To get a building permit in Naugatuck, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The Borough of Naugatuck’s Building Inspector, on the third floor of Town Hall at 229 Church Street, issues building, trade, sign, fire alarm and sprinkler permits through the borough’s OpenGov online portal.

Authority: Borough of Naugatuck Building InspectorCode: 2022 Connecticut State Building CodePhone: 203-720-7035
Authority
Borough Building Inspector229 Church Street, 3rd floor
Filing
OpenGov online portalOne permit type per application
Permit fee
$25 first $1,000, $12 each $1,000 afterBorough code section 7-2
Town Hall hours
Mon–Thu 8:30–4, Fri 8:30–noonFriday afternoons by appointment

In Naugatuck, the borough’s Building Inspector reviews plans, issues permits and inspects the work, and the borough takes every permit type through OpenGov; state law lets an applicant file in person, by mail or by email in the manner the building official sets, so call 203-720-7035 if you cannot use the portal. The borough code charges $25 for the first $1,000 of work and $12 for each $1,000 after that, and a zoning permit from the Land Use Office comes first for new houses, additions, decks, sheds, pools, fences and signs.

What requires a building permit in Naugatuck?

Naugatuck’s portal quotes the state code’s rule in full: anyone who intends to build, enlarge, alter, repair, move, demolish or change the occupancy of a building, move a lot line that affects one, or install or change electrical, gas, mechanical or plumbing systems must apply to the building official and get the permit first. The borough splits the work into separate online applications, and the portal reminds applicants to use the right form for the work being done.

Borough permit types

  • Building permit
  • Electrical, plumbing and mechanical (HVAC) permits
  • Roof, siding, windows and doors permit
  • Swimming pool permit (zoning first)
  • Demolition permit
  • Sign permit
  • Fire sprinkler and fire alarm permits

Exempt from a building permit (not from zoning)

  • One-story sheds and playhouses up to 200 sq ft
  • Fences up to 7 feet, except pool barriers
  • Retaining walls up to 3 feet without a surcharge
  • Patios, walks and driveways up to 30 inches above grade
  • Freestanding decks up to 200 sq ft and 30 inches high that do not serve the exit door
  • Roof and siding repairs limited to 25% in one calendar year

The exemption list carries a warning in capitals that it does not exempt anyone from zoning, and the Land Use Office has its own zoning permit for sheds, pools, decks, fences, signs and additions. Emergency equipment replacement or repairs may go ahead, but the permit application must reach the building official by the next working business day.

What the borough decides and what the state holds

Naugatuck is governed as a borough by the Board of Mayor and Burgesses, and its code sets the local pieces: the permit fee and certificate of occupancy charges in section 7-2, the hours when construction may happen in section 7-6, and a 25-foot building setback along both sides of Rubber Avenue from Meadow Street to Gunntown Road in section 7-1. Zoning, wetlands and sewers are borough functions too. The building code, and the decision whether plans comply with it, belong to the state code and the state-licensed building official.

Short on time to read all of this?

Get a free quote →

Naugatuck building department: who handles permitting

The Building Inspector’s office regulates construction, use and occupancy through plan review, permit issuance and site inspections, and also administers the borough’s hazardous-buildings ordinance, under which the inspector can hold a hearing and order a dangerous building repaired or demolished, allowing at least 25 days, with appeals to the Building Code Board of Appeals and then to the Board of Mayor and Burgesses. Bill Herzman is the Building Inspector. The office asks applicants who need help with an application to call and book an appointment, and municipal searches of its records are by appointment only. Zoning, planning and inland wetlands work is handled by the borough’s Land Use Office, whose Town Planner is also the wetlands enforcement officer.

Naugatuck permitting contact
DetailInformation
OfficeBuilding Inspector, Town Hall, 229 Church Street, 3rd Floor, Naugatuck, CT 06770
Phone203-720-7035 (fax 203-720-7034)
EmailBuilding@naugatuck-ct.gov
Town Hall hoursMonday to Thursday 8:30 a.m. to 4 p.m.; Friday 8:30 a.m. to noon, and by appointment after noon
PortalOpenGov (ViewPoint Cloud), naugatuckct.viewpointcloud.com; portal emails come from noreply@viewpointcloud.com
Land Use OfficePlanning, zoning and wetlands, 203-720-3396 (fax 203-720-5026)

Naugatuck permit types and application documents

The application must be made by the owner or the owner’s authorized agent. It has to describe the work, identify the land by address or legal description, state the intended use and occupancy, include construction documents, state the value of the work at market value, and be signed. A contractor who must be registered as a home improvement contractor has to put the company name, business address and Department of Consumer Protection registration number on the application.

