Skip to main content

Modoc County, California Building Permit Guide

To get a building permit in Modoc County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Modoc County Building & Safety, at 203 West 4th Street in Alturas, issues building permits for the unincorporated county; the City of Alturas, the county’s only incorporated city, runs its own building office.

Authority: Modoc County Building & SafetyCode: Ordinance 221-J (Title 15)Phone: 530-233-6406
Covers
Unincorporated countyAlturas permits itself
Hours
Mon–Thu 9–5Closed Friday to Sunday
Well and septic
Installed and finaled firstPolicy M-008, since Nov 5, 2026
Owner-built homes
LDRD optionOrdinance 364, three inspections

In unincorporated Modoc County, building permits come from the county’s Building & Safety Department at 203 West 4th Street, Alturas (530-233-6406), led by Interim Chief Building Official Scott Ward; the office is open Monday to Thursday and asks visitors to call for an appointment. Inside Alturas, the City of Alturas issues its own permits. Since November 5, 2026, county policy holds back any permit on land without sewer or water service until the well and septic system are installed and finaled by Environmental Health, and owner-builders can choose the county’s Limited Density Rural Dwelling standards instead of the full residential code.

What requires a building permit in Modoc County?

Building & Safety issues residential, commercial and industrial permits under Title 15 of the county code, which adopts the state codes with the county’s own administrative changes. The county’s written policies settle several common questions. Replacing a whole window or sliding door, including the frame, needs a permit when the weather seal or flashing is removed, as does enlarging an opening or cutting a new one; replacing broken glass in an existing frame, or setting a vinyl insert into an intact frame without disturbing the weather seal, needs none.

Permit required

  • New homes, additions, ADUs and commercial or industrial buildings
  • Manufactured homes on permanent foundations and retrofit foundation systems
  • Full window and sliding door replacements, and new or larger openings
  • Shipping containers used for residential storage
  • Re-roofs, residential and ground-mounted solar, electrical work
  • Grading related to building construction (Appendix J as adopted by the county)

No permit under county policy

  • Replacing broken or damaged glass in an existing window frame
  • A vinyl window insert that leaves the old frame and weather seal in place
  • Other exemptions follow the state code’s list; ask Building & Safety before starting

A house must have at least 600 square feet of gross floor area, which can include a finished loft of 70 square feet or more reached by a code-compliant stair rather than a ladder. Shipping containers on residential parcels need an existing permitted house or an issued house permit, may be no larger than 400 square feet each, and are limited to one on parcels under an acre and two on parcels of one to five acres; containers visible from a road must be painted in earth tones.

What the county decides and what the state holds

Ordinance 221-J adopts each part of Title 24 together with all later editions, so the current state code applies automatically, while the county sets permit expiration, refunds, fees and the Limited Density Rural Dwelling rules. Fire hazard zones, contractor licensing and the building standards themselves are state matters.

Modoc County building department: who handles permitting

Building & Safety handles plan review, permit issuance, inspections and code enforcement for the unincorporated county, and also answers questions about permit histories. Planning, Environmental Health and the Road Department review the same applications for zoning, septic and wells, and county road access. Alturas is the only incorporated city in Modoc County, so an address outside the Alturas city limits, including Cedarville, Adin, Canby, Likely, Fort Bidwell and the other communities, is in the county’s jurisdiction; the Planning Department can confirm a parcel’s status and zoning.

Short on time to read all of this?

Get a free quote →
Modoc County permit contacts
DetailInformation
Building & Safety203 West 4th Street, Alturas, CA 96101; 530-233-6406; fax 530-233-6420; call for an appointment
HoursMonday to Thursday, 9:00 a.m. to 5:00 p.m., closed noon to 1:00 p.m.; closed Friday to Sunday
Interim Chief Building OfficialScott Ward
Planning DepartmentInterim Planning Director Sean Curtis; 203 W 4th Street; 530-233-6406; Monday to Thursday, 8:00 a.m. to 5:00 p.m.
Environmental HealthDirector Chris Murray; 202 West 4th Street; 530-233-6310; Monday to Thursday, 7:00 a.m. to 5:00 p.m.
Road DepartmentEncroachment permits; 202 West 4th Street, Suite 100; 530-233-6412

Some county forms, including the building permit application and the foundation-only acknowledgment, still print 530-233-6413; the Building & Safety page gives 530-233-6406.

City and county permit offices in Modoc County
PlaceWho issues building permits
City of AlturasCity of Alturas Building & Safety, 200 W. North Street, 530-233-2512 (city page)
Everywhere else (unincorporated county)Modoc County Building & Safety

Modoc County permit types

The county posts a building permit application, an electrical application, residential and ground-mounted solar requirements, an alternative energy checklist, a conventional wood-frame permit packet, a new manufactured home packet and a retrofit foundation application, and it links an online application portal from the Building & Safety page.

