Skip to main content
Municipal GuideGeorgiaBrunswick · Glynn County

Brunswick, Georgia Building Permit Guide

How to get a building permit from the City of Brunswick: who issues it, which permits can be filed online and what the City inspects.

Authority: City of Brunswick Building Permits & InspectionsCode: Georgia State Minimum Standard Codes (2024)Phone: 912-279-2656
Authority
City of BrunswickBuilding Permits & Inspections
Apply
Online applicationsCity of Brunswick website
Contact
912-279-2656601 Gloucester Street, Brunswick, GA 31520

The City of Brunswick Building Permits & Inspections office reviews plans, issues permits and inspects construction inside the city limits.

What requires a permit in Brunswick?

Building work, electrical, plumbing and mechanical work, roofing, demolition, signs and work in the right-of-way each have their own City permit application.

Who issues permits in Brunswick?

Brunswick permitting contact
DetailInformation
Permit authorityCity of Brunswick Building Permits & Inspections
Contact912-279-2656
Location601 Gloucester Street, Brunswick, GA 31520
FilingCity online permit applications

Short on time to read all of this?

Get a free quote →

Brunswick permit types and filing path

Applications are available online for building, MEP, roofing, demolition, sign and right-of-way permits.

Electrical, plumbing, mechanical and gas work

Electrical, plumbing and mechanical (MEP) work is filed on its own online application, separate from the building permit.

Application documents and plan review

A typical package includes the online application, a scope description, a site plan, construction drawings and contractor information.

Not sure this scope needs a permit?

Get a free quote →

How to apply: 6-step Brunswick process

1. Confirm jurisdiction

Check that the parcel is inside Brunswick city limits.

2. Match the permit types

List every permit the job needs, such as building, trade, demolition or sign permits.

3. Build the document set

Prepare the application, plans and attachments before submitting.

4. Submit online

File through the City’s online permit applications. Staff then email you the fees, payment options and any extra materials needed.

5. Clear review and corrections

Respond to comments in the same permit record and obtain prerequisite approvals before construction proceeds.

6. Pass inspections and close out

Schedule each required inspection, keep work accessible and complete the final approval or occupancy step required for the project.

Rather talk it over?

Call 1-855-478-4290 →

Brunswick inspections

The City inspects structural, accessibility, electrical, plumbing, gas and HVAC work as applicable to the permit. Do not cover work before the required inspection has passed.

Georgia building code

Georgia's State Minimum Standard Codes apply statewide: the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, and Swimming Pool and Spa Codes and the 2023 National Electrical Code, with Georgia Amendments, in force since 1 January 2026; the energy code is still the 2015 IECC with Georgia supplements. The Georgia State Minimum Standard Codes

Rather not deal with the building department?

Get a free quote →

Official Brunswick permitting resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Brunswick permit FAQs

Who handles building permits in Brunswick?

The City of Brunswick Building Permits & Inspections office handles permits and inspections inside the city limits.

Want this handled start to finish?

Get a free quote →

Where should I submit a Brunswick permit?

Use the City’s online permit applications, or contact Building Permits & Inspections at 912-279-2656.

Are trade permits separate?

Yes. Electrical, plumbing and mechanical work has its own online application, separate from the building permit.

Simplify Brunswick permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Inspections are where schedules slip.

Get a free quote →

Alliance Permitting is a permit documentation and submission company in Georgia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Brunswick sooner?

Let Alliance prepare, file, and track your Brunswick permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Brunswick permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.