Kerman, California Building Permit Guide

To get a building permit in Kerman, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Kerman’s Building Division, part of the Community Development Department at 850 S Madera Avenue, checks plans, issues building and trade permits and inspects work inside the city; applications with plans go in by email.

Authority: Kerman Building DivisionFiling: Email application and plansPhone: 559-550-0829
Authority
City Building Division850 S Madera Avenue, Kerman
Inspections
Mon, Wed, FriCall by 4 p.m. the day before
Re-roof fee
$132 for a housePlus $75 processing (proposed 2026-27)
Contractors
Kerman business licenseNeeded at permit issuance

Inside the City of Kerman, building permits come from the Building Division of the Community Development Department, 850 S Madera Avenue (559-550-0829, Monday to Friday, 8 a.m. to 5 p.m.). The division reviews plans, issues building, electrical, plumbing and mechanical permits and inspects the work on Mondays, Wednesdays and Fridays. Applications that include plans or calculations are emailed to the division, and every contractor needs a Kerman business license before a permit is issued. The city’s posted 2026-27 fee schedule, which shows proposed amounts for July 1, 2026, starts at $181 for work valued up to $2,000, plus a $75 processing fee.

What requires a building permit in Kerman?

The Building Division’s rule is broad: a permit is needed whenever a building or structure, or any electrical, plumbing or mechanical system, is built, enlarged, altered, repaired, moved, removed, converted or demolished. New construction and major remodels normally need plans drawn by a design professional. The city’s forms and fee schedule show the jobs it permits most often.

Permit required

  • New houses, additions, remodels and commercial tenant improvements
  • Re-roofs, including overlays (no more than two layers in total)
  • Water heater and HVAC change-outs, service panel upgrades, EV chargers, battery storage and generators
  • Roof and ground-mounted solar
  • Pools and spas, pool equipment change-outs and replastering
  • Patio covers, retaining walls, block (CMU) walls and window or sliding-door replacements
  • Demolition, temporary power poles and sewer, water or gas line repairs
  • Fences over 6 feet high

No building permit

  • Fences up to 6 feet high, which the city’s planning FAQ also exempts from zoning setbacks

The city publishes no wider list of exempt work. Call the Building Division before starting anything not on either list.

What Kerman decides and what the state holds

Kerman sets its own fees, business license rules, zoning (Title 17, rewritten by Ordinance 24-01) and encroachment rules, and runs a construction and demolition recycling program to meet the CALGreen waste rules. The city links its municipal code, including its building and construction ordinances, from the Building Division page. Contractor licensing belongs to the state: the application asks for a CSLB license number and class, and the city adds its own business license on top.

Kerman building department: who handles permitting

The City of Kerman issues its own permits. The Community Development Department, headed by Community Development Director David Brletic, has four divisions: Planning, Building, Engineering, and Code Compliance & Enforcement. The Building Division handles plan review, permit issuance and inspections; Planning handles zoning and entitlements; Engineering reviews public and private construction plans. Land outside the city limits is unincorporated Fresno County, where the county issues permits.

Short on time to read all of this?

Get a free quote →
Kerman permit contacts
DetailInformation
OfficeBuilding Division, Community Development Department, 850 S Madera Avenue, Kerman, CA 93630
Phone559-550-0829 (department and inspection requests)
HoursMonday to Friday, 8 a.m. to 5 p.m.
Application emailbuildingonline@cityofkerman.gov (required for submissions with plans or calculations)
Department headDavid Brletic, Community Development Director

Kerman permit types

Most work starts on the city’s two-page Building Permit Application (revised October 2026). You tick commercial, industrial or residential and the trade involved, describe the work and give square footage, construction type, occupancy group and valuation, which the form defines as the regional fair market value of materials and labor. The owner, contractor, any architect or engineer and one project contact are listed; staff correspond only with that contact. If the owner is not doing the work as an owner-builder, the owner’s written approval of the job must be attached.

Residential permits

  • Re-roofs use their own application, which records the roof type (overlay, tear-off with or without new sheathing), pitch, existing layers (two at most) and underlayment, with contractor and business license numbers.
  • Water heaters and solar. The main form has boxes for like-for-like and tankless water heaters (a tankless unit needs gas or electric load calculations) and for new or revised solar systems and panel upgrades.
  • Patios, plot plans and pools. A standard patio plan, a patio guide and a standard plot plan are posted, and pool work needs the pool barrier acknowledgement form.
  • Additions and alterations also go to Planning for a plan check ($105), and a new house adds a $208 planning plan check.

Commercial permits

Commercial and industrial buildings and tenant improvements use the same application with plans by a registered design professional. The application lists the architect or engineer and their license numbers, and any special inspection reports must be emailed to the Building Division before the final inspection. New non-residential buildings carry a $417 planning plan check.