Residential permits

  • Two ways to build a house: under the California Residential Code, or as an owner-built Limited Density Rural Dwelling under Ordinance 364 (Title 15, Chapter 6). LDRD plans are not reviewed or inspected for wind, earthquake, snow load or frost heave, fire sprinklers, solar and energy code compliance are optional, a notarized notice is recorded on the deed, and the home may be sold, leased or rented one year after the certificate of occupancy.
  • Conventional framing: owners, contractors or drafters may prepare plans for one-story buildings and homes up to two stories that meet the conventional wood-framing rules; other designs need a California-licensed architect or engineer. Mass-produced plans must be built as drawn, and any change has to be redrawn.
  • Pre-approved plans: the county has 600- and 1,000-square-foot house plans; the full sets are at the Building Department, with copying fees.
  • Foundation-only permits: allow underground utilities, foundations and slabs before full approval, at the owner’s risk; work must start within 180 days, and the main plan check application still expires one year after filing.
  • Contractor self-certifications: licensed contractors can self-certify re-roofing, exterior wall sheathing, drywall and insulation on county forms.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial and industrial buildings are permitted by the same department and routed to Environmental Health, Cal Fire or Public Works as needed. New commercial buildings in a Fire Hazard Severity Zone must meet the Wildland-Urban Interface Code, with Cal Fire as lead reviewer in the State Responsibility Area. Plans that depart from conventional framing must be prepared by a California-licensed architect or engineer.

What comes before the building permit

  • Well and septic: where no utility district provides sewer or water, the well and septic system must be installed and approved by Environmental Health before Building & Safety will issue the permit (Policy M-008), unless the Building Official grants an exception for a licensed contractor in special circumstances.
  • Fire hazard review: most of the unincorporated county is in the State Responsibility Area, where Cal Fire reviews and conditions new homes, ADUs, commercial buildings and accessory structures within 50 feet of a home, and no final inspection is scheduled until Cal Fire signs off. Local Responsibility Areas in Fort Bidwell, Lake City, Eagleville, Cedarville, New Pine Creek, Davis Creek, Likely, Canby, Adin, Lookout and Newell are reviewed by Building & Safety.
  • Planning and addressing: Planning reviews the site plot plan, and new construction needs a physical address request form.
  • County roads: driveways and other work in a county road right-of-way need a Road Department encroachment permit.

Modoc County building permit fees

The Building & Safety fee schedule was set by Resolution 2008-09 on February 11, 2008, and amended by Resolution 2024-32, which the Board of Supervisors passed on June 18, 2024 to add a fee for permit extensions and reinstatements. The county posts an excerpt of the schedule with the 2024 resolution, showing sample unit fees; staff calculate the building permit fee for each project after plan review.

Modoc County building fees (Resolutions 2008-09 and 2024-32)
ItemFee
Building permit extension or reinstatement$45.80 per request
Planning review of a building application (where required)$55
Private swimming pool / private spa$60.75 / $30.25
Public pool / public spa$91.25 / $60.75
Gas piping system, one to five outlets$6.15
Backflow devices, one to five$12.30
Other appliance under the mechanical code$10.65

Rather talk it over?

Call 1-855-478-4290 →
Environmental Health fees (Resolution 2017-50, effective January 1, 2018)
ItemFee
New well permit / well repair or modification$90 / $90
Well destruction permitNo fee
Site evaluation for an onsite wastewater system$180
New standard septic system$210
New advanced, sand filter, pressure distribution, graywater or alternative system$420
Minor repair (tank or pump replacement)$135
Major repair, standard leach field$165

Worked example: a rural home on a standard septic system and a new well pays Environmental Health $180 for the site evaluation, $210 for the septic permit and $90 for the well permit, or $480, before the building permit is calculated. Under Ordinance 221-J the Building Official may refund up to 80% of a permit fee when no work has been done and the original permittee asks in writing within a year, and up to 80% of the plan review fee when an application is withdrawn before review starts.

Trade permits and who may pull them in Modoc County

Electrical, plumbing and mechanical work is permitted by Building & Safety; the county has a separate electrical application, and mechanical, gas, backflow and pool items carry unit fees on the county schedule. Ground-mounted solar has its own submittal and inspection checklist. Shipping containers used for storage may have only one 20-amp lighting circuit and one GFCI receptacle, with an exterior disconnect and grounding electrode.

