Skip to main content
Municipal GuideFloridaCasselberry · Seminole County

Casselberry, Florida Building Permit Guide

How building permits work in Casselberry, FL: the City Building Division, online filing, fees, inspections and official resources.

Authority: City of Casselberry Building DivisionCode: Florida Building Code, 8th Edition (2023)Phone: 407-262-7700 opt. 5
Authority
City of Casselberry Building Division95 Triplet Lake Drive, Casselberry, FL 32707
Apply
City online permitting systemApplications, fees, status and inspections
Inspections
Inspections Monday-ThursdayMonday inspections must be booked by 4:00 p.m. Thursday
Code
FBC, 8th Ed. (2023)Effective Dec. 31, 2023

Casselberry states that its Building Division manages construction and alteration of buildings and structures in the city through issuance of building permits.

What requires a building permit in Casselberry?

The Building Division manages the construction or alteration of buildings and other structures in the City through building permits. Since January 1, 2024, all plans must comply with the 2023 Florida Building Code, 8th Edition. The city's fee schedule lists separate permits for pools, roofs, trade work, doors and windows, fences, signs, driveways, sheds and demolition.

Who handles permitting in Casselberry?

Casselberry permitting contact
DetailInformation
Local office95 Triplet Lake Drive, Casselberry, FL 32707
Phone407-262-7700 opt. 5
HoursMonday-Thursday, 7:00 a.m.-6:00 p.m.

Short on time to read all of this?

Get a free quote →

Casselberry permit types

The city's fee schedule lists these permit categories, among others:

Permit category
Building
Electrical
Mechanical
Plumbing

Casselberry building permit cost

Casselberry publishes its permit fees on the Building Division page. Single-family residential permits are $70 per 100 square feet and commercial permits $75 per 100 square feet. HVAC, electrical, plumbing and gas permits are $200, roofs $300 and pools $600. New construction, additions and alterations pay half the permit fee at application, plus the $100 initial plan review fee and $100 initial inspection fee. All fees are paid online.

Not sure this scope needs a permit?

Get a free quote →

Trade permits in Casselberry

  • Building — Casselberry publishes building permit fees and accepts building permit applications through its online portal.
  • Electrical — $200 permit under the city's HVAC/electric/plumbing/gas fee.
  • Mechanical — HVAC permits are $200.
  • Plumbing — Plumbing and gas permits are $200.

How to get a building permit in Casselberry

1. Confirm scope & jurisdiction

Confirm the project address is inside Casselberry and identify every permit record required for the work.

2. Prepare documents

Prepare the application, construction documents and any scope-specific forms or product approvals.

3. Submit the application

Submit through the city online portal. Contractors do not register with the City, but must upload a state licence, workers' compensation certificate or exemption, general liability insurance (both listing the City of Casselberry as certificate holder) and a business tax receipt with every application.

4. Plan review & corrections

Track plan review and respond only to documented comments or requests from the reviewing authority.

5. Pay fees & obtain permit

Pay the locally calculated permit and review charges required before issuance.

6. Schedule inspections & close out

Schedule inspections in the online permitting system. Inspections are performed Monday to Thursday.

Rather talk it over?

Call 1-855-478-4290 →

Inspections in Casselberry

Casselberry states that inspections are performed Monday-Thursday. Monday inspections must be scheduled by 4:00 p.m. on Thursday. Inspection scheduling is available through the online permitting system.

Rather not deal with the building department?

Get a free quote →

Florida building code

The Florida Building Code, 8th Edition (2023), has applied statewide since 31 December 2023; the Florida Building Commission has proposed the 9th Edition (2026) to take effect on 31 December 2026. Florida permit rules

Official Casselberry permitting resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Casselberry permit FAQ

Who handles building permits in Casselberry?

The City of Casselberry Building Division, at 95 Triplet Lake Drive.

Want this handled start to finish?

Get a free quote →

How do I apply?

Through the city's online portal, with the contractor's licence, insurance and business tax receipt uploaded to each application.

How are permit fees calculated?

Single-family residential permits are $70 per 100 square feet, commercial permits $75 per 100 square feet and trade permits $200, plus plan review and inspection fees.

Simplify Casselberry permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Inspections are where schedules slip.

Get a free quote →

Alliance Permitting is a permit documentation and submission company in Florida. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Casselberry sooner?

Let Alliance prepare, file, and track your Casselberry permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Casselberry permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.