Residential permits

A new house starts with the Land Use Office’s new-construction zoning permit, which needs an A-2 survey; additions, decks, sheds, pools, fences and signs go on the separate zoning permit. The pool permit is not issued until zoning approves it, and the portal gives 203-720-7208 for that call. Re-roofing, siding, window and door jobs have their own permit, which asks for the roofing type, the materials and the venting. An HVAC permit needs the installation instructions, the equipment being installed, a load calculation and copies of every contractor’s license and insurance.

Commercial permits

Commercial work uses the same building, trade, sign and demolition applications, plus the fire sprinkler and fire alarm permits that the borough also files under the Building Department. A new commercial building or a commercial addition over 1,000 sq ft needs zoning compliance backed by an A-2 survey. Food businesses deal with the Water Pollution Control Authority’s fats, oils and grease permit, and sewer connections, sewer permits and main extensions are separate WPCA applications in the same portal.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

State law, quoted on the portal, bars any building permit for work subject to zoning until the zoning officer certifies it complies. Wetlands questions go to the Town Planner, and every land-use application carries a separate $60 state fee. Work in the street needs Engineering’s street opening (right-of-way) permit, Engineering also issues stormwater inspection certifications, and a lot on septic or a private well deals with the Naugatuck Valley Health District, which has served the borough since 1985. In a flood hazard area the building official must judge whether the work is a substantial improvement: if its value, including repair of damage from any cause, reaches 50% of the building’s market value, the whole building must meet the flood rules.

Naugatuck permit costs and fees

Section 7-2 of the borough code sets the building permit fee and the certificate of occupancy charges, last revised by the Board of Mayor and Burgesses in April 2006. Zoning fees come from a separate Land Use schedule revised by the board in 2003 and 2004.

Naugatuck permit and land-use fees
ItemFee or rule
Permit fee, first $1,000 of work$25
Each $1,000 after that$12
Certificate of occupancy, residential$15 per family unit
Certificate of occupancy, business or mercantile$25 per unit
Certificate of occupancy, industrial$25 up to 40,000 sq ft; $35 over
Zoning compliance, new house (first unit / each added unit)$300 / $150
Zoning compliance, residential addition or in-ground pool$150
Zoning compliance without A-2 survey (decks, detached accessory buildings) / fences$75 / $25
State fee on every land-use application$60

Rather talk it over?

Call 1-855-478-4290 →

For example, a $20,000 job costs $25 for the first $1,000 plus 19 × $12 ($228), so $253 for the permit. A new house adds the $15 certificate of occupancy and the $300 zoning compliance fee plus the $60 state land-use fee. On the commercial side, zoning compliance for a new building or an addition over 1,000 sq ft is $500, a site plan needing Zoning Commission review $300, a special permit $500 and a letter of zoning compliance $25. The state education fee of 26 cents per $1,000, which state law has building officials assess on every building permit application, comes on top of the borough fee, and the example uses a whole-thousand value.

⚠️ Construction hours are limited. Borough code section 7-6 allows excavation, demolition and building work only from 7 a.m. to 6 p.m. on weekdays and Saturdays, never on Sundays except in an emergency; urgent work outside those hours needs a permit from the building inspector, renewable for up to three days at a time, and a breach carries a $150 fine.

Trade permits and who may pull them in Naugatuck

Electrical, plumbing and mechanical (HVAC and associated work) permits are their own applications on the portal, and fire sprinkler and fire alarm permits sit in the same Building Department list. Each is filed by the owner or an authorized agent; a contractor acting as agent must follow section 20-338b of the General Statutes, as the portal notes, and list the registration number. Contractors doing electrical, plumbing or heating and cooling work need the matching Department of Consumer Protection license.

The state code exemptions repeated on the portal cover only small items: cord-and-plug decorative lighting, re-installing receptacles, replacing breakers of the same rating, low-voltage work under 25 volts and 50 watts, portable heating, cooking and cooling appliances, minor parts that do not change the equipment’s approval, and clearing stoppages or fixing leaks without replacing or rearranging pipes. Anything larger needs the trade permit.

Rather not deal with the building department?

Get a free quote →

How to apply for a Naugatuck building permit

1. Start with zoning

File the Land Use zoning permit in the portal (new construction or additions, sheds, pools, decks, fences and signs), with an A-2 survey where the schedule requires it, and settle any wetlands questions with the Town Planner.

