Skip to main content
Municipal GuideCaliforniaScotts Valley · Santa Cruz County

Scotts Valley, California Building Permit Guide

To get a building permit in Scotts Valley, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Scotts Valley’s Building Department at City Hall takes every permit application through the city’s OpenGov portal, prices work under the fiscal 2026–27 master fee schedule and keeps a walk-in counter on Tuesday and Thursday mornings.

Authority: City of Scotts Valley Building DepartmentApply: OpenGov portalCounter: Tue & Thu 8 a.m.–noon
Authority
City Building Department1 Civic Center Drive
Apply
OpenGov portal onlyNo permits by mail
Minimum fee
$1,136 permitWork valued up to $5,000
Inspections
Booked in the portalConfirmed in 24–48 hours

Inside the City of Scotts Valley, the city’s Building Department at City Hall, 1 Civic Center Drive, issues building permits, which cover the electrical, plumbing and mechanical work that goes with them; Nelson Alfaro is the Building Official. All applications, plans, fee payments and inspection requests go through the city’s OpenGov portal. Under the master fee schedule effective July 6, 2026, a valuation-based permit starts at $1,136 for work up to $5,000, with a separate plan check deposit from $861.

What requires a building permit in Scotts Valley?

The city’s fee schedule is the clearest list of what it permits: new construction, additions and remodels on a valuation table, plus separate fees for decks, kitchens, bathrooms, pool repairs, demolition, re-roofing, windows, solar, water heaters and simple stand-alone trade jobs.

Permit required

  • New homes, additions and remodels
  • Deck repairs and replacement
  • Kitchen and bathroom remodels
  • Re-roofing and window retrofit or replacement
  • Water heaters, HVAC change-outs, new circuits, fixtures and gas lines
  • Solar and energy storage systems
  • Demolition and changes of occupancy
  • Septic work and sewer lateral connections

Separate permit or review

  • Grading, by the thresholds below
  • Erosion control
  • Fences and retaining walls
  • Pools and spas
  • Design review and cultural resource alteration
  • Tree removal
  • Work in the public right-of-way (encroachment)

When grading needs its own permit

A separate grading permit application is required for excavations over 50 cubic yards, 2 feet or more deep, or creating cut slopes taller than 5 feet and steeper than 3 to 1; for fills over 50 cubic yards, more than 1 foot deep, on slopes steeper than 5 to 1, blocking a drainage course, within 5 feet of a proposed structure, supporting a road, covering 11,001 square feet or more, or in a riparian zone; and for clearing more than 11,000 square feet on slopes of 5% or less, any clearing on steeper slopes, or clearing that is part of a plan totalling an acre or more.

What Scotts Valley decides and what the state holds

The city sets its own fees, zoning, hillside and tree rules, construction hours and grading thresholds, and it runs the sewage disposal and sewer connection permits that its forms list. Building work may take place Monday to Friday from 8 a.m. to 6 p.m. and Saturday from 9 a.m. to 5 p.m.; no construction work is allowed on Sunday. Contractor licensing is a state matter.

Scotts Valley building department: who handles permitting

The City of Scotts Valley Building Department issues building permits for all work inside the city limits, reviews the plans and inspects the work. Planning and zoning approvals come from the city’s Planning Department in the same building, led by Community Development Director Taylor Bateman. Land outside the city is permitted by Santa Cruz County.

Short on time to read all of this?

Get a free quote →
Scotts Valley permit contacts
DetailInformation
OfficeBuilding Department, City Hall, 1 Civic Center Drive, Scotts Valley, CA 95066
Building OfficialNelson Alfaro
Emailsvbuildingdepartment@scottsvalley.gov
Phone831-440-5640 on the city’s building forms; the Building FAQ lists 831-440-5630; City Hall 831-440-5600
Walk-in counterTuesday and Thursday, 8:00 a.m. to noon, or by appointment
Permit portalOpenGov (ViewPoint Cloud), open 24 hours a day
Inspection questionsBuilding inspector line 831-440-5641
Planning Departmentplanningdepartment@scottsvalley.gov; 831-440-5630; counter Tuesday and Thursday, 8 a.m. to noon

Scotts Valley permit types

Every application is filed in the OpenGov portal. The department also posts a special inspection form, an owner declaration and owner agent form, the state notice and verification for owner-builders, cost documentation and unreasonable hardship forms for accessibility upgrades, a construction waste management plan, a smoke and carbon monoxide alarm certification and generator installation guidance.

Residential permits

  • New homes and additions need complete plans drawn to at least 1/8 inch per foot (1/4 inch recommended), signed by their preparer and wet-stamped by a California architect or engineer where required. The site plan shows easements, lot coverage, setbacks, grades, utilities, slopes and nearby trees.
  • Hillside lots: where a lot slopes more than 10%, the plans need 2-foot contours and the city’s hillside regulations apply; expansive soil or a slope of 25% or more calls for two wet-signed soils reports.
  • Remodels and trade work have their own checklists for interior remodels and for mechanical, electrical and plumbing plans.
  • Solar and batteries can go through SolarAPP+ automated review.
  • Unpermitted ADUs and JADUs built before January 1, 2020 can be legalized under the city’s amnesty bulletin; smoke alarms, carbon monoxide detectors and escape openings may still be required.

