Inside La Verne city limits, building permits come from the city’s Building and Safety Division in the Community Development Department at City Hall, 3660 D Street ((909) 596-8706), open Monday to Thursday. Applications go through the city’s online permit portal after any required Planning approval. Under the FY 2026-27 comprehensive fee schedule, building permit and plan check fees are set at twice the prevailing Los Angeles County fees, and development impact fees are collected when the permit is issued.
What requires a building permit in La Verne?
La Verne’s application guides tell owners to speak with a building clerk or planner before building, because most projects that need Planning approval also need building permits, and some need building permits only. Building and Safety review is a separate step that follows Planning approval where Planning approval is required.
Planning Development Application first
- All new homes, including ADUs and junior ADUs
- Residential additions that Planning finds visible from the street or right of way
- All second-floor additions and balconies
- All exterior remodels that change siding, stucco, stone or other materials
- Non-residential construction and additions, including antenna towers
Over-the-counter Planning sign-off
- Fences and walls on their own Planning form; retaining walls also need a building permit
- Patio covers, pergolas, garages and sheds that Planning finds are not visible from the street
- First-floor additions not visible from the street
- Business signs that meet a master sign program or specific plan
Solar panel systems, certificates of use and occupancy, heritage tree pruning or removal and business licenses each have their own application. A fence or wall permit is a Planning and Public Works review only: the city states that no construction inspection follows and that it is not a building permit.
What La Verne decides and what the state holds
La Verne enforces the statewide code through its own Building and Safety Division and sets its own fees, precise plan review, design rules and impact fees. Its fire department’s Community Risk Reduction Bureau reviews construction plans against the fire, building and health and safety codes, and the city engineer works under contract for public improvement design.
La Verne building department: who handles permitting
The City of La Verne issues building permits for property inside the city. Its Building and Safety Division checks plans, issues permits and inspects structures; the Planning Division handles zoning approvals, which may be issued by the Community Development Director, the Planning Commission or the City Council depending on the project. Eric Scherer is the Director of Community Development.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Community Development Department, La Verne City Hall, 3660 D Street, La Verne, CA 91750 |
| Phone / email | (909) 596-8706 (Planning and Building); building@laverneca.gov |
| Hours | City Hall Monday to Thursday 7:30 a.m. to 5:30 p.m.; Planning counter 7:30 a.m. to noon; building inspector office hours 7:30 to 10:00 a.m.; closed Fridays and weekends |
| Public Works | (909) 596-8741 for water, sewer and right-of-way questions |
| Portal | La Verne online permit portal (building permit applications and records) |
La Verne permit types
Building permit applications and permit records are handled through the online permit portal; commercial solar is filed there as an ordinary building permit. The city also posts a certificate of use and occupancy application, a smoke and carbon monoxide alarm self-certification form, an AB 1236 electric vehicle charger checklist and an unreasonable hardship documentation form.
Residential permits
- Rooftop solar on homes goes through SolarAPP+, for licensed contractors only: start a solar permit in the city portal, complete the automated review (SolarAPP+ charges its own processing fee), then link the approval number back to the city permit before any inspection can be booked. Systems that do not qualify are handled by the Building Department.
- ADUs and junior ADUs need a Planning Development Application with site, floor and colored elevation plans, a utility site plan for La Verne water and sewer, proof of ownership and the expected rent, which is for information only.
- Visible or second-story additions go through precise plan review before building plan check.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
New non-residential buildings and additions need a Planning Development Application. Every construction project also goes through the fire department’s plan check, started at the Building Division counter with a fire application, three copies of the building plans and the application fee; the regular turnaround is 14 business days. A use and occupancy permit is $225 for spaces of 2,000 square feet or more and $125 for smaller ones.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Planning. Talk to a planner first; Development Application fees are paid in person at the Planning counter by cash, check or card.
- Public Works. Materials stored in the right of way or a lane closure need an encroachment permit (Municipal Code 12.08.150 and 12.04.010), and new units need a utility site plan to Public Works specifications.
- HOA. Where a homeowners association applies, its approval is needed before a fence or wall permit is issued.
- Trees. Pruning or removing a heritage tree has its own permit application; the tree removal permit takes a $500 deposit.
La Verne permit fees
La Verne’s FY 2026-27 Comprehensive Fee Schedule, summarized from Resolutions 25-69 and 26-24, took effect July 1, 2026. It sets building permit and plan check base fees at two times the prevailing Los Angeles County fees under Section 107 of County Title 26; projects valued over $10 million can seek a lower multiplier by agreement with Council consent. Percentage add-ons are then applied, and plan check and development review fees cover the first submittal and one revision.
| Item | Fee |
|---|---|
| Building permit and plan check base fees | Two times the Los Angeles County fee |
| Planning fee on new construction, additions and remodels | 5% of the building permit fee (not on mechanical, plumbing, grading, electrical, sewer or occupancy permits) |
| General Plan fee | 4% of the building permit fee |
| Technology fee | 2% of every building permit |
| State green building fee (SB 1473) | $1 per $25,000 of valuation |
| Precise plan review: additions, accessory structures, ADUs | $0.50 per sq ft of new floor area, $75 minimum |
| Residential exterior alteration visible from the street | $50 |
| Fence review | $30, plus building and Public Works fees if needed |
| Records management, single-family work | $55 |
| Fire plan check application | $62; new building architectural review $372 plus $744 or the consultant fee |
| Use and occupancy permit | $225 (2,000 sq ft or more) / $125 |
Rather talk it over?
