Inside the Town of Braselton, building and trade permits are issued by the Town’s Planning and Development Department at 4986 Hwy 53, whichever of Jackson, Barrow, Gwinnett or Hall County the lot is in. Applications are emailed or filed at the office, a new single-family home costs $0.15 per heated square foot with a $650 minimum, and inspection requests must be emailed before 3 p.m. the day before.
What requires a permit in Braselton?
The Town’s general building permit application covers new structures, alterations and interior finishes, additions, house moving, demolition, fences, storage buildings, garages, greenhouses, shop buildings, open sheds and manufactured houses. Electrical, plumbing, mechanical and fuel gas work each need a trade permit, and pools have their own application. Work that requires a permit must not begin until the permit is issued.
Permit needed
- New homes, duplexes, triplexes and apartments
- Commercial buildings, additions and interior finishes
- Residential additions and alterations, including basement finishes
- Storage buildings, garages, greenhouses, shops and pole barns
- Fences (filed by email to the Planning and Development Director)
- Retaining walls over 4 feet, or shorter walls with a backfill slope steeper than 1 in 3 or a surcharge load
- Swimming pools, mobile homes, house moving and demolition
- Electrical, plumbing, mechanical and fuel gas work
Exempt
- Retaining walls under 4 feet that do not have steep backfill or a surcharge load
- Fences built for agricultural purposes
Retaining wall permits are approved by the Public Works Director rather than the building office.
Braselton building department: who handles permitting
The Planning and Development Department issues building and trade permits and runs building inspections inside the town limits. Kevin Keller is the Planning and Development Director, and fence applications go to him directly. The Public Works Inspector checks sidewalks, driveway connections, sewer laterals and meter boxes, and the Town’s Environmental Specialist inspects erosion and sediment control on building lots.
| Detail | Information |
|---|---|
| Office | Planning and Development Department, 4986 Hwy 53, Braselton, GA 30517 (mail: P.O. Box 306) |
| Hours | Monday–Friday, 8:30 a.m.–4:30 p.m. |
| Phone | 706-654-3915 |
| Director | Kevin Keller, kdkeller@braselton.gov |
| Inspections | inspections@braselton.gov (email only) |
| Public Works Inspector | 706-654-3915 ext. 1025 |
| Environmental Specialist | 706-654-3915 ext. 1012 |
Short on time to read all of this?
Get a free quote →Braselton is its own permitting jurisdiction. Hall County’s official jurisdiction page lists Braselton as a municipality with its own inspection department. Note that the Town’s permit application lists the address as 4982 Highway 53.
Braselton permit applications and forms
Applications and supporting documents are emailed to the Planning and Development Department (kdkeller@braselton.net or gmcdonald@braselton.net on the residential checklist) or filed at the office. The forms are:
- General Building Permit Application: asks for the county, the type of improvement, the use, heated and unheated square footage, stories, bedrooms and bathrooms, and, for new Chateau Elan homes on sewer lots, the linear road frontage.
- Trade Permit Application: one form for all trades on a combination job. Single-trade jobs use the separate electrical, mechanical or plumbing application.
- Subcontractor Certification Form: signed by the licence holder for each trade; copied or faxed signatures are accepted, but trade permits are not processed without it.
- Swimming Pool Permit Application, which lists the pool inspections.
- Erosion Control Compliance Certification.
- Authorized Agent Form: needed when anyone other than the general contractor or owner signs.
- Owner Exemption Form: a notarised owner-builder affidavit for owners who live in the home and act as their own general contractor. The owner must supervise the work on site, and selling or leasing within 24 months of completion breaks the exemption.
A permit expires if work does not start within 6 months of issue, or if work stops for 6 months or more.
