Building permits in the City of West Hollywood come from the Building and Safety Division of the Community Development Department at City Hall, 8300 Santa Monica Boulevard (323-848-6320, building@weho.org). Applications, plan review, payments and inspection requests go through the city’s Permitting and License Portal, launched August 19, 2024. Projects submitted since January 1, 2026 must meet the 2025 California codes and the 2026 Los Angeles County amendments as adopted by the city, and fees come from Fee Resolution 25-028, approved by the City Council on May 5, 2025.
What requires a building permit in West Hollywood?
The Building and Safety Division enforces the building, electrical, plumbing and mechanical codes, state accessibility and energy rules, and the municipal code sections the City Council has adopted, and it inspects all construction projects. Its handouts and fee schedule show the work it permits:
Building work
- Single-family and multifamily additions and remodels, and new buildings
- Kitchen and bathroom remodels, window replacements and re-roofs
- Tenant improvements, awnings, canopies and wall signs
- Demolition, shoring and excavation, and grading
- Swimming pools, with a pool enclosure
Systems and other approvals
- Electrical, plumbing and mechanical work, each with its own plan check rate
- Rooftop solar, through a streamlined process for small residential systems
- Fire plan check and inspection by the Los Angeles County Fire Department
- Encroachment permits for work in the street, which use their own system
- Planning permits such as demolition, administrative and development permits
The division does not post its own list of work exempt from permits; call 323-848-6320 before starting minor work. Work done without permits carries an extra fee of $325.34 for a single-family (R-3) building and $588.56 for other buildings.
What West Hollywood decides and what the state holds
The city adopts the Los Angeles County amendments to the state codes, sets its fees by council resolution, runs a mandatory green building program in effect since October 1, 2007 and a seismic retrofit program, limits construction hours, and requires a business tax certificate. The state writes the building code and licenses contractors.
West Hollywood building department: who handles permitting
The City of West Hollywood issues building, electrical, plumbing, mechanical and grading permits inside the city through the Building and Safety Division, one of three Community Development divisions alongside Current and Historic Preservation Planning and Long Range Planning. The division reviews permit and plan check applications, calculations and geotechnical reports and inspects all construction. Ben Galan is the city’s Building Official. Fire plan check, permits and inspections come from the Los Angeles County Fire Department’s fire prevention office for West Hollywood.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building and Safety, City Hall, 8300 Santa Monica Boulevard, West Hollywood, CA 90069 |
| City Hall hours | Monday to Thursday 8 a.m. to 6 p.m.; Friday 8 a.m. to 5 p.m.; walk-in counter, appointments recommended |
| Building and Safety | 323-848-6320, building@weho.org |
| Inspectors | 323-848-6335, inspector@weho.org (allow one business day) |
| Planning / City Hall | 323-848-6475 / 323-848-6400 |
| Permit Navigator (commercial tenant improvements) | 323-848-3113, permitnavigator@weho.org |
| LA County Fire prevention office | 864 N. San Vicente Blvd.; 310-358-2380 |
West Hollywood permit types
Most building, planning and trade permits are applied for in the Permitting and License Portal. A few permit types were not in the portal at launch and keep their own systems: encroachment, garage and yard sale, film and parking permits. The city posts a user guide for registering and logging in.
Residential permits
- Additions and remodels: separate submittal guides cover single-family additions and remodels, multifamily additions and remodels, and kitchen and bathroom remodels, plus a residential window replacement handout and a prescriptive certificate of compliance for re-roofs.
- Second stories: up to 500 square feet of second-story construction on a single-family home or duplex can go through the faster administrative permit process, in which the assigned planner makes contact within five business days and sends any incompleteness letter within 15 business days.
- ADUs: a Planning ADU permit is $361, and the city posts an ADU legalization program handout (AB 2533).
- Solar: small residential rooftop systems use the city’s streamlined approval process; questions go to 323-848-6320.
- Roofs: separate cool roof handouts cover residential and nonresidential buildings.
- Owner-builders: the city posts an owner-builder permit requirements handout.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial tenant improvements follow the tenant improvement submittal guide. The Permit Navigator program gives new and existing businesses one-on-one help with zoning, land use and permitting; the city asks applicants to contact the navigator before submitting any permit application or signing a lease. Qualifying low-impact tenant improvements can get same-day approval through the by-appointment over-the-counter plan review program. For sites in liquefaction or fault precaution zones, the city posts seismic element maps and a prescriptive foundations handout for liquefaction zones.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Construction development permits: $7,068 for new projects under 10,000 square feet and $3,568 for major remodels and additions (Class C), with larger projects at $24,146.
