To get a building permit in Covington, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

How to get a building permit from the City of Covington: who issues it, which forms to use, what plan review costs and how to book inspections.

Authority: City of Covington Planning & Development DepartmentCode: Georgia State Minimum Standard Codes (2024)Phone: 770-385-2020
Authority
City of Covington Planning & Development DepartmentLocal permitting authority
Apply
City application formsPlanning & Development, 2194 Emory St NW
Inspection cut-off
3:00 p.m.Call or email for next day

Inside Covington city limits, building, trade and fire permits are handled by the City’s Planning & Development Department at 2194 Emory Street NW, using paper and PDF applications from the City’s Building Forms page. Plan review costs $75 for a residential project and $250 for a commercial one, and inspections requested by phone or email before 3 p.m. are done the next day.

What requires a permit in Covington?

Planning & Development reviews and issues permits for building, fence, sign, electrical, plumbing, HVAC and other regulated construction inside City limits. The City’s forms cover:

Building

  • New construction, including shell-only buildings
  • Interior build-outs and remodels, exterior remodels and basement finishes
  • In-ground pools
  • Accessory structures: sheds, decks, canopies, retaining walls and waste enclosures
  • Demolition and construction trailers
  • Fences and signs
  • Telecommunications support structures

Trades, fire and other

  • Electrical, plumbing, mechanical, gas and low-voltage work (Trade Permit)
  • Fire alarm and fire sprinkler systems
  • Temporary power poles
  • Vacant property permits

If the property is in one of Covington’s historic districts, the Certificate of Appropriateness must be obtained before the building, accessory structure or fence application is completed, and proof of it goes in with the application.

Covington building department: who handles permitting

The Department of Planning and Development reviews, permits, licenses and inspects construction inside the city, schedules all building and fire inspections, and also administers historic preservation. Fire permits are filed with Planning & Development but reviewed separately; the Fire Department answers questions on them.

Short on time to read all of this?

Get a free quote →
Covington permitting contact
DetailInformation
Office2194 Emory Street NW, Covington, GA 30014
Mailing addressP.O. Box 1527, Covington, GA 30015
Phone770-385-2020
FilingCity application forms, filed with Planning & Development
Inspections770-385-2046 or 770-385-2021
Fire permits questionsFire Department, 770-385-2100

Covington permit types and filing

Covington’s Building Forms page has separate applications for building permits, residential and commercial accessory structures, demolition, fences, fire alarm or fire sprinkler work, pools, signs, construction trailers, telecommunications support structures, vacant property and trade permits, plus a Subcontractor Affidavit. Incomplete applications are returned.

The building application asks for the parcel and zoning district, project type, cost excluding land, total square footage, intended use, height and levels, whether a temporary power pole or sprinklers are needed, the construction type, and the general contractor’s qualifying agent and state licence type. It also lists each electrical, plumbing, mechanical and low-voltage subcontractor with their state card number, and includes two notarised statements: the general contractor’s certification that every subcontractor is licensed, and the property owner’s affidavit authorising the applicant.

Permit costs and fees in Covington

The City’s current application forms print these fees; permit fees beyond plan review are calculated when the permit is issued.

Covington published permit fees (2025–2026 forms)
ProjectFee
Residential plan review$75
Commercial plan review$250
Residential accessory structure plan review$75 (permit, electrical and plumbing fees extra)
Fence permit$50

Not sure this scope needs a permit?

Get a free quote →

An application is not sent for review until the plan review fee is paid. New homes and other development that adds units also pay development impact fees under Chapter 15.52 of the City Code; these can be paid at any time while the permit is active but must be paid by the final building inspection, before the Certificate of Occupancy. Remodels, replacement homes, additions that add no units and accessory uses such as decks, patios and pools are not charged impact fees. The City’s Engineering fee schedule separately prices land-disturbance plan review, re-submittals and inspections.

Electrical, plumbing, mechanical and gas work

Covington lists electrical, plumbing and HVAC permits among those issued by Planning & Development. Every state-licensed subcontractor files the Trade Permit form with copies of their state licence, driver’s licence and business licence, and a signed subcontractor affidavit must be on file before any inspection is performed.

The City’s inspection list sets the trade stages: plumbing, mechanical and gas underground, rough-in and final; a gas pressure test at rough-in and a gas release inspection; and electrical temporary pole, underground, slab rough-in, rough-in (with the exterior disconnect), permanent power and final. The temporary pole must pass before the utility will connect temporary power. Fire alarm and sprinkler work has its own application and fire underground, rough and final inspections.

