Inside the City of King, building, electrical, plumbing and mechanical permits come from the Building & Safety Department at City Hall, 212 S. Vanderhurst Avenue, where Mark McClain is the Chief Building Official. Applications, uploads, payments and inspection requests run through the city’s Citizenserve portal, and permits are issued by appointment (831-386-5925). Building fees follow the master fee schedule effective January 15, 2025, which adds $16,255.06 in impact fees to a new single-family house.
What requires a building permit in King City?
The department’s brochure says that, with few exceptions, a permit is needed whenever a structure is erected, built, enlarged, altered, repaired, moved, improved, removed, converted or demolished. The city’s FAQ adds that replacing or installing a roof, a water heater or a furnace needs a building permit, as does any ADU. Its handout of work exempt from permits includes:
No permit (city handout)
- One-story detached sheds and playhouses under 120 square feet with no utilities
- Fences under 6 feet and retaining walls under 4 feet with no surcharge
- Platforms, walks and driveways no more than 30 inches above grade and not part of an accessible route
- Window replacements that leave the frame unaltered, and awnings projecting up to 54 inches
- Repair or overlay of under 25% of a roof in any 12-month period
- Painting, flooring, cabinets, counters and decorative tile
- Above-ground prefabricated pools under 24 inches deep and up to 5,000 gallons
Still needs a permit
- Replacing a main electrical disconnect
- Replacing drain, water, waste or vent piping
- Repairs that move or replace valves, pipes or fixtures
- Emergency repairs: the application is due the next business day
- Exempt work may still need Planning clearance
Street trees in the public right-of-way may only be removed with city approval under Chapter 13.10 of the municipal code, and any pruning or other work in the right-of-way needs an encroachment permit; trees on private land need no city approval. Driveway aprons and public sidewalk repairs are handled by Public Works.
What King City decides and what the state holds
King City’s building department is created by Title 12 of its municipal code, which also holds the city’s construction and demolition recycling rule (section 12.04.090). The city sets its own fees by master fee schedule, its development impact fees, its ADU standards in Title 17.47 and its business license rules in Title 5. Contractor licensing belongs to the state.
King City building department: who handles permitting
The Building & Safety Department handles plan review, permit issuance, inspections, building code enforcement, certificates of occupancy and building addresses inside the city limits. Its brochure splits the work with the Community Development Department: Planning decides what use and size of building a lot allows (density, height, setbacks, parking, landscaping), and Building & Safety covers structure, life safety, trade permits, energy standards and accessibility. Land outside the city limits is unincorporated Monterey County, permitted by the county’s Housing and Community Development department.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building & Safety Department, City Hall, 212 S. Vanderhurst Avenue, King City, CA 93930 |
| Hours | Monday to Friday, 9 a.m. to 5 p.m. |
| Building counter and appointments | 831-386-5925 (appointments required for permit issuance) |
| Chief Building Official | Mark McClain, 831-386-5915 |
| City Hall main line and payments | 831-385-3281 |
| Planning questions | 831-386-5924 |
| Online | Citizenserve portal: applications, uploads, payments, inspections and status |
King City permit types
In Citizenserve, choose Building Permit for building, electrical, plumbing and mechanical work; planning applications such as conditional use permits are filed under Planning. Small jobs such as water heaters and re-roofs can often be issued over the counter, while larger projects go to plan check. The forms page carries the smoke and carbon monoxide alarm affidavit, a request for alternate materials or methods, the application and permit extension request, the unreasonable hardship form for accessibility upgrades to existing commercial buildings, an expedited checklist for EV charging stations and an installation certificate.
Residential permits
- ADUs need a building permit and must match the design of the main house. The city offers four pre-approved detached ADU plans (1A, 1B, 2A and 2B) free of charge; owners using them sign the pre-approved ADU hold harmless statement. Standards are in Title 17.47 of the municipal code.
- Solar: residential systems up to 15 kW have a flat permit fee, and the department’s page links SolarAPP+.
- Re-roofs, water heaters and furnaces need a permit; small jobs of this kind are often issued at the counter.
