Skip to main content
Municipal GuideFloridaWinter Garden · Orange County

Winter Garden, Florida Building Permit Guide

How to get a building permit from the City of Winter Garden Building Division, which takes contractor applications online through BS&A, with fees and inspections.

Authority: City of Winter Garden Building DivisionCode: Florida Building Code, 8th Edition (2023)Phone: 407-877-5136
Authority
City of Winter Garden Building Division300 W Plant Street, Winter Garden, FL 34787
Apply Online
BS&A Online
Code
FBC, 8th Ed. (2023)Effective Dec. 31, 2023

City of Winter Garden Building Division issues building permits for work inside Winter Garden city limits. Contractors apply online through BS&A; owner-builders can still use the permit counter.

What requires a building permit in Winter Garden?

The city’s fee schedule lists building, electrical, mechanical, plumbing, gas and roofing permit fees. Zoning permits, such as fences, turf, pavers, concrete, driveways, trees and banner signs, must be submitted electronically. Projects over $5,000 ($15,000 for A/C work) need a recorded Notice of Commencement.

For single-family projects under $7,500, the city publishes a permit exemption guide under HB 803; qualifying owners submit a Single Family Dwelling Permit Exemption Request through the BS&A portal.

Short on time to read all of this?

Get a free quote →

Who handles permitting in Winter Garden?

Winter Garden permitting contact
DetailInformation
Local office300 W Plant Street, Winter Garden, FL 34787
Phone407-877-5136
Emailpermits@cwgdn.com
HoursMon., Tue., Wed. & Fri. 8:00 a.m.-5:00 p.m.; Thu. 9:00 a.m.-5:00 p.m.; permit counter closes 4:00 p.m.

Winter Garden permit types

The city fee schedule lists separate electrical, mechanical, plumbing and gas permit fees. All subcontractors must be listed on the application, and each needs a Limited Authorization form.

Permit category
Building
Electrical
Mechanical
Plumbing

Winter Garden building permit cost

Building permit fees are based on construction value: no fee for work of $100 or less unless an inspection is needed (then $30), a $30 minimum from $100.01 to $1,000, and $30 plus $6 for each additional $1,000 above that. State surcharges are added on top.

Not sure this scope needs a permit?

Get a free quote →
📍

For new single-family homes, the city’s schedule sets construction value from the square footage and lists separate building, electrical, mechanical, plumbing and gas permit charges.

Trade permits in Winter Garden

All subcontractors must be listed on the permit application and are permitted with the primary contractor, including electricians on pool and mechanical permits. Each licensed subcontractor must provide a Limited Authorization form.

How to get a building permit in Winter Garden

1. Confirm jurisdiction and scope

Confirm the property is inside Winter Garden and whether the work needs zoning pre-approval.

2. Prepare documents

Follow the city’s list of document requirements for digital submittal, and list every subcontractor on the application.

3. Submit application

Contractors apply online through BS&A; walk-in permit services for contractors ended on January 1, 2026. Owner-builders must sign the application at the Building Department counter, where staff notarize it at no charge.

4. Complete review

Plan-review comments are sent by email; respond with corrected documents.

5. Pay & issue

Pay the permit fees, online for newer permits, then print the permit package and post it on the jobsite before the first inspection.

6. Schedule inspections

Schedule building inspections online or by phone at 407-656-9970. Fire inspections are booked separately at 407-877-5175, ext. 6399.

Rather talk it over?

Call 1-855-478-4290 →

Inspections in Winter Garden

Building inspections are scheduled online through BS&A or through the automated telephone line at 407-656-9970. Fire inspections cannot be scheduled online; call 407-877-5175, ext. 6399, with 24 to 48 hours’ notice for new or renovated buildings. Your inspector’s contact details are shown on the permit record in BS&A.

Rather not deal with the building department?

Get a free quote →

Florida building code

The Florida Building Code, 8th Edition (2023), has applied statewide since 31 December 2023; the Florida Building Commission has proposed the 9th Edition (2026) to take effect on 31 December 2026. Florida permit rules

Frequently asked questions

Who issues building permits in Winter Garden?

The City of Winter Garden Building Division issues building permits for work inside city limits.

How do I apply for a Winter Garden building permit?

Contractors apply online through the city’s BS&A system; walk-in permit services for contractors ended on January 1, 2026. Owner-builders can still use the counter and must sign the application there.

How are permit fees calculated?

By construction value: a $30 minimum for work from $100.01 to $1,000, then $30 plus $6 for each additional $1,000, with state surcharges added.

Want this handled start to finish?

Get a free quote →

Official Winter Garden permitting resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Simplify Winter Garden permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Inspections are where schedules slip.

Get a free quote →

Alliance Permitting is a permit documentation and submission company in Florida. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Winter Garden sooner?

Let Alliance prepare, file, and track your Winter Garden permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Winter Garden permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.