Permit costs and fees in Braselton
Fees come from the Town’s Review and Permit Fees schedule, posted in April 2026. They must be paid before the permit is issued, and water meters are paid for when the permit is picked up.
| Project | Fee |
|---|---|
| New home, heated area | $0.15 per sq ft |
| New home, unheated area (garage, etc.) | $0.05 per sq ft |
| Minimum fee: single family / duplex / triplex / multi-family | $650 / $800 / $900 / $1,200 |
| Residential addition | $0.15 per heated sq ft ($100 minimum), $0.05 unheated |
| Alteration without addition | $0.05 per heated sq ft, $0.03 unheated |
| Storage building, garage or greenhouse | $0.06 per sq ft without floor ($25 minimum), $0.09 with floor ($75 minimum) |
| Fence | $100 (residential addition minimum) |
| Swimming pool | $150 |
| Commercial new structure or addition | $0.25 per sq ft, $600 minimum |
| Commercial interior finish or alteration | $0.15 per sq ft |
| Commercial plan review | $250 up to 50,000 sq ft, $500 to 100,000, $750 above; $150 for interior finish or addition |
| Mobile home | $0.15 per sq ft, $350 minimum |
| Demolition | $300 |
| Certificate of Occupancy (mobile homes) | $150 |
Not sure this scope needs a permit?
Get a free quote →New homes that file as tertiary NPDES permittees pay a $50 plan processing fee, and Chateau Elan sewer lots pay a re-use line fee of $7 per linear foot of street frontage.
Starting work before the required permit is issued carries a penalty of 100% of the usual permit fee, on top of the permit fees.
Electrical, plumbing, mechanical and gas work
For a new building the trade permit application must be filed with the building permit application, and no electrical, plumbing, mechanical or fuel gas work may start without its trade permit. Each trade needs a Subcontractor Certification Form signed by that trade’s licence holder.
| Permit | Fee |
|---|---|
| Electrical, up to 200 A service | $50 |
| Electrical, 300 A / 400 A | $60 / $75 |
| Plumbing (includes basement stub) | $8 plus $3 per fixture, $50 minimum |
| Heating and air, all electric | $50 for the first 2 tons plus $2 per additional ton |
| Heating, gas | $50 for the first 50,000 BTU plus $2 per additional 25,000 BTU |
| Fuel gas | $3 per fixture, $50 minimum |
Commercial electrical permits run from $50 to $95 for single-phase services up to 600 A and from $50 to $230 for three-phase services up to 2,000 A, with $10 per additional 100 A and $20 per panel over 4 panels. Commercial roof and floor drains are $1 each.
Rather talk it over?
Call 1-855-478-4290 →Alliance handles electrical permits for contractors here. More on this: who pulls the electrical permit.
Application documents and plan review
A permit is not issued until every required document is in. Every property must have a 911 address before a permit is applied for.
New home
- House Location Plan: a lot survey with setbacks, watercourses, wetlands, floodplain, stream buffers, easements, zoning and proposed improvements
- Complete building permit application
- Copy of the secondary permittee Notice of Intent, or a tertiary NOI and lot erosion control plan where the subdivision has no primary permittee
- Minimum square footage compliance where zoning sets one
- Energy code compliance, for example a REScheck report
- Architectural approval from the developer or HOA in a PUD
- Trade Permit Application and Subcontractor Certification Forms
- Erosion Control Compliance Certification
- Health department approval on septic lots
- Water & Sewer Service Application
- General contractor’s state licence card, or the Owner Exemption affidavit
Commercial
- Architectural plans
- Complete application with the general contractor’s licence number
- Qualifying agent’s signature or an Authorized Agent Form
- Trade Permit Application with Subcontractor Certification Forms
- County Fire Marshal approval (West Jackson Fire Department for Jackson County sites)
- Health department approval for food businesses or septic sites
- Verification and payment of sewer capacity (sewer taps) for new buildings
- Water & Sewer Service Application
- NPDES Notice of Intent, except for interior finishes
Interior alterations such as basement finishes skip the location plan, NOI, square footage, PUD approval and water and sewer items. Single-family homes do not get a building plan review unless zoning conditions require one; commercial, industrial and multi-family projects are plan-reviewed.
Rather not deal with the building department?
Get a free quote →How to apply: 6-step Braselton process
Use the Town limit and zoning map, and note which of the four counties the lot is in for the application and fire marshal approval.
Collect PUD architectural approval, the NPDES Notice of Intent, health department sign-off on septic lots and, for commercial work, the county fire marshal’s approval.
Complete the General Building Permit Application, the Trade Permit Application and each Subcontractor Certification Form.