Commercial permits

Commercial, industrial and tenant improvement plans are submitted as a digital PDF set with general notes on sprinklers, occupancy, construction type and code editions, a parking plan where the use or exterior changes, and details showing disabled access to parking, entrances, restrooms and other facilities. Changes of occupancy carry a $918 permit.

What comes before the building permit

  • Zoning and design review: the Planning Department checks zoning and permitted uses; design review, use permits and variances need one Planning Commission hearing, followed by a 10-day appeal period to the City Council.
  • Tree removal: a permit is needed for any tree within 5 feet of a public right-of-way, single-trunk trees of 13 inches diameter or more at 4 feet above ground, oaks from 8 inches, and heritage trees, among others listed in the Planning FAQ.
  • Archaeology: grading of more than 4 cubic yards needs a check with Planning on whether archaeological monitoring is required.
  • Septic and sewer: the city’s own sewage disposal permit application covers new septic systems, repairs and tank replacements, and a separate application covers sewer connections.
  • Right-of-way work needs a city encroachment permit, priced by level of work.

Not sure this scope needs a permit?

Get a free quote →

Scotts Valley building permit fees

Fees come from the City of Scotts Valley Master Fee Schedule for fiscal year 2026–27, effective July 6, 2026. New construction, additions and remodels pay a building permit fee and a plan check and processing deposit, each on its own valuation table; both include the associated mechanical, plumbing and electrical work. The steps between bands are as printed and do not always add up exactly from one band to the next.

Scotts Valley valuation tables (FY 2026–27)
ValuationBuilding permitPlan check deposit
$1 to $5,000$1,136 minimum$861 minimum
$5,001 to $25,000$1,136 plus $35 per added $1,000$861 plus $20 per added $1,000
$25,001 to $100,000$1,860 plus $39 per added $1,000$1,291 plus $23 per added $1,000
$100,001 to $500,000$4,824 plus $10 per added $1,000$3,158 plus $7 per added $1,000
$500,001 to $1,000,000$9,149 plus $23 per added $1,000$6,460 plus $30 per added $1,000
$1,000,001 to $5,000,000$21,295 plus $2 per added $1,000$21,823
Over $5,000,000$31,631 plus $4 per added $1,000$22,971 plus $4 per added $1,000
Flat building fees (FY 2026–27)
ItemFee
Deck repair or replacement, up to / over $25,000$1,800 / $2,700
Kitchen remodel, up to / over $40,000$2,300 / $3,500
Bathroom remodel, up to / over $25,000$1,900 / $2,500
Pool repairs, up to / over $50,000$2,700 / $3,500
Re-roof$458
Demolition / change of occupancy$803 / $918
Window retrofit / replacement, under $5,000$324 / $540
Residential solar, 1–15 kW$450 plus $15 per kW over 15
Stand-alone water heater$183
Simple stand-alone trade permit, up to 3 items$287
Septic tank inspection / sewer lateral connection inspection$1,148 / $1,032
Inspection or re-inspection$228 each
Plan revisions$267 first hour, $114 each added half hour
After-hours inspection$246 an hour, 4-hour minimum
Extend or reinstate an expired permit (no scope change)$171

Rather talk it over?

Call 1-855-478-4290 →

Every building permit also carries a general plan maintenance fee of 0.55% of valuation, a green building education fee of 0.25% of valuation, a permit technology fee of 4% of the permit fees assessed, the state building standards fee (0.004% of valuation, $1 minimum) and the state seismic fee (0.013% of valuation for residential and 0.028% for commercial work, 50 cents minimum). Reinstating an expired permit with a changed scope costs 50% of the original permit fee.

Worked example: a re-roof valued at $20,000 pays the $458 permit fee, $110 general plan maintenance, $50 green building education, the $1 minimum state standards fee and $2.60 residential seismic fee, a total of $621.60, plus the 4% technology fee on the permit fees assessed ($18.32 on the $458 permit fee).

Selected planning and engineering fees (FY 2026–27)
ItemFee
Planning plan check: over the counter / minor / major / hillside$212 / $1,061 / $3,399 / $2,124
Design review, residential (first 15 hours) / with hillside (first 20 hours)$6,374 / $8,498, then $424 an hour
Minor use permit (first 10 hours)$4,249, then $424 an hour
Protected tree removal / heritage tree removal (first 15 hours)$141 / $6,374
Home occupation review$141
Encroachment permit, non-construction / Level A / Level B$360 / $722 / $2,531

Trade permits and who may pull them in Scotts Valley

Electrical, plumbing and mechanical work on a new building, addition or remodel is included in the valuation-based building permit. Stand-alone trade work without framing is priced separately: a water heater alone is $183, and a residential simple permit at $287 covers up to three items from the city’s lists, such as an HVAC change-out, a mini-split, new outlets, a service of up to 400 amps, plumbing fixtures or gas lines. Residential jobs with more than three items, and commercial trade permits, go on the valuation table.