2. Sort out sewer or septic and street work

Sewer connections go to the WPCA; septic or well lots go to the Naugatuck Valley Health District; work in the road needs a street opening permit.

3. Register in OpenGov

Create an account at naugatuckct.viewpointcloud.com and mark noreply@viewpointcloud.com as safe so the borough’s messages do not land in spam.

4. File the right permit for each trade

Building, electrical, plumbing, mechanical, roofing and siding, pool, sign or demolition, each with its own market value and documents.

5. Answer review and pay

The building official examines the application and either issues or refuses it in writing with reasons.

6. Build within the permitted hours and arrange inspections

Work only within the code’s construction hours, and contact the Building Inspector’s office (203-720-7035) about inspections.

Review, corrections and what causes delay

The building official must examine the application within 30 days of filing and issue or deny the permit in that time; if the plans do not comply, the rejection comes in writing with the reasons. Any of the borough’s listed requirements can hold a file: a missing zoning certificate, the wrong permit form, HVAC or roofing details left off, or a contractor’s registration number not on the application. If you need help with the application, the office asks you to call 203-720-7035 to book an appointment rather than drop in, and Town Hall’s Friday hours end at noon, with afternoon visits by appointment only.

Naugatuck inspections and closeout

The Building Inspector carries out on-site inspections of permitted work as part of the borough’s plan review and permit process. To arrange an inspection, contact the office at 203-720-7035 or Building@naugatuck-ct.gov. Work on a pool, an addition or a new house must already have its zoning approval before the building permit, and therefore the inspections, can begin.

A building may not be occupied until a certificate of occupancy is issued. The borough charges $15 for each family unit in a residential building, $25 per unit for business and mercantile space, and $25 or $35 for industrial buildings depending on whether they are over 40,000 sq ft. Demolition permits carry their own conditions: the applicant must have the state insurance certificate (at least $100,000 per person and $300,000 aggregate for bodily injury, $50,000 and $100,000 for property damage), utility disconnection notices and a demolition contractor registration, and must notify adjoining owners by registered or certified mail. An owner may take down his own single-family house or outbuilding of 30 feet or less if he is on site throughout and accepts personal liability.

Want this handled start to finish?

Get a free quote →

Connecticut building code

Naugatuck enforces the 2022 Connecticut State Building Code, which built on the 2021 International Codes and covers applications filed from October 1, 2022. The next edition, planned for 2026, has been delayed; when it takes effect, the date the application is filed will set which code applies.

Connecticut has one State Building Code: the code itself sets which work needs a permit and which is exempt, every town’s building official is licensed by the State Building Inspector, and there is no county government. Connecticut rules

Naugatuck building permit FAQ

How much is a building permit in Naugatuck?

$25 for the first $1,000 of work and $12 for each $1,000 after that, under borough code section 7-2. A $20,000 job pays $253.

How do I apply?

Online through the borough’s OpenGov portal at naugatuckct.viewpointcloud.com, choosing the permit type that matches the work. Call 203-720-7035 to book help with the application.

Do I need zoning approval for a shed or fence?

Yes. Even where the building code exempts a shed or fence, the Land Use Office’s zoning permit still applies: $75 for a deck or detached accessory building without an A-2 survey and $25 for a fence, plus the $60 state fee.

When can construction take place?

From 7 a.m. to 6 p.m. on weekdays and Saturdays. No work may start on a Sunday except in an emergency.

Can I demolish my own garage?

An owner may demolish his own single-family house or outbuilding up to 30 feet high, staying on site and accepting personal liability, but still needs the demolition permit, insurance certificate, utility notices and neighbor notices.

Who handles septic systems in Naugatuck?

The Naugatuck Valley Health District, which Naugatuck joined in 1985 and which also serves Ansonia, Derby, Seymour, Shelton and Beacon Falls.

How do I look up old permits?

Municipal searches at the Building Inspector’s office are by appointment only; call 203-720-7035.

Inspections are where schedules slip.

Get a free quote →

Naugatuck permit search and official resources

Applications filed online can be followed in the OpenGov account used to file them. Older building files are searched at the Building Inspector’s office, by appointment only, on the third floor of Town Hall. Board of Mayor and Burgesses agendas and minutes are posted on the borough’s agendas and minutes page. Flood hazard areas, where the 50% substantial-improvement rule applies, are shown on FEMA’s flood maps for the borough, in effect since July 8, 2013.

Simplify Naugatuck permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Connecticut. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Naugatuck sooner?

Let Alliance prepare, file, and track your Naugatuck permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Naugatuck permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.