Skip to main content
Municipal GuideFloridaNew Port Richey · Pasco County

New Port Richey, Florida Building Permit Guide

How to get a building permit in New Port Richey, FL: the city Building Division, filing, FY 2026-27 fees, trade permits and inspections.

Authority: City of New Port Richey Building DivisionCode: Florida Building Code, 8th Edition (2023)Phone: 727-853-1047
Authority
City of New Port Richey Building Division5919 Main Street, New Port Richey, FL 34652
Apply
Citizen Access PortalEmail or in person if the portal is down
Inspections
Citizen Access PortalPerformed 8:30 a.m. to 4:00 p.m.
Code
FBC 8th Ed. (2023)Effective December 31, 2023

City of New Port Richey Building Division, within the Development Department, handles construction review, permitting and inspections in the city. The city’s Development Department also coordinates planning, zoning and redevelopment reviews that may intersect with a building permit.

What requires a building permit in New Port Richey?

New Port Richey states that permits are required for most construction activities. Its published list includes interior and exterior renovations and additions, windows and doors, plumbing and electrical work, garage doors, storm shutters, siding, gutters and downspouts, signs, roofs, air-conditioning work, paved driveways, sidewalks and patios, fences, tree removal, sheds, carports, screen rooms, pools and spas, decks, docks, boat lifts, davits and seawall repair.

Not every property with a New Port Richey mailing address is inside city limits, so check the parcel before contacting the Development Department.

  • Building envelope and site work — Renovations, additions, windows/doors, roofing, siding, driveways, patios, fences, sheds, decks and marine improvements are among the city’s listed permit scopes.
  • Trade work — Electrical, plumbing and air-conditioning work are specifically identified as permit-required activities.

Who handles permitting in New Port Richey?

New Port Richey permitting contact
DetailInformation
Office5919 Main Street, New Port Richey, FL 34652
Building permit info727-853-1047
HoursMonday to Friday, 8:00 a.m. to 5:00 p.m.
Emailpermitting@cityofnewportrichey.org

Short on time to read all of this?

Get a free quote →

Building permit applications are submitted through the Citizen Access Portal, which is also used to request inspections and track permits. If the portal is unavailable, applications can be emailed to permitting@cityofnewportrichey.org or delivered to the Development Department at City Hall.

New Port Richey permit types and local requirements

New Port Richey publishes a centralized Development Permits page with the building application and specialized forms. Its permit-required list also spans structural, trade, roofing, exterior, site and marine work.

ScopeCity filing / formLocal note
Building / renovation / additionBuilding Permit ApplicationUse for new construction and regulated building work.
Electrical / plumbing / mechanicalTrade permits under City Building DivisionCurrent fee schedule separately prices these scopes.
RoofingBuilding permitRoof inspection affidavits are published by the city.
Windows / doorsBuilding permitResidential compliance form is published.
Pool / spaBuilding permit with pool safety documentationCity publishes a residential pool safety form.
DrivewayBuilding permit + driveway worksheetWorksheet is listed on Development Permits page.
Tree removalSeparate tree removal applicationCity notes some species do not require a City permit.
SignsSeparate sign applicationsDifferent forms are published for downtown and other districts.

The city also publishes forms for authorized agents, owner-builders, revisions/resubmittals, contractor changes, product approvals, truss verification and substantial damage/improvement reviews.

Not sure this scope needs a permit?

Get a free quote →

New Port Richey permit fees

New Port Richey’s FY 2026-27 Comprehensive Fee Schedule publishes current building and trade permit charges. For residential and commercial new construction, additions or renovations, the building permit fee is based on 1% of construction value with a $200 minimum. The schedule states that value is based on contract price, while the Building Official may determine fees using ICC valuation or another nationally recognized source.