Rather not deal with the building department?

Get a free quote →

The city’s FAQ says the work can be done by the owner as owner-builder or by a licensed contractor. Owner-builders sign the owner declaration and the state notice and verification, and the city posts an owner-builder information handout explaining the risks of acting as worker, contractor or employer. An owner agent form lets someone else apply for the owner.

All businesses operating in the city, including contractors from elsewhere, need a Scotts Valley business license. HdL Companies runs applications and renewals for the city online; since January 1, 2025 the business license tax is based on gross receipts, with a minimum of $150 a year, renewed each July 1. The master fee schedule adds a new application fee of $271 for a local business or $62 for a non-local one.

How to apply for a Scotts Valley building permit

1. Check zoning and planning approvals

Ask the Planning Department about zoning, hillside rules, design review and tree permits before you design.

2. Check grading and utilities

Use the grading thresholds to see if a separate grading permit is needed, and plan septic or sewer connection permits with the building permit.

3. Prepare the plans

Follow the city’s minimum submittal checklist for your project type and have a licensed architect or engineer stamp the sheets where required.

4. Register in OpenGov

Create an account on the city portal; registration is required to apply and to request inspections.

5. Submit and pay

Upload the application and plans in the portal, which is open 24 hours a day. Pay online by card (3% processing fee) or by check mailed or left in the City Hall mail slot.

6. Answer corrections and collect the permit

Track review comments and issuance in the portal, then keep the permit on site.

Review, corrections and what causes delay

Partial plans are not accepted, and plans must describe the whole scope of work. Common causes of extra review are missing soils reports on expansive or steep lots, missing contours on hillside lots and grading that needs its own permit. Revisions after review are billed at $267 for the first hour and $114 for each added half hour. On the planning side, design review and use permit applications go through a standard 30-day review by city departments before they are deemed complete.

Scotts Valley building inspections

Inspections are requested only through the OpenGov portal. Log in, open the application under My Account, pick the inspection and click New Appointment; you can add a note on the type of inspection you need. The city says confirmation arrives within 24 to 48 hours. Anyone who did not apply for the permit, such as a subcontractor, must be added as a guest by the applicant before they can book. Questions go to the building inspector line, 831-440-5641.

Each added inspection or re-inspection costs $228, and inspections outside normal hours are $246 an hour with a 4-hour minimum. Results are posted in the portal. One- and two-family projects use the city’s smoke and carbon monoxide alarm certification form.

Want this handled start to finish?

Get a free quote →

California building code in Scotts Valley

The Building Department states that the 2025 California Building Codes have been in effect since January 1, 2026, replacing the 2022 codes. The city’s own building rules and any local amendments are in the Scotts Valley Municipal Code; ask the department which amendments apply to your project. FEMA’s Community Status Book lists the City of Scotts Valley (community 060356) as participating in the National Flood Insurance Program, with flood maps effective May 16, 2012.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Scotts Valley permit search and official resources

Permit status, issued permits and inspection results for current projects are shown in the OpenGov portal. For older records, visit the Building Department during counter hours (Tuesday and Thursday, 8 to 11:50 a.m.) and ask to see the building permit history files for the address.

Inspections are where schedules slip.

Get a free quote →

Scotts Valley building permit FAQs

How do I apply for a building permit in Scotts Valley?

Online through the city’s OpenGov portal after registering an account. The city does not issue permits by mail; the walk-in counter is open Tuesday and Thursday from 8 a.m. to noon for questions.

How much is a building permit in Scotts Valley?

For new construction, additions and remodels, the fiscal 2026–27 schedule starts at $1,136 for work valued up to $5,000, plus a plan check deposit from $861. Many common jobs have flat fees, such as $458 for a re-roof or $2,300 for a kitchen remodel up to $40,000.

How do I schedule an inspection?

Request it in the OpenGov portal under your application; confirmation comes within 24 to 48 hours. Subcontractors must be added as guests by the applicant first.

Do I need a grading permit?

Yes for excavations or fills over 50 cubic yards, excavations 2 feet or deeper, fills over 1 foot deep, fills near a structure or in a riparian zone, and clearing beyond the city’s area and slope limits.

Can I do the work myself?

Yes. The city lets owners act as owner-builders, with the owner declaration and the state notice and verification; otherwise a licensed contractor does the work.

Do I need a permit to remove a tree?

Often. Trees within 5 feet of a public right-of-way, single-trunk trees 13 inches or more in diameter, oaks from 8 inches and heritage trees need a permit; a protected tree removal is $141.

Simplify Scotts Valley permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Scotts Valley sooner?

Let Alliance prepare, file, and track your Scotts Valley permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Scotts Valley permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.