- Demolition: a Planning demolition permit for a primary structure, approved by the Director, is $619.
- Administrative permit: $1,681; a minor conditional use permit $6,309 and a major variance $8,270.
- Zone clearance: $361 when an inspection is required, $103 when not.
- Historic properties: certificate of appropriateness fees are waived, as are Mills Act contract applications.
- Subdivisions: a parcel or tract map is $4,211 and a lot line adjustment $1,432, including the recording fee.
- Other agencies: depending on the project, other city and county agencies may need to review and approve it; the city posts an Outside Agency Approvals handout.
West Hollywood building permit fees
The Revenue Management page posts Fee Resolution 25-028, approved by the City Council on May 5, 2025, with fees for fiscal year 2025-26 effective July 1, 2025, or 60 days after adoption for development project fees under Government Code section 66017; for Building and Safety it was the fourth and final year of 5% annual increases approved in the fiscal year 2022-23 fee study. No later fee resolution is posted there, and the link labelled “FY26 Fee Schedule” on that page opens the fiscal year 2024-25 schedule, so ask the division for the amounts in force today. The resolution sets the building permit base fee in valuation bands (up to $700, $700 to $1,000, $1,000 to $25,000, $25,001 to $50,000, $50,001 to $100,000 and over $100,000), and the other building charges are calculated from that base fee:
| Charge | Rule or amount |
|---|---|
| Building plan check | 85% of the building permit base fee plus the energy and disabled access fees |
| Energy fee / energy plan check | 10% of the building permit base fee each |
| Disabled access fee, permit / plan check | 5% of the building permit base fee each |
| Green building standards | $1 per $25,000 of valuation |
| Technology fee | 4% of all base fees, except plan check |
| Issuance fee / change of contractor | $53.62 / $53.62 |
| Electrical / plumbing / mechanical plan check | 80% / 40% / 50% of the trade permit fees |
| Additional plan check review, per hour | $211.15 |
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Electrical, new single- or two-family home, per sq ft | $0.25 |
| Electrical service up to 399 amps / 400 to 1,000 amps | $74.74 / $146.97 |
| Residential swimming pool electrical | $171.18 |
| Plumbing fixture, or water heater and vent, each | $31.39 |
| Furnace or compressor up to 100,000 BTU | $52.23 |
| Grading permit, 1 to 50 cubic yards / 51 to 1,000 | $312.56 / $465.09 |
| Grading plan check, 1 to 1,000 cubic yards | $553.16 |
| Demolition inspection (sewer cap) | $315.61 |
| Pool, spa or hot tub barrier inspection | $178.09 |
| Geology or soils engineering report review / both | $813.76 / $1,139.10 |
| Re-inspection, building or trade | $189.48 |
| Certificate of occupancy / temporary certificate | $195.59 / $292.83 |
Trade permits and who may pull them in West Hollywood
Electrical, plumbing and mechanical permits are issued by the Building and Safety Division through the same portal and priced item by item in the fee resolution, with plan check at 80% of the electrical, 40% of the plumbing and 50% of the mechanical permit fees and a minimum plan check fee of $211.15. The MEP plan check handout covers residential and nonresidential projects. Electrical work without a permit has an investigation fee of $606.95, or $325.34 when done by an owner.
The division links a resource for choosing a contractor who is licensed and in good standing, and posts an owner-builder permit requirements handout for owners doing their own work. Businesses operating in the city obtain a business tax certificate: Revenue Management (323-848-6451) asks for the first business tax application within 30 days of the start of business operations, and the city’s business tax certificate page explains the process. Licensing questions go to 323-848-6437.
How to apply for a West Hollywood building permit
Ask Planning (323-848-6475) whether the project needs a development, administrative or demolition permit first; commercial tenants can start with the Permit Navigator.
Create an account in the Permitting and License Portal using the city’s user guide.
Use the matching submittal guide, the concurrent plan check checklist and the geotechnical checklist where soils reports apply.
Upload the application and plans; incomplete submittals are denied.
Resubmit through the portal; additional review is billed at $211.15 an hour.
Pay the permit fees; approved plans are released in the portal when the permit is issued.
