Building permits in Lafayette are a two-step job. The City of Lafayette’s Planning & Building Department (3675 Mount Diablo Boulevard, Suite 210; (925) 284-1976) first does an online zoning plan check in its GeoCivix portal and collects development impact fees; then the Contra Costa County Building Inspection Department, which the City contracts for building plan check and inspection, reviews the plans, issues the permit and inspects the work at County fees (30 Muir Road, Martinez; (925) 655-2700). The City requires no business license.
What requires a building permit in Lafayette?
Because building permits are County permits in Lafayette, the building permit rules and the County’s own exemptions come from the Contra Costa County Building Inspection Department; the City posts a handout on work exempt from a building permit or planning review. What the City itself decides is which permit jobs must first pass its zoning plan check. Most do, but the Planning Department lists jobs that can go straight to the County.
No City zoning plan check
- Termite or dry-rot repair that adds no floor area and no plumbing fixtures, including rough-ins
- Electrical or gas repair or replacement with no added meters
- New, repaired or replaced HVAC equipment, water heaters and pool or spa equipment at a single-family home
- Foundation repair or seismic upgrades that add no floor area or bulk; repairs to existing pools and spas
- Interior remodels such as bathrooms that add no conditioned space
- In-kind window replacement; residential re-roofs under 5,000 square feet (50 squares)
- Flush-mounted rooftop solar of 10 kW AC or 30 kW thermal or less on a detached house or duplex, within the height limit
City zoning plan check still needed
- Kitchens, and any area with kitchen-like plumbing such as a wet bar, because the number of kitchens bears on the number of dwelling units
- New windows and skylights
- Any job that needs a construction and demolition Waste Management Plan, even if listed as exempt
- Other permit projects not on the exempt list, such as additions, new homes and ADUs
Residential re-roofs under 5,000 square feet also need no construction and demolition debris recycling plan.
What Lafayette decides and what the County and state hold
Lafayette writes and applies its own zoning code, General Plan and Downtown Specific Plan, decides discretionary approvals such as design review and hillside development permits (through staff, the Zoning Administrator and the Planning and Design Review Commissions), and sets development impact fees for parkland and park facilities, drainage, walkways and Lamorinda transportation. Building plan check, building permits and inspections are the County’s job under the City’s contract, at County fees. Sewer approvals belong to the Central Contra Costa Sanitary District and fire review to the Contra Costa County Fire Protection District.
Short on time to read all of this?
Get a free quote →Lafayette building department: who handles permitting
The City of Lafayette contracts with Contra Costa County for building inspection services: the County Building Inspection Department, part of the County’s Department of Conservation and Development, performs building plan check and inspection and issues the permit. The City’s Planning & Building Department handles planning, zoning, design review and environmental review, and its Code Enforcement staff enforce the zoning code. The department processes development applications, administers the zoning code, supports the Planning Commission and Design Review Commission, and checks projects for compliance with the California Environmental Quality Act. Greg Wolff is the Planning Director. The County’s wider permit rules are in our Contra Costa County building permit guide.
| Office | Details |
|---|---|
| City of Lafayette Planning Department | 3675 Mount Diablo Blvd., Suite 210, Lafayette, CA 94549; (925) 284-1976; planner@lovelafayette.org |
| Planner on duty | Calls Monday–Thursday, 8 a.m. to 5 p.m.; closed to the public on Fridays |
| Planning counter | Zoom Wednesday 9–11 a.m. and 1–3 p.m. (no appointment); in person Thursday, same hours, by appointment |
| Contra Costa County Building Department | 30 Muir Road, Martinez, CA 94553; (925) 655-2700; permits@dcd.cccounty.us |
| City Engineering (stormwater plans) | 925-299-3247 |
| City Offices main line | (925) 284-1968; cityhall@lovelafayette.org |
Lafayette permit types
A Lafayette project can involve three kinds of approval: a City discretionary planning permit where the zoning code calls for one, the City’s ministerial zoning plan check, and the County building permit. Electrical, plumbing and mechanical work is permitted by the County alongside the building work; many like-for-like trade jobs skip the City step, as the list above shows.
