The Banks County Building Department in Homer requires a permit for all construction, from new homes to sheds of any size, and inspections requested before 4:00 p.m. are made the next day.

Authority: Banks County Planning & DevelopmentCode: Georgia State Minimum Standard Codes (2024)
Authority
Banks County Building Department150 Hudson Ridge, Suite 4, Homer
Apply
Packet to the Planning Office706-677-4272 · cash or check only
Inspections
Call before 4:00 p.m.Next-day inspection; $75 reinspection fee
Cities
Baldwin, Lula, Maysville, Alto, Gillsville, HomerIncorporated places in Banks County

Banks County’s Building Department, part of Planning & Zoning at the County Annex, 150 Hudson Ridge, Suite 4, Homer (706-677-4272), says all construction in Banks County requires permitting, including every shed or barn regardless of size. Residential permit packets are filed with the Planning Office, building permits are valid for 180 days, and the office accepts only cash or check.

What requires a permit in Banks County?

The County states that all construction requires a permit, and its packets spell out where the line falls for smaller jobs:

Permit needed

  • New homes (building, plumbing, electrical and mechanical permits on one application)
  • Additions, and renovations that change the floor plan, replace structural parts or open walls
  • Any shed, barn, workshop or storage building, regardless of size
  • In-ground and above-ground swimming pools
  • New wiring or plumbing behind walls, and HVAC replacement
  • Moving a new or pre-owned manufactured home
  • New commercial buildings, and cell towers or tower changes

No permit needed

  • New cabinets, paint or floor coverings
  • Changing light fixtures or cover plates, or installing ceiling fans
  • Replacing an existing toilet, sink or bathtub
  • Replacing register vents

The County will not permit a remodel, renovation or addition to a mobile home, because mobile homes are built to the federal HUD code and altering one would invalidate its certification.

Who handles permitting in Banks County?

Banks County permit contacts
ItemDetails
Permits and inspectionsBanks County Building Department (Planning & Zoning)
AddressBanks County Annex, 150 Hudson Ridge, Suite 4, Homer, GA 30547
Building office phone706-677-4272
Annex main line706-677-6200
EmailPlanningOffice@co.banks.ga.us
PaymentCash or check only
Septic permitsBanks County Environmental Health, 667 Thompson Street, Homer, 706-677-5009

Short on time to read all of this?

Get a free quote →

The Building Department checks new construction, additions and alterations against the Georgia State Minimum Codes the County has adopted, and the building official issues certificates of occupancy. The County’s Code Enforcement office serves the unincorporated areas. The County lists six incorporated places: the Cities of Baldwin, Lula and Maysville and the Towns of Alto, Gillsville and Homer.

Banks County permit packets

The County publishes a packet for each common job, each with its own checklist and guidelines:

  • New Residential Construction Packet: residential and driveway guidelines, a completeness checklist and the single-family application, which covers the building, electrical, plumbing and HVAC permits.
  • Residential Renovations Packet: permit triggers for remodels, plus the renovation application and a subcontractor page.
  • Residential Accessory or Outbuilding application, with estimated cost and square footage.
  • Swimming Pool Permit Application: every pool must have a fence at least 4 feet high with a locking gate.
  • New Mobile Home Packet and Pre-Owned Mobile Home Packet.
  • Cell Tower Application, sent with construction plans and structural reports to the Planning Office email.
  • Homeowner Permit Affidavit, notarised, for owners doing their own work.

For new commercial buildings, the County provides the applications once it has the plan sets by email.

Permit costs and fees in Banks County

Banks County sets permit fees by Board of Commissioners resolution under Section 18-111 of its code; the building permit fee resolution is not posted online, and the manufactured-home moving permit is priced by the width of the home. The published charges are:

Banks County published permit charges
ProjectFee
Reinspection (failed twice, not ready, or no access)$75
Pre-owned home inspection outside Banks County50 cents per mile travelled outside the county
New cell tower$3,000
Addition to an existing tower$500
Replacement or addition of carrier equipment$500
Section 6409 collocation$250
Work started before the permitPenalty of 100% of the usual permit fee, on top of the permit fee

Not sure this scope needs a permit?

Get a free quote →

An address that is not posted within 30 days of being issued can bring a fine of $25 a day.

Electrical, plumbing and mechanical permits

On a new home, the Residential Building Permit Application covers the electrical, plumbing and mechanical permits, with the contractor for each trade listed on it. On a renovation or addition, each trade change is permitted as part of the job; work on an existing electrical, plumbing or mechanical service alone needs its own stand-alone application.

A homeowner can act as general contractor or do their own electrical, plumbing or mechanical work with a signed, notarised affidavit, committing to live in the home for at least two years; any work the homeowner does not do must be done by a licensed contractor. If you will not live in the home, a licensed contractor is required.

On commercial jobs, fire suppression plans are part of the digital plan submittal.

Application documents

New home

  • Completed application with building, electrical, plumbing and mechanical contractor details
  • Site plan on the plat showing the house, septic tank, well, easements, driveway, other buildings and setbacks
  • Recorded survey or plat
  • Deed or other proof of ownership
  • Floor plan drawn to scale, plus metal-building (PEMB) plans if used
  • Septic approval from Banks County Environmental Health
  • Photo of the driveway entrance marked with flags or stakes
  • Notarised homeowner affidavit, if you are your own contractor

New commercial

  • Erosion and sediment control (ESC) plan
  • Civil site plan
  • Construction plans
  • Fire suppression plans
  • A separate plan for a pre-engineered metal building shell

Rather talk it over?