Call 1-855-478-4290 →Development impact fees. Collected at building permit issuance. Resolution 25-68, adopted November 17, 2025 and effective January 16, 2026, sets residential rates per square foot of $4.67 for city administration, $0.99 police, $1.69 fire, $7.43 parks, $0.32 storm drain and $0.42 undergrounding, adjusted each July 1 by the California Construction Cost Index; the fee schedule applies the storm drain, undergrounding and fire fees to new buildings and to an addition or remodel with a valuation of $75,000. Resolution 26-23, adopted April 20, 2026, sets affordable housing in-lieu fee rates of $20 per square foot of new single-family detached, townhome and condominium construction ($45 for apartments) and linkage fees of $10 (commercial), $15 (office), $20 (institutional) and $25 (industrial) per square foot of new space; the city says these are maximum rates that can be negotiated with the City Manager project by project, so ask which of them apply to your project.
Trade permits and who may pull them in La Verne
Electrical, plumbing, mechanical, grading and sewer permits are issued by the Building and Safety Division alongside the building permit; the 5% planning fee is not charged on them. Residential solar through SolarAPP+ is limited to licensed contractors, and the city’s fence and wall form asks for the state contractor license number and a La Verne business license number. A new La Verne business license application costs $30 to process, with a $10 annual renewal. For owner-builder questions on a specific project, ask the Building Department at (909) 596-8706.
How to apply for a La Verne building permit
Call (909) 596-8706 or visit the Planning counter to learn whether the project needs a Development Application or an over-the-counter sign-off.
File the Development Application and the matching guide, checklist and fees in person, and wait for the approval.
Start the building permit application online and upload the plans approved by Planning.
Complete the fire application at the Building Division counter with three plan copies and the $62 fee.
Building fees, percentage add-ons and any development impact fees are due when the permit is issued.
Schedule inspections in the portal or by phone, Monday to Thursday.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
Plan check and development review fees pay for the first submittal and one revision only. Fire plan check runs 14 business days from submittal, reviewed by a city consultant or the Fire Marshal, and approved plans must be picked up with the consultant’s and Community Risk Reduction Bureau’s stamps. The city’s guides ask applicants to confirm the right application with a planner before filing and to submit only the plan sheets the planner asks for, since the Development Application is routed to fire, police, Public Works and other departments for comment.
Inspections in La Verne
Inspections are scheduled through the online permit portal or by calling (909) 596-8706, and are available Monday to Thursday only; the office is closed every Friday. To reach a building inspector in person, use the inspector office hours, 7:30 to 10:00 a.m. Monday to Thursday. For SolarAPP+ jobs, the approval number must be linked to the city permit before an inspection can be requested.
The fire department’s Community Risk Reduction Bureau inspects fire-related work. Applicants have 6 months after fire plan approval to finish the work and schedule that inspection, the fire permit fee includes up to three inspections, and the building inspector will not final a project until the bureau has inspected it.
California building code in La Verne
La Verne’s building fees are tied to Section 107 of the Los Angeles County Building Code, and its fire plan check reviews projects against the California Fire Code, Building Code and Health and Safety Code. FEMA’s Community Status Book lists La Verne (community 060133) as participating in the National Flood Insurance Program, with no special flood hazard area mapped in the city.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
La Verne building permit FAQ
Who issues building permits in La Verne?
The city’s Building and Safety Division in the Community Development Department, at City Hall, 3660 D Street, reachable at (909) 596-8706.
Want this handled start to finish?
Get a free quote →How are La Verne building permit fees calculated?
The base building permit and plan check fees are twice the current Los Angeles County fees, plus a 5% planning fee on new construction, additions and remodels, a 4% General Plan fee and a 2% technology fee.
Do I need Planning approval for an addition?
Yes if the addition is on a second floor or visible from the street; those need a Development Application, with precise plan review at $0.50 per square foot. First-floor additions Planning finds are not visible can be signed off over the counter.
Do I need a permit for a fence?
A fence or wall needs a Planning fence/wall permit ($30 review) with Public Works sign-off, but it is not a building permit and is not inspected. Retaining walls also need a building permit.
How do I get a solar permit?
Licensed contractors submit eligible home systems through SolarAPP+ from the city portal, then link the approval to the city permit to book inspections. Commercial systems are filed as building permits.
What impact fees apply to a new home?
Under Resolution 25-68 the residential development impact fees total $15.52 per square foot across six categories, adjusted each July 1 and collected at permit issuance. Affordable housing fees under Resolution 26-23 are separate maximum rates; ask the city whether they apply.
Is the office open on Fridays?
No. City Hall, the Planning counter and inspections run Monday to Thursday.
La Verne permit search and official resources
The city’s online permit portal holds both building permit applications and permit records, and the Community Development documents page posts the city’s monthly building activity reports (January through September 2026 were online in November 2026).
Inspections are where schedules slip.
Get a free quote →- Community Development Department
- La Verne online permit portal
- Permits page
- Residential solar building permits (SolarAPP+)
- Planning applications
- Precise plan review application guide (PDF)
- ADU application guide (PDF)
- Fence and wall permit application (PDF)
- Certificate of use and occupancy application (PDF)
- FY 2026-27 comprehensive fee schedule (PDF)
- Development impact fees
- Resolution 25-68, development impact fees (PDF)
- Resolution 26-23, affordable housing fees (PDF)
- Community Development documents and building activity reports
Simplify La Verne permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in La Verne sooner?
Let Alliance prepare, file, and track your La Verne permits while your crew stays on the job.
More California permitting guides
Los Angeles County
Read guide →Lawndale
Read guide →Lomita
Read guide →Lafayette Building Permit Guide
Read guide →Laguna Beach Building Permit Guide
Read guide →Laguna Hills Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about La Verne permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.