remodel of a house$200
Swimming pool or single-room remodel$75
All shops$200
Pole barn$200
Poultry house$350
Single-wide mobile home$150
Double- or triple-wide mobile home$200
Tiny home$200
Service pole, irrigation or well$65
Service change-out, meter or panel$50
Generator$125
Center pivot$125
Solar panels, residential / commercial$250 / $500
Cell tower$3,000
Addition to a cell tower$250 ($500 maximum)

For example, a 1,800 sq ft house is $360, and any house over 2,500 sq ft reaches the $500 cap.

Electrical, plumbing and HVAC work in Dodge County

The County’s fee sheet has no separate electrical, plumbing or HVAC permit rates. The electrical items it does price on their own are service poles, irrigation and well services ($65), service change-outs, meters and panels ($50) and generators ($125). Every contractor on a permitted job must file a copy of their state licence with the County before the permit is issued.

Rather talk it over?

Call 1-855-478-4290 →

How to get a Dodge County building permit

1. Check who covers the address

Property inside Eastman city limits goes to the City of Eastman. The rest of the county, including the smaller cities, goes to the County Building Inspector.

2. Clear the airport rule

Within 3 miles of the Heart of Georgia Regional Airport, file FAA form 7460-1 first and bring a copy of the filing and the FAA response with the permit request.

3. Get the septic permit

If the building needs a sewage disposal system, get the permit from the Dodge County Health Department before the building permit.

4. Write up the application

The written application must name the contractor and owner with their addresses, state the purpose of the work and include drawings or plans detailed enough for the inspector to check them against the state codes.

5. File licences and pay

Contractors file a copy of their state licence, and the fee is paid from the County fee sheet. The County issues or denies the permit in writing; a denial lists the changes needed.

6. Post the permit and build

Display the permit in a conspicuous place on the site while the work goes on.

Inspections and violations

The Building Inspector checks the work against the state minimum codes during construction and before the building is occupied. If he finds a violation, he issues a deficiency notice that gives a reasonable time to fix it.

Rather not deal with the Dodge County building department?

Get a free quote →

If the work is still not brought up to code, the inspector can issue an immediate stop-work order or cite the contractor or owner to the Dodge County Magistrate Court, where a hearing is set within 30 days. A contractor with an unresolved code violation cannot apply for or receive a new building permit until it is fixed.

Local Dodge County rules worth knowing

No County zoning: the County’s service delivery strategy lists planning and zoning only for the City of Eastman, so unincorporated land has no general County zoning review before a building permit, although the County’s 2026 data-center ordinance requires a special use permit for that use.

Airport area: the FAA filing rule around the Heart of Georgia Regional Airport was added to the County code on February 3, 2025.

Data centers: the County’s data center regulation requires a special use permit with a $10,000 base application fee, a County business license, one advertised community meeting held between 5 p.m. and 8 p.m., buildings at least 200 feet from property lines and public roads, and a construction traffic management plan approved before the building permit is issued.

Georgia building code

Georgia's State Minimum Standard Codes apply statewide: the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, and Swimming Pool and Spa Codes and the 2023 National Electrical Code, with Georgia Amendments, in force since 1 January 2026; the energy code is still the 2015 IECC with Georgia supplements. The Georgia State Minimum Standard Codes

Dodge County permit search and official resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Want this handled start to finish?

Get a free quote →

Dodge County permit FAQs

Who issues building permits in Dodge County?

The County, through its Building Inspector, for all property outside Eastman city limits, including Chauncey, Chester, Milan and Rhine. Inside Eastman, the City handles building inspection.

How much is a building permit for a new house in Dodge County?

$0.20 per square foot, with a $200 minimum and a $500 maximum. A 1,800 sq ft house is $360.

Inspections are where schedules slip.

Get a free quote →

Do I need a septic permit first?

Yes, if the building needs a sewage disposal system. The Dodge County Health Department permit has to be issued before the County issues the building permit.

What does a mobile home permit cost?

$150 for a single-wide and $200 for a double- or triple-wide. A tiny home is also $200.

Does Dodge County have zoning?

Not in unincorporated areas. The County’s service delivery strategy lists planning and zoning only for the City of Eastman.

How do I reach the Building Inspector?

Rob Stanley can be reached at 478-374-8127 (office) or 478-285-3658 (cell). The office is at 5016 Courthouse Circle, Eastman.

Simplify Dodge County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Georgia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Dodge County sooner?

Let Alliance prepare, file, and track your Dodge County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Dodge County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.