What comes before the building permit

  • Zoning and site plan review. The Planning Division processes annexations, plan amendments, pre-rezones, conditional use permits, site plan reviews and environmental assessments under Kerman’s zoning code. The seven-member Planning Commission, appointed by the City Council, reviews land use and development proposals and makes recommendations to the council.
  • Plot plan sign-off. The city’s plot plan form is checked by Planning for zoning, setbacks, open space, fence and landscape requirements, and by Engineering for frontage, easements, driveway width and whether an encroachment permit is needed.
  • Encroachment. Driveway approaches, curb, gutter and sidewalk work, utility connections and trench cuts in city streets need a Public Works encroachment permit.
  • ADUs. Kerman offers pre-approved detached ADU plans (see below) and charges a $167 planning review for ADU and junior ADU plans.

Not sure this scope needs a permit?

Get a free quote →

Kerman permit costs and fees

The Building Fee Schedule linked from the Building Division page, also posted as the city’s Fee Schedule 2026/2027, is titled an illustration of current and proposed user and regulatory fees effective July 1, 2026. It lists both columns side by side; the figures below are the proposed amounts, a few dollars above the current ones. The posted copy shows no council resolution adopting the proposed column, so ask the Building Division which figure it charges when you are quoted a fee.

Kerman building fees (proposed column of the posted 2026-27 schedule)
ItemFee
Valuation up to $2,000$181
$2,001 to $25,000$181 for the first $2,000 plus $23.39 per added $1,000
$25,001 to $50,000$719 for the first $25,000 plus $14.36 per added $1,000
$50,001 to $100,000$1,078 for the first $50,000 plus $21.58 per added $1,000
$100,001 to $500,000$2,157 for the first $100,000 plus $7.19 per added $1,000
$500,001 to $1,000,000$5,033 for the first $500,000 plus $5.75 per added $1,000
Over $1,000,000$7,908 for the first $1,000,000 plus $4.03 per added $1,000
Plumbing, electrical and mechanical review on new buildings, additions, TIs and remodels10% of the base permit fee for each trade
Plan review (when it applies)75%; covers the first check and two back checks
Permit processing fee$75
Residential re-roof / HVAC change-out / water heater$132 / $88 / $66
Service panel, EV charger, battery storage or generator (house)$180 each
Residential solar$315 up to 15 kW; above 15 kW $450 plus $15 per kW over 15
Residential pool or spa$629
Demolition$180 house; $359 commercial
Re-inspection (after the first one)$90
Temporary certificate of occupancy$270 per 30 days

Rather talk it over?

Call 1-855-478-4290 →

The flat fees for common jobs already include plan review and inspection, but the $75 processing fee is added, and other departments, technology fees and state fees can apply on top. State fees collected with every permit include the strong motion fee (valuation × 0.00013 for residential, 0.00028 for commercial, $0.50 minimum) and the building standards fee of $1 per $25,000 of valuation. Plan check fees are paid when you apply and are charged in addition to the permit fee; the city bills hourly ($180) for a third or later review.

Worked example from the proposed valuation table: a new house valued at $300,000 has a base permit fee of $2,157 plus 200 × $7.19, or $3,595. Adding 10% of that base for each of plumbing, electrical and mechanical ($359.50 × 3) brings it to $4,673.50, before the 75% plan review, the $208 planning plan check, the $75 processing fee and state fees.

Other rules: a permit extension costs $180; reactivating an expired permit costs 50% of the original base fee within a year and 100% after that; work started without a permit adds an investigation fee equal to the permit fee. Development impact fees and utility charges are not part of this schedule. Planning fees in the same document include $3,126 for a variance and $2,084 for site plan review of one to four homes.

Trade permits and who may pull them

Electrical, plumbing and mechanical work is permitted by the same Building Division on the same application. Stand-alone trade jobs are priced either from the flat-fee list (for example $180 for a residential panel upgrade) or from the trade tables, starting at $181 for work up to $4,000; on a new house or remodel each trade adds 10% of the building permit fee.

  • Licensed contractors. The application asks for the CSLB license number and class. Kerman also requires every contractor working in the city to hold a Kerman business license, current when the permit is issued. For a contractor without a place of business in the city, the proposed 2026-27 schedule lists an $83 application review fee plus the business license tax ($69.98 for a sole proprietor with no employees, $104.12 with one to five employees) and a $4 state fee.
  • Owner-builders. The application has an owner-builder box. The city’s owner-builder notice explains the three ways an owner can act (as worker, as contractor hiring licensed subcontractors, or as employer) and warns that paying unlicensed workers for jobs over $500 makes the owner responsible for payroll taxes and workers’ compensation.
  • Declarations. The re-roof form carries the licensed contractor, workers’ compensation, owner-builder and construction lender declarations that every applicant signs.