Application documents and plan review

Building permit

  • 1 full set of stamped plans on 24” x 36” paper, including the site layout, tree preservation plan, and backflow device and grease trap where they apply
  • 1 set of plans in PDF
  • 2 separate sets of electrical plans and 1 set of gas plans for non-residential work
  • Plan review fee
  • Signed affidavit and copies of the contractor’s state licence, business licence and driver’s licence
  • Signed subcontractor affidavit for each subcontractor
  • Newton County Health Department documentation for septic sites

Accessory structure or fence

  • 1 paper and 1 digital plan set with a site plan
  • Construction plans for stick-built structures, or the brochure or elevations for prefabricated ones
  • Square footage of the structure and the house, height and any electrical service
  • Historic district approval letter, where applicable
  • For fences: material, style, height, gates and a site plan

Rather talk it over?

Call 1-855-478-4290 →

No permit is issued until the property owner affidavit is signed. Before a Certificate of Occupancy is issued for non-residential work, the applicant gives the Fire Marshal and the building inspector the final approved plans in PDF.

How to apply: 6-step Covington process

1. Confirm the site

Check the parcel is inside Covington city limits and whether it is in a historic district.

2. Get historic approval first

Obtain the Certificate of Appropriateness before completing the permit application.

3. Complete the right form

Use the building, accessory structure, fence, pool, demolition or trade application from the Building Forms page.

4. Submit and pay plan review

File with Planning & Development with the plan sets and licence copies; review starts once the fee is paid.

5. File affidavits

Have the owner affidavit signed and each subcontractor’s affidavit on file before inspections.

6. Inspect and close out

Call or email before 3 p.m. for next-day inspections, pay any impact fees, and pass the final for the Certificate of Occupancy.

Covington inspections

All building and fire inspections are scheduled with the Planning & Development Department. For a next-day inspection, call or email before 3 p.m. with the project address, an on-site contact name and number, and the inspection type. The inspection contacts are 770-385-2046 and 770-385-2021.

Rather not deal with the building department?

Get a free quote →

Keep the permit and inspection placard and a field-stamped copy of the plans posted on site. Minimum building inspections are:

  • Footing or slab, before concrete is placed
  • Framing, after all plumbing, electrical and mechanical rough-ins are in
  • Exterior sheathing nail pattern, before house wrap
  • House wrap, before siding
  • Basement wall damp-proofing, before backfill
  • Insulation, before drywall
  • Final, once all building, mechanical, plumbing, gas and electrical work is installed, connected and tested

Local Covington details that matter

Site requirements: the permit holder must keep a portable toilet and enough trash bins on site for the whole job.

Historic districts: Planning & Development administers historic preservation, and work in a historic district needs a Certificate of Appropriateness before the permit application is completed.

Impact fees: development that adds units pays City impact fees, due by the final inspection.

Septic sites: homes on septic need Newton County Health Department documentation with the application.

Georgia building code

Georgia's State Minimum Standard Codes apply statewide: the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, and Swimming Pool and Spa Codes and the 2023 National Electrical Code, with Georgia Amendments, in force since 1 January 2026; the energy code is still the 2015 IECC with Georgia supplements. The Georgia State Minimum Standard Codes

Covington permit search and official resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Want this handled start to finish?

Get a free quote →

Covington permit FAQs

Who issues building permits in Covington?

The City of Covington Planning & Development Department reviews, permits, licenses and inspects construction within City limits.

How much is plan review in Covington?

$75 for residential projects and $250 for commercial projects, paid before the application goes to review.

Do I need a permit for a fence or shed?

Yes. Fences need a $50 permit, and sheds, decks and other accessory structures use the accessory structure application with a $75 plan review fee.

Inspections are where schedules slip.

Get a free quote →

Does Covington issue trade permits?

Yes. Each state-licensed subcontractor files the Trade Permit form with licence copies, and no inspection happens until their affidavit is on file.

How do I schedule an inspection?

Call 770-385-2046 or 770-385-2021, or email, before 3 p.m. for a next-day inspection.

Can a Covington project need historic review?

Yes. If the property is in a historic district, the building permit application must include proof of a Certificate of Appropriateness.

Simplify Covington permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Georgia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Covington sooner?

Let Alliance prepare, file, and track your Covington permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Covington permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.