Send everything to the Planning and Development Department; incomplete packages are not processed.
Pay the permit fees, plus water meter and sewer capacity charges where they apply, when you collect the permit.
Request building inspections by email and contact the Public Works Inspector and Environmental Specialist directly for their inspections.
Braselton inspections
Building inspections can be scheduled only by email to inspections@braselton.gov, giving the permit number, inspection type, site address and a contact number. Requests received before 3 p.m. are inspected the next day; later requests go on the list for the day after next, and each day’s list closes at 3 p.m. Inspections include footings, slab, framing, insulation, electrical, plumbing, mechanical, fuel gas, rough-ins, finals and pools.
Builders must also book the Public Works Inspector (706-654-3915 ext. 1025) when sidewalk and driveway forms are set, before concrete is poured, and for sewer laterals and meter boxes. The Environmental Specialist (ext. 1012) inspects erosion control on lots. No Certificate of Occupancy is released until the Public Works Inspector and the Environmental Specialist have also passed their final inspections.
Keep the permit card posted on site until the Certificate of Occupancy or completion is issued, and do not cover work before it has been inspected.
Local Braselton details that matter
Planned unit developments: new homes and additions in Chateau Elan, Mulberry Park, Vineyard Gate, Riverbend @ Mulberry Park, Riverstone Park, Reflections and the Falls of Braselton need architectural approval from the developer or HOA. Setbacks in PUDs come from the approved final plat.
Fences: under the amended Development Code Sec. 6.13, residential fences may be up to 4 feet in front yards and 8 feet in side and back yards, front-yard fences must not be opaque, the finished side faces the neighbour, and fences must sit at least 1 foot back from the public right-of-way and off utility and drainage easements.
Want this handled start to finish?
Get a free quote →Site development: land development review is priced separately, for example $500 for a concept or preliminary plan, and erosion control monitoring is $150 or $40 per disturbed acre, whichever is greater. Rezoning or annexation costs $600 and a variance $400.
Georgia building code
Georgia's State Minimum Standard Codes apply statewide: the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, and Swimming Pool and Spa Codes and the 2023 National Electrical Code, with Georgia Amendments, in force since 1 January 2026; the energy code is still the 2015 IECC with Georgia supplements. The Georgia State Minimum Standard Codes
Braselton permit search and official resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
- Braselton building permit applications and information
- Georgia DCA current State Minimum Codes
- Braselton residential permit requirements
- Hall County: city inspection departments
- Braselton Development Code
- Braselton Review and Permit Fees (2026)
- Braselton commercial permit requirements
- Braselton inspection process (October 2025)
- Braselton fence and wall regulations (Sec. 6.13)
Inspections are where schedules slip.
Get a free quote →Braselton permit FAQs
Does Braselton issue its own building permits?
Yes. The Town’s Planning and Development Department issues building and trade permits inside town limits, whichever county the lot is in.
How much is a building permit for a new house in Braselton?
$0.15 per heated square foot and $0.05 per unheated square foot, with a $650 minimum for a single-family home, plus trade permits.
Do I need a permit for a fence in Braselton?
Yes. Use the general building permit application, check “Fences” and email it to the Planning and Development Director; the fee is $100.
Is there plan review for a new house?
No, unless zoning conditions call for it. Commercial, industrial and multi-family plans are reviewed, starting at $250.
Can a homeowner pull a permit in Braselton?
Yes, if the owner lives in the home, by filing the notarised Owner Exemption affidavit and supervising the work on site.
How do I schedule an inspection?
Email inspections@braselton.gov before 3 p.m. for the next day. Public Works and erosion control inspections are booked directly with those inspectors.
How long is a Braselton permit valid?
6 months: it expires if work has not started within 6 months of issue or stops for 6 months.
Simplify Braselton permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Georgia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Braselton sooner?
Let Alliance prepare, file, and track your Braselton permits while your crew stays on the job.
More Georgia permitting guides
Auburn
Read guide →Buford
Read guide →College Park
Read guide →Brookhaven Building Permit Guide
Read guide →Brooks County Building Permit Guide
Read guide →Brunswick Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Braselton permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.