Residential permits
- Additions, remodels and new homes. The City zoning check needs a complete set of architectural plans with a site plan, floor plans and elevations.
- ADUs. The same plans plus a title report prepared within the last six months; the City has its own ADU and SB 9 lot split pages.
- New housing. Applicants for new housing projects may ask for the optional post-entitlement permit process under AB 2234, which usually brings shorter County review times; nothing may be outstanding that would hold issuance, and staff must finish all required items before Planning stamps the construction drawings.
- Stormwater facilities. Properties with stormwater control facilities need annual inspections, handled by a “Stormwater Permit” request (see below).
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
A new or relocated business must fit the zoning for its location: the City’s downtown zoning map, zoning district rules, activity classifications and zoning table show where a use is allowed and where it needs a land use permit, the parking ordinance sets required spaces, and the sign ordinance says when a sign permit is needed. Tenant improvements then follow the same zoning check and County building permit path. For any project, a staff planner can fill in the City’s Planning Project Checklist, a short form that lists the rules likely to apply and the triggers for discretionary review; it gives an overview only and is not an approval.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Discretionary approvals: design review, hillside development permits or a land use permit where required, each with an application processing fee.
- Zoning plan check: through GeoCivix, unless the job is on the exempt list.
- Sanitary district: Central Contra Costa Sanitary District approval where the City’s permit handout calls for it; the applicant collects it.
- Fire district: Contra Costa County Fire Protection District approval where required, also collected by the applicant.
- Development impact fees: paid to the City with the building permit application, before the Planning Department stamps the plans.
Lafayette permit costs and fees
Two sets of fees apply. The County charges the building permit, plan check and inspection fees under its own fee schedule, because it does that work for the City; Lafayette’s pages do not print County amounts and tell applicants to ask the County and other agencies, such as the Central Contra Costa Sanitary District, directly, since their schedules do not overlap with the City’s.
The City collects two kinds of fees of its own:
Rather talk it over?
Call 1-855-478-4290 →- Application processing fees for discretionary applications such as design review and hillside development permits.
- Development impact fees that fund new public infrastructure: parkland, park facilities and park program administration, drainage, walkways and the Lamorinda transportation fee, each backed by a nexus study the City posts.
Both appear in the City’s Planning & Development Fee Schedule. For an estimate, the City offers an Excel fee calculator (the “AR Form”): choose the tab for your project type and enter the project data, and the sheet estimates the development fees, but your project planner sets the final figure. The City accepts cards, cash, checks payable to the “City of Lafayette” and, on request, e-payments with a 2.9% convenience fee.
One County charge is spelled out on the City’s site: the annual stormwater facility inspection carries a $345 fee to the County Department of Conservation and Development, which issues the Stormwater Permit and inspects, while the City Engineering review is free.
Trade permits and who may pull them
Electrical, plumbing, mechanical and gas permits in Lafayette are County building permits, filed in the County ePermits Center like any other building permit. The City’s list lets many of them skip zoning review: electrical or gas repairs without added meters, HVAC work, water heaters and pool or spa equipment at single-family homes. Work is done by a state-licensed contractor in the matching CSLB classification or by an owner-builder on their own property.
Lafayette does not require a business license or business registration, and businesses may operate without one; the City provides a printable letter stating the policy for anyone who needs proof. Fictitious business name filings go to the Contra Costa County Clerk-Recorder’s Office. Any business opening or moving in town must still comply with the zoning rules for its location.
Rather not deal with the building department?
Get a free quote →How to apply for a building permit in Lafayette
Call the planner on duty, email planner@lovelafayette.org or use the Wednesday Zoom counter to learn whether a discretionary permit or zoning check applies.
Register in the City’s GeoCivix portal and upload the site plan, floor plans and elevations (plus a recent title report for an ADU); GeoCivix support is at 1 (844) 848-8667.
Where the City’s handout calls for them, collect Central Contra Costa Sanitary District and Contra Costa County Fire Protection District sign-offs.
Development impact fees are paid before the Planning Department stamps the drawings.