- Fences: the master fee schedule lists a $330 Planning fence permit for fences above 3 feet, and fences or walls over 6 feet also need a building permit priced on valuation.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
The commercial submittal checklist asks for plans stamped and signed by the architect and structural engineer of record: site plan with parking, accessible route, utilities, fire hydrants, street trees and landscape; architectural, structural, plumbing (with sewer fixture units), mechanical and electrical plans; fire department items such as extinguisher, alarm panel and sprinkler riser locations; and two sets of the soils report, structural calculations and energy forms, plus the soils engineer’s letter confirming the foundation design. The checklist still calls for seven paper sets, while the review flow chart has supporting documents uploaded to Citizenserve; ask the counter which applies. Commercial fire sprinkler, alarm, hood and fire pump permits are priced separately.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning compliance. Front-desk staff check the scope with Planning, which decides whether a conditional use permit, architectural review or plot plan review is needed. The building application follows once Planning clearance is given.
- Pre-application. Larger projects can book a pre-application review ($1,650).
- Right-of-way. Work in the street or on curbs, sidewalks and driveways needs a Public Works encroachment permit.
- Recycling plan. Building and demolition permits need a construction and demolition waste reduction and recycling plan before issuance.
King City permit costs and fees
King City’s master fee schedule, effective January 15, 2025, prices building permits and plan check on valuation using Table 3-A of the 1997 building code; the schedule names the table but does not print its figures, so ask the counter for the calculation. Plan check fees are collected when plans are submitted and permit fees when the permit is issued. Public Works staff time is billed at actual cost plus a 5% administrative fee.
| Item | Fee |
|---|---|
| Minimum permit fee / permit issuance fee | $110 / $110 |
| Building permit and plan check | Valuation, 1997 Table 3-A |
| Building permit training surcharge | $16.80 |
| Minor building, electrical or plumbing permit | $66 |
| Residential solar up to 15 kW | $497, plus $16.80 per kW above 15 |
| Commercial solar up to 50 kW | $1,102 |
| Re-roof: built-up, shingle or shake / tile or metal | $188 / $314 |
| Certificate of occupancy | $198 |
| Demolition permit | Actual cost, $150 deposit |
| Waste reduction and recycling plan | $138 per building |
| Landscape water efficiency review | $144 |
| Residential fire sprinkler / fire alarm | $290 / $173, up to two inspections |
| Fence permit above 3 feet (Planning) | $330 |
| General encroachment permit | $414 |
Rather talk it over?
Call 1-855-478-4290 →New homes also pay development impact fees. For projects vested after August 21, 2010, a single-family house pays $16,255.06 in total: $4,523.50 for the wastewater treatment plant, $2,463.03 for wastewater collection, $2,872.07 for streets, bridges and signals, $1,661.75 for parks and open space, $1,321.50 for storm drainage, $946.50 for public meeting facilities, $847.64 for law enforcement, $693.57 for fire protection, $582.50 for general government and $343 for the aquatic center. A multifamily unit pays $10,981.32, and commercial space $6.56 a square foot.
Planning fees in the same schedule include architectural review of a new project at $1,764, a minor plot plan review (interior) at $440 and a major one (construction) at $1,985, a minor conditional use permit at $1,100, a home occupation permit at $166 and a permanent sign at $330. A curb, sidewalk or driveway review is billed at actual cost on a $300 deposit. Card payments carry a 1.56% plus 10-cent convenience fee on amounts over $500, and American Express is not accepted.
Trade permits and who may pull them
Electrical, plumbing and mechanical permits are issued by Building & Safety on the same application as building permits, with a $66 fee for minor building, electrical and plumbing permits. The department’s brochure says permits are issued to the property owner, a licensed contractor or a certified agent of the owner, and the application carries the state licensed-contractor and owner-builder declarations.
- City business license. Under section 5.12.010 of the municipal code, nobody may carry on a business in the city without a business license, and the FAQ names contractors, consultants and vendors. Licenses run for the calendar year, but contractors may buy quarterly licenses. Processing takes 7 to 10 business days after payment.
- Contractor checks. The brochure asks that contractors and every subcontractor hold a current King City business license and a bond, and that contractors carry workers’ compensation.
- Fixed businesses. A business located in the city first sends the zoning clearance form and building questionnaire to the business license inbox; the license application follows once those are approved.
Rather not deal with the King City building department?
Get a free quote →How to apply for a King City building permit
Discuss the scope at the building counter or by phone at 831-386-5925; staff check it with Planning.