Call 1-855-478-4290 →

A renovation needs the application, proof of ownership or the owner’s approval, a septic re-evaluation if applicable (Environmental Health is the contact when bedrooms or bathrooms are added), and sketches of the current and new floor plans. A new manufactured home needs the purchase agreement and dealer statement; a pre-owned home must first pass the relocation inspection. House plans may be emailed as a PDF or brought as an 8.5 by 11 inch copy.

How to apply: 6-step Banks County process

1. Perc test and septic permit

Get a soil evaluation (perc test) and apply to Banks County Environmental Health for the septic permit.

2. Prepare the site

Establish and flag the driveway entrance, install a permit (construction) box and put erosion controls such as silt fences in place.

3. Draw the site plan

Get a copy of the plat (a new survey if other homes share the tract) and draw the house, septic tank, well, easements, driveway and existing buildings on it.

4. Submit the packet

File the application, plat, house plan and septic permit with the Planning Office or by email.

5. Address and payment

During review the County requests your 911 address, then contacts you to pay (cash or check) and issues the permits.

6. Build and book inspections

Call before 4:00 p.m. for each next-day inspection; the certificate of occupancy follows the final inspection.

Banks County inspections

Call the office (706-677-4272) before 4:00 p.m. for a next-day inspection; time slots are not guaranteed. A $75 reinspection fee may be charged if you fail the same inspection twice, are not ready, or the inspector cannot get onto the site. Have a portable toilet on site before the first inspection.

Pools need inspections for plumbing pressure and electrical bonding on in-ground pools, and a final covering the pool, fence and locking gate. No new home, mobile home or commercial building may be occupied until the building official issues a certificate of occupancy, which takes about 24 to 48 hours after the final inspection and is never issued the same day. A new business moving into an existing commercial building needs a safety and occupancy inspection before it opens. The building official may exempt bona fide agricultural buildings from inspection, but not from any required zoning inspection.

Rather not deal with the Banks County building department?

Get a free quote →

Local Banks County rules that affect building

Lots and setbacks: only one residence (house or manufactured home) is allowed per parcel. In the ARR zone, lots must be at least 2 acres unless the Planning Office approves otherwise, stick-built homes at least 1,000 sq ft, and buildings at least 70 feet from the centre of the road and 30 feet from side and rear lines. In R-1, homes must be at least 2,000 sq ft with at least 1,500 sq ft on the main floor.

Other site rules: no land disturbance within 25 feet of a natural body of water; no addition, driveway, garage, deck or outbuilding over the septic tank, drain field or replacement area; RV camping is limited to 90 days and RVs get no power pole; accessory buildings cannot be used as homes; a metal building used as a house shell needs approval for residential use and an engineer-stamped plan set; sawmilled lumber needs a grade mark or grading-agency certificate.

Driveways: the pipe must meet GA DOT standard 1030D, at least 20 feet long and 18 inches in diameter with 1 foot of cover, with flared end sections and no headwalls. Driveways are 10 to 25 feet wide, and a construction entrance needs at least 4 inches of stone.

Addresses: the County does not issue addresses for vacant lots; the 911 address is requested during permit review. Post it within 30 days in reflective numbers at least 3 inches high on both sides of the mailbox, or on a roadside sign.

Environmental Health: 667 Thompson Street, Homer, 706-677-5009, open Monday to Thursday 8 a.m. to noon and 1 to 5 p.m., closing at noon on Fridays.

Georgia building code

Georgia's State Minimum Standard Codes apply statewide: the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, and Swimming Pool and Spa Codes and the 2023 National Electrical Code, with Georgia Amendments, in force since 1 January 2026; the energy code is still the 2015 IECC with Georgia supplements. The Georgia State Minimum Standard Codes

Banks County permit search and official resources

Banks County pages and packets used for permits:

Want this handled start to finish?

Get a free quote →

Inspections are where schedules slip.

Get a free quote →

Banks County permit FAQs

Do I need a permit for a shed in Banks County?

Yes. The County requires a permit for any shed, barn, workshop or storage building, regardless of size, and asks you to call the Building Department before placing one.

How do I get started building a new home in Banks County?

Get a perc test and septic permit, set up the driveway and permit box, draw the house on your plat, then submit the application packet to the Planning Office. The County requests your 911 address during review and calls you to pay when the permits are ready.

Can I be my own contractor in Banks County?

Yes, with a notarised homeowner affidavit; you agree to live in the home for at least two years, and any work you do not do yourself must be done by a licensed contractor.

How long is a Banks County building permit valid?

180 days from the date of issue. Notify the Planning Office if you need an extension.

When will my inspection happen?

Call before 4:00 p.m. for an inspection the next day; time slots are not guaranteed, and a $75 reinspection fee can apply.

Do I need a permit to replace my HVAC system or a toilet?

Replacing an HVAC system needs a mechanical permit. Replacing an existing toilet, sink or bathtub does not need a plumbing permit, but new plumbing behind the walls does.

How do I pay for a permit?

The Building, Planning and Zoning office accepts cash or check only.

Simplify Banks County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Georgia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Banks County sooner?

Let Alliance prepare, file, and track your Banks County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Banks County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.