Owners can build their own homes, either to the full residential code or under the LDRD ordinance, which defines an owner-built home as one built by an owner who acts as general contractor or provides the labor for a home to be their principal residence, or one built by a licensed contractor for the people who own the land when construction starts. The self-certification forms for re-roofing, sheathing, drywall and insulation are for contractors only, and the foundation-only acknowledgment asks the contractor for a CSLB license number.

Rather not deal with the Modoc County building department?

Get a free quote →

How to apply for a Modoc County building permit

1. Settle well and septic

Outside a water or sewer district, get Environmental Health permits and have the well and septic installed and finaled first.

2. Check fire hazard status

Look up whether the parcel is in the State or Local Responsibility Area and its Fire Hazard Severity Zone; the county assigns it at application.

3. Choose the code path

Decide between the California Residential Code and the owner-built LDRD standards, and prepare plans to the county checklist.

4. Submit three plan sets

File the application with three sets of plans on sheets at least 11 by 17 inches (one each for you, the assessor and the department), plus the site plot plan and address request.

5. Plan review and routing

The Building Official reviews the plans and routes them to Environmental Health, Cal Fire or Public Works; fees are calculated after review.

6. Pick up the permit

Staff call and email when the permit is ready; pay the fees and keep the approved job copy on site.

Review, corrections and what causes delay

Incomplete checklist items can make plans unacceptable, and an application is treated as abandoned one year after filing unless pursued in good faith, with written extensions of up to 365 days at $45.80 each. Projects in the State Responsibility Area wait for Cal Fire’s conditions, and missing well or septic finals stop issuance entirely. Deferred submittals such as truss calculations, fire sprinklers and solar must be approved before the rough-in inspection.

Modoc County building inspections

Call Building & Safety at 530-233-6406 to arrange inspections. An LDRD home needs at least three: foundation before concrete, a rough or four-way inspection of framing, electrical, mechanical and plumbing before walls are closed, and a final; code-built homes follow the inspection stages on the permit and the county’s single-family final inspection checklist. Smoke and carbon monoxide alarms are confirmed on the county’s declaration form.

A permit expires if work does not start, with an approved inspection, within one year of issuance, or if a year passes without another approved inspection; revisions pursued in good faith extend it by 365 days. An expired permit can be reinstated within five years on written request and the $45.80 fee. In the State Responsibility Area, the final inspection on a new home, ADU, commercial building or nearby accessory structure waits for Cal Fire’s sign-off, and foundations poured without an inspection are handled under the county’s Policy M-002.

California building code in Modoc County

Ordinance 221-J, introduced on July 9, 2024 and adopted by the Board of Supervisors on July 23, 2024, amends Chapter 15.01 of the county code: it adopts the Title 24 parts with all later editions, adds the agricultural building and grading appendices, deletes the state code’s annual-permit sections and replaces the permit expiration, extension, reinstatement and refund rules. FEMA’s Community Status Book lists unincorporated Modoc County (community 060192) as participating in the National Flood Insurance Program, with flood maps effective December 2, 2015.

Want this handled start to finish?

Get a free quote →

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Modoc County permit search and official resources

Building & Safety provides public information on permit histories and construction records; call 530-233-6406 with the address or parcel number. Code complaints can be filed through the county’s online building code complaint portal.

Inspections are where schedules slip.

Get a free quote →

Modoc County building permit FAQs

Does the county issue permits in Alturas?

No. The City of Alturas has its own Building & Safety office; the county covers the rest of Modoc County.

Can I get a building permit before my well and septic are in?

Not on land without water or sewer service: since November 5, 2026 the county issues the permit only after both are installed and finaled, unless the Building Official grants an exception.

What is an LDRD home?

An owner-built rural home under Ordinance 364 that is not reviewed for wind, earthquake, snow or frost loads and needs at least three inspections; sprinklers and solar are optional.

Do I need a permit to replace windows?

Yes if the whole window and frame come out and the weather seal or flashing is disturbed; no for replacement glass or a vinyl insert in the existing frame.

How much does a permit extension cost?

$45.80 per request under Resolution 2024-32, for extensions of up to 365 days or reinstatement of a permit expired less than five years.

Can I put a shipping container on my lot?

With a permit, on a residential parcel that already has a permitted house or an issued house permit: up to 400 square feet each, one per lot under an acre and two on one to five acres.

When is the office open?

Monday to Thursday, 9:00 a.m. to 5:00 p.m., closed at lunch; call 530-233-6406 for an appointment.

Simplify Modoc County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Modoc County sooner?

Let Alliance prepare, file, and track your Modoc County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Modoc County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.