Book each inspection in the portal before 4 p.m. the day before.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
Incomplete submittals are denied, so the package must be complete when it is filed. If you disagree with a reviewer’s interpretation or request, the city’s guaranteed second opinion process lets you ask the reviewer’s supervisor, then the Division Manager and then the Department Director; it cannot reopen formal decisions by the Director or other decision-making bodies. The handouts also include an At Risk Plan Check Acknowledgement form; ask the division when it applies to your project.
West Hollywood building inspections
Inspections are scheduled in the Permitting and License Portal by anyone with a valid permit and an account. Schedules are coordinated the day before each business day, and requests must be in before 4 p.m. Give the name and phone number of the person who will be on site, and have the site available within 3 hours of the time shown on the inspection record. The daily inspection schedule is posted online each morning. The city does not issue inspection cards: results appear in the applicant’s portal account. The approved plans must be printed at 24 by 36 inches and kept at the job site for inspections. Deputy inspectors sign in on the city’s Deputy Inspector Sign In form, structural observations are reported on the city’s Structural Observation Report Form, and an interactive voice response (IVR) inspection request handout is also posted.
Construction is limited to 8 a.m. to 7 p.m. Monday through Friday, interior work only on Saturdays, and none on Sundays or city holidays; Code Enforcement enforces these hours with stop-work orders and fines, and issues extended-hours construction permits only in limited circumstances. Re-inspections are $189.48, and hourly inspections or inspections with no set fee also $189.48.
California building code in West Hollywood
Projects submitted to the Building and Safety Division on or after January 1, 2026 must comply with the 2025 California codes and the 2026 Los Angeles County amendments as adopted by West Hollywood. The city’s own building rules add its green building program, the soft, weak or open-front (SWOF) seismic retrofit program and its WeHo Type V construction requirements handout. FEMA’s Community Status Book lists the City of West Hollywood (community 060720) as participating in the National Flood Insurance Program, with a current flood map dated September 26, 2008.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Want this handled start to finish?
Get a free quote →West Hollywood permit search and official resources
Permit status, approved plans and inspection results are in the applicant’s Permitting and License Portal account. For older records, the fee resolution lists $5.28 for a search of office records with a single copy of a permit and $66.40 to reproduce microfilmed plans, plus $5.28 per sheet.
- West Hollywood Building and Safety
- Permitting and License Portal
- Inspection services
- Daily building inspection schedule
- Building and Safety guides and handouts
- Owner-builder permit requirements
- Permitting enhancement initiatives
- Community Development Department
- Green building program
- SWOF seismic retrofit program
- Extended hours construction permits
- Encroachment permits
- Revenue Management
- Fee Resolution 25-028
- Business tax certificate application
- Los Angeles County Fire Department, Fire Prevention
- FEMA Community Status Book, California
Inspections are where schedules slip.
Get a free quote →West Hollywood building permit FAQs
How do I apply for a building permit in West Hollywood?
Through the city’s Permitting and License Portal, after creating an account. The City Hall counter at 8300 Santa Monica Boulevard also takes walk-ins.
Which code applies to my project?
Projects submitted on or after January 1, 2026 follow the 2025 California codes and the 2026 Los Angeles County amendments adopted by the city.
How is plan check charged?
At 85% of the building permit base fee plus the energy and disabled access fees; trade plan checks are a share of the trade permit fees.
How do I schedule an inspection?
Book it in the portal before 4 p.m. the day before, and keep the site open within 3 hours of the scheduled time.
What are the construction hours?
8 a.m. to 7 p.m. on weekdays and interior work only on Saturdays; no work on Sundays or city holidays.
Is there help for business tenant improvements?
Yes. Contact the Permit Navigator (permitnavigator@weho.org, 323-848-3113) before applying or signing a lease.
Do I get an inspection card?
No. Results are posted in your portal account.
Who handles fire plan check?
The Los Angeles County Fire Department’s fire prevention office, 310-358-2380.
Simplify West Hollywood permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in West Hollywood sooner?
Let Alliance prepare, file, and track your West Hollywood permits while your crew stays on the job.
More California permitting guides
Los Angeles County
Read guide →Agoura Hills
Read guide →Arcadia
Read guide →West Sacramento Building Permit Guide
Read guide →Westminster Building Permit Guide
Read guide →Whittier Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about West Hollywood permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.