Upload the City-stamped drawings, formatted to 24 by 36 inches, to the County; it accepts only digital building permit submittals and takes appointments for in-person help.
Answer County corrections, pay County fees, receive the permit and book County inspections.
Review, corrections and what causes delay
The City’s step comes first: the County filing is made with the drawings the City has stamped. Plans in the wrong sheet size are not accepted by the County, and the applicant, not the City, is responsible for collecting any sanitary and fire district approvals. A project is judged under the regulations in effect when its application is submitted and deemed complete. The Planning Department does not take walk-ins, so book an appointment or use the Zoom counter, and expect emails sent on a Friday to be answered the following week.
Inspections in Lafayette
Building inspections in Lafayette are carried out by Contra Costa County inspectors under the City’s contract and are requested through the County, not City Hall. The County’s booking rules, cut-off times and inspection windows are summarized in the Contra Costa County guide linked above. Questions about a County permit go to permits@dcd.cccounty.us or (925) 655-2700, the contacts the City lists for its contract building department.
Stormwater control facilities built with a project must be inspected every year. Applicants create an idtPlans account and submit a “Stormwater Permit” review request with a digital copy of the stormwater control plans used during construction; if those plans are lost, the Engineering department assistant at 925-299-3247 can help locate them. City Engineering reviews and stamps the plans within about a week, emails the approved set, and the applicant then submits it to the County and schedules the inspection with a County inspector.
California building code in Lafayette
The County Building Inspection Department applies the building code to Lafayette projects as part of its contract, while the City applies its own zoning code, which is part of the Lafayette Municipal Code. FEMA’s Community Status Book lists the City of Lafayette (community 065037) as participating in the National Flood Insurance Program, with flood maps effective March 21, 2017.
Want this handled start to finish?
Get a free quote →California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Lafayette permit search and official resources
Building permit status and history are kept by the County: its Department of Conservation and Development Building Permit Database (Accela Citizen Access, Building tab) covers permits issued from the 1980s to the present and can be searched by address, permit number or licensed contractor, and the County takes a Records Research Request form for copies. The City asks that its own public records requests be made in writing by email to the City Clerk, and plans can be copied only with permission from the owner and any licensed professional who prepared them.
- Lafayette Planning & Building Department
- Building permits in Lafayette: zoning check and County steps
- Planning and development fees
- GeoCivix zoning plan check portal
- Contra Costa County ePermits and building permit database
- Starting a business in Lafayette (no business license)
- City of Lafayette contacts
- FEMA Community Status Book, California
Lafayette building permit FAQs
Inspections are where schedules slip.
Get a free quote →Who issues building permits in Lafayette?
Contra Costa County’s Building Inspection Department, under contract with the City, after the City’s own zoning plan check.
Does a re-roof need City review?
A residential re-roof under 5,000 square feet skips the City zoning check and needs no debris recycling plan, but it is still a County permit.
Can I walk in to the Planning counter?
No. Use the Zoom counter on Wednesdays, book a Thursday in-person slot, call the duty planner or email.
Does Lafayette require a business license?
No. The City requires no business license or registration.
When are impact fees paid?
With the building permit application, before the Planning Department stamps the plans for the County.
What plan size does the County accept?
Digital plans formatted to 24 by 36 inches, uploaded to the County ePermits Center.
How do I look up an old permit?
Search the County’s building permit database, which covers permits from the 1980s on, or send the County a records research request.
Is there a faster County review for new housing?
New housing projects may request the optional AB 2234 post-entitlement permit process, which usually has shorter County review times when nothing is outstanding.
What does the yearly stormwater facility inspection cost?
The City Engineering review is free; the County charges $345 for the Stormwater Permit and inspection.
Simplify Lafayette permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Lafayette sooner?
Let Alliance prepare, file, and track your Lafayette permits while your crew stays on the job.
More California permitting guides
Contra Costa County
Read guide →Martinez
Read guide →Moraga
Read guide →Laguna Beach Building Permit Guide
Read guide →Laguna Hills Building Permit Guide
Read guide →Laguna Niguel Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Lafayette permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.