Rather not deal with the building department?

Get a free quote →

How to apply for a Kerman building permit

1. Check the property and zoning

Confirm the address is inside the city limits and ask Planning about setbacks, site plan review or a use permit.

2. Prepare plans

New construction and major remodels need plans by a design professional; small jobs can use the city’s standard patio plan and plot plan.

3. Fill in the right form

Use the Building Permit Application or the Re-roof application and list the owner, contractor, designer and project contact.

4. Email the package

Send applications with plans or calculations to buildingonline@cityofkerman.gov, the address printed on the form.

5. Pay plan check and answer corrections

Plan check fees are due at application; the fee covers the first review and two back checks.

6. Get the business license and permit

Contractors need a current Kerman business license before the permit is issued; pay the remaining fees and collect the job card.

Review, corrections and what causes delay

The city’s planning FAQ says small jobs such as a new roof or a new electrical service can be issued the same day, while larger projects usually take two to three months, with referrals to other agencies before issuance. Expedited plan check is offered at $216 an hour (two-hour minimum). Delays usually come from a missing contractor business license, a tankless water heater without load calculations or a missing owner authorization. Changes after submittal go on the addendum application.

Inspections in Kerman

Inspections are required after any building, electrical, plumbing or mechanical permit is issued, and the permit tells you which ones your job needs. Kerman inspects on Monday, Wednesday and Friday. Call 559-550-0829 by 4 p.m. the business day before; a Monday inspection must be booked by 4 p.m. on Friday. Give the job address, permit number, requested date, inspection type and your name and phone number.

  • Keep the permit and job card, the city-approved plans and any earlier correction notices on site, and provide a ladder when one is needed.
  • For a re-roof, a tear-off without new sheathing gets a tear-off and a final inspection; an overlay gets a pre-roof and a final inspection; new sheathing adds a nailing inspection. The ladder must be commercial grade, rated at least 250 pounds, secured and reaching 3 feet above the roof edge, and A-frame ladders are not accepted. You need not be home if the permit is posted in plain view.
  • A re-inspection fee of $90 applies after the first re-inspection, and after-hours inspections cost $216 an hour with a two-hour minimum.
  • Special inspection reports for commercial work must reach the Building Division before the final, and a temporary certificate of occupancy costs $270 for each 30 days.

Kerman ADU plans and other local programs

The City Council approved a pre-approved accessory dwelling unit standard plans program. Residents can choose from three permit-ready detached designs (a studio, a one-bedroom and a two-bedroom unit of 386 to 749 square feet) in Ranch/Early Century, Mediterranean/Mission or Cottage styles. To use them, email the city for the full plan set, then file an ADU building permit application with the site-specific documents; a homeowner’s guide explains each step.

Want this handled start to finish?

Get a free quote →

Kerman’s construction and demolition recycling program applies to residential and commercial projects, with a $180 waste management review fee on the proposed 2026-27 schedule.

California building code in Kerman

Kerman enforces the California Building Standards Code through its Building Division under the municipal code linked from the division’s page. The city’s building pages and forms list no local amendments to the state code.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Kerman building permit FAQs

Who issues building permits in Kerman?

The city’s Building Division at 850 S Madera Avenue (559-550-0829). Fresno County handles addresses outside the city limits.

How do I submit an application?

Email the Building Permit Application with plans or calculations to buildingonline@cityofkerman.gov, the address printed on the form.

How much does a re-roof permit cost?

The city’s proposed 2026-27 schedule lists $132 for a residential re-roof, which includes plan review and inspection, plus the $75 processing fee and state fees.

Do I need a permit for a fence?

Not for a fence up to 6 feet high. A taller fence needs a building permit and must meet setbacks.

When are inspections done?

Mondays, Wednesdays and Fridays. Call by 4 p.m. the business day before, or by 4 p.m. Friday for a Monday inspection.

Does my contractor need a city license?

A state CSLB license plus a Kerman business license, which must be current when the permit is issued.

Are there ready-made ADU plans?

Yes. Kerman offers three pre-approved detached ADU plan sets from 386 to 749 square feet; email the city to get them.

How long does a permit take?

Small jobs can be issued the same day; larger projects usually take two to three months.

Kerman permit records and official resources

The Building Division posts monthly permit reports by year from 2023 on its page. For copies of other city records, the City Clerk’s Office takes requests by email at publicmeeting@cityofkerman.gov, by phone at 559-550-1510 or in person at 850 S Madera Avenue.

Inspections are where schedules slip.

Get a free quote →

Simplify Kerman permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Kerman sooner?

Let Alliance prepare, file, and track your Kerman permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Kerman permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.