Complete any conditional use permit, architectural review or plot plan review that Planning requires.
Create an account, choose Building Permit and enter the project information.
Attach plans, calculations, energy forms and the recycling plan; for an ADU, name the pre-approved plan if you use one.
Upload revisions to Citizenserve for the Project Review Committee’s next review.
Pay outstanding fees online, at City Hall or by phone, then make the appointment required for permit issuance.
Review, corrections and what causes delay
Plans may be routed to the Project Review Committee for a plan check period of two weeks, and the city gives application status updates weekly on Tuesdays during the committee’s meeting. ADU applicants get first review comments within two weeks, with the same period for resubmittals. Starting work before the permit brings a stop work order, extra fees and possibly uncovering work for inspection.
Inspections in King City
Inspections are done between 8 a.m. and 5 p.m., Monday through Thursday; other days and times are by special request and may carry a special inspection fee. Requests made before 4 p.m. are normally inspected the next day. Request inspections in Citizenserve, by phone, at the counter, by fax or by email.
- The application states that a permit is void if work does not start within 180 days of issue or stops with no inspection requested for more than 180 days. The department’s older brochure describes a one-year permit life with one 180-day extension; extensions are requested on the city’s application and permit extension form.
- At final inspection, give the inspector the construction and demolition waste reduction and recycling report with weight tickets and receipts: the city requires at least 65% of construction and demolition debris and 100% of inert materials to be diverted, and a missing report can delay the final or the certificate of occupancy.
- No building may be used or occupied, and no occupancy may change, until the building official issues a certificate of occupancy ($198).
California building code in King City
The city’s FAQ points to Chapter 12 of the King City Municipal Code, published on eCode360, for its building code, and Title 12 creates the building department; the department also lists the preservation of the historic downtown and its buildings among its aims. FEMA’s Community Status Book lists King City (community 060199) as participating in the National Flood Insurance Program, with a current flood map dated April 2, 2009.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Want this handled start to finish?
Get a free quote →King City building permit FAQs
Who issues building permits in King City?
The city’s Building & Safety Department at City Hall, 212 S. Vanderhurst Avenue, for property inside the city limits.
How do I apply?
Through the Citizenserve portal under Building Permit; you can also visit the counter, but appointments are requested and required for issuance.
How long does plan check take?
The review flow chart gives a two-week plan check period, with weekly status updates on Tuesdays.
Do I need a permit for a new roof or water heater?
Yes. The city’s FAQ says roof replacement and water heater or furnace replacement need a building permit; only repairs under 25% of a roof in 12 months are exempt.
What impact fees does a new house pay?
$16,255.06 per single-family house vested after August 21, 2010, under the January 2025 master fee schedule.
Are there free ADU plans?
Yes. Four pre-approved detached ADU plans are posted at no charge, used with a hold harmless statement.
When are inspections done?
Monday through Thursday, 8 a.m. to 5 p.m.; requests before 4 p.m. are normally inspected the next day.
Do contractors need a King City business license?
Yes. The municipal code requires a business license to do business in the city, and contractors can choose quarterly licenses.
King City permit search and official resources
Permit status for current applications is in Citizenserve. For the permit history of a property, file the Building Department’s property inquiry application ($71.40) with the property address and parcel number; Community Development lists a separate records research fee of $330. Other public records go to the City Clerk at City Hall on the city’s request form.
Inspections are where schedules slip.
Get a free quote →- King City Building & Safety Department
- Citizenserve permit portal
- How do I... (permits, ADUs, business licenses, trees)
- Work exempt from permit
- Building permit application
- Application and permit extension request
- Building Department FAQ brochure
- Building permit review process flow chart
- Submittal checklist for new commercial construction
- Construction and demolition diversion requirements
- Pre-approved ADU hold harmless statement
- Property inquiry application
- Documents and forms
- Taxes and fees
- Master fee schedule (effective Jan. 15, 2025)
- California Building Standards Code (Title 24)
- FEMA Community Status Book, California
Simplify King City permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in King City sooner?
Let Alliance prepare, file, and track your King City permits while your crew stays on the job.
More California permitting guides
Monterey County
Read guide →Marina
Read guide →Monterey
Read guide →Kings County Building Permit Guide
Read guide →Kingsburg Building Permit Guide
Read guide →La Canada Flintridge Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about King City permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.