Permit itemFY 2026-27 published fee
Residential re-roof$150 minimum or 1%
Commercial re-roof$250 minimum or 1%
Residential demolition$200 flat
Residential fence$70
Driveway$150
Garage door$100
Residential LP / natural gas$250 minimum or 1%
Residential pool$250 minimum or 1%

The same schedule lists residential electrical work at a $150 minimum or 1%, residential plumbing at a $150 minimum or 1%, and residential mechanical new/repair/alteration/addition work at a $200 minimum or 1%. Commercial minimums are higher for those trades. Zoning review and Special Flood Hazard Area review are each listed at $50 where applicable.

The schedule also includes administrative charges for reinspections, permit extensions, after-the-fact permits, revisions, temporary certificates and other services.

Rather talk it over?

Call 1-855-478-4290 →

New Port Richey building and trade responsibility

The city’s permit-required list includes plumbing, electrical and air-conditioning work, and the FY 2026-27 fee schedule prices electrical, plumbing, mechanical and LP/natural-gas permits separately.

TradeHandled byNote
Building / structuralCity Building DivisionConstruction review, permitting and inspections within city limits.
ElectricalCity permitPermit-required list and separate FY 2026-27 electrical fees.
PlumbingCity permitPermit-required list and separate plumbing fees.
Mechanical / A/CCity permitA/C work listed as permit-required; mechanical fee category published.
GasCity permitFY 2026-27 schedule lists residential and commercial LP/natural-gas permits.
Fire permitsCity Fire Department fee processFY 2026-27 schedule states fire permit fees are assessed by the Fire Department plus a processing fee.

Contractor registration is coordinated through Pasco County’s contractor licensing system. The city states that contractors registered to work in Pasco County are registered to work in New Port Richey for the applicable licensing category.

Rather not deal with the building department?

Get a free quote →

How to apply for a New Port Richey permit

1. Check the property is inside New Port Richey

A New Port Richey mailing address does not always mean the property is inside city limits.

2. Identify the building and trade permits required

Use the city’s permit-required list and Development Permits forms to separate building, roofing, electrical, plumbing, mechanical, gas, pool, sign, tree or other scopes.

3. Prepare the current city application and supporting forms

Complete the Building Permit Application and any authorized-agent, owner-builder, product-approval, driveway, pool, roof, truss, flood or revision documents that apply.

4. Submit the application

Apply through the Citizen Access Portal. If the portal is unavailable, email the application to permitting@cityofnewportrichey.org or deliver it to City Hall.

5. Pay FY 2026-27 permit fees

Building and trade fees are valuation-based or flat depending on scope, plus any zoning, flood, fire or administrative charges.

6. Schedule inspections through Citizen Access

Book inspections in the Citizen Access Portal and pass all required finals.

Inspections in New Port Richey

New Port Richey directs permit holders to the Citizen Access Portal to schedule inspections. The Development Department states that inspections are performed between 8:30 a.m. and 4:00 p.m. and that an exact inspector arrival time cannot be guaranteed.

The FY 2026-27 fee schedule includes escalating reinspection charges: $75 for the first reinspection, $150 for the second reinspection for the same previous note, and $200 for the third reinspection for the same previous note. Permit extensions, after-the-fact permit penalties and temporary certificate charges are also separately listed.

Want this handled start to finish?

Get a free quote →

Florida building code

The Florida Building Code, 8th Edition (2023), has applied statewide since 31 December 2023; the Florida Building Commission has proposed the 9th Edition (2026) to take effect on 31 December 2026. Florida permit rules

New Port Richey permit FAQ

Who issues building permits in New Port Richey?

The City of New Port Richey Building Division handles construction review, permitting and inspections inside city limits.

How are permit applications currently submitted?

Through the Citizen Access Portal. If the portal is unavailable, by email to permitting@cityofnewportrichey.org or in person at City Hall.

How are new construction and renovation fees calculated?

The FY 2026-27 schedule uses 1% of construction value with a $200 minimum for residential and commercial new construction, additions and renovations.

How are inspections scheduled?

The city directs permit holders to Citizen Access for inspection scheduling.

Official New Port Richey permitting resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Inspections are where schedules slip.

Get a free quote →

Simplify New Port Richey permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Florida. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in New Port Richey sooner?

Let Alliance prepare, file, and track your New Port Richey permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about New Port Richey permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.