In Inyo County, the Building and Safety Department of Public Works issues building, electrical, plumbing and mechanical permits for all unincorporated land, from 301 West Line Street, Suite F, in Bishop (760-873-7857); permit applications can be sent by email to buildingandsafety@inyocounty.us. Under Title 14 of the county code the Public Works Director is the Building Official, every unincorporated area is a snow area and a Wildland-Urban Interface Fire Area, and permit fees are set by Board of Supervisors resolution. The City of Bishop, the county’s only incorporated city, issues its own building permits.
What requires a building permit in unincorporated Inyo County?
The Building and Safety Department publishes a long list of work that needs a permit. It covers every commercial and residential project and many smaller items: sheds, storage containers, patios, porches, decks, water heaters, gas lines, wood and pellet stoves, re-roofs, stucco and siding, windows, insulation and drywall. Title 14 applies to all buildings and structures in the unincorporated county except those exempted by the California Building Code or state or federal law.
Structures
- New construction, additions, alterations and remodels
- Mobile home installation and tiny houses
- Guest houses, garages, workshops, sheds, carports and storage containers
- Patios, porches, sunrooms, decks, and enclosing any of them
- Pools, spas and pool houses; demolition; cell towers and antennas
- Any change to the footprint or roofline, a moved load-bearing wall, or a new door or window opening
Systems and repairs
- Electrical work, temporary power, initial utility set-up and underground utilities
- Plumbing, water heaters, gas lines, backflow devices, sewer laterals and water lines
- HVAC, heaters, hoods, wood or pellet stoves and fireplaces
- Rooftop and ground-mounted solar, fire sprinklers
- Re-roofs, stucco and siding, windows, insulation
- Swapping an electric stove for a gas stove
What Inyo County decides and what the state holds
Ordinance 1255, adopted by the Board of Supervisors on May 12, 2020, replaced Title 14 (the County Building and Safety Ordinance). It adopts every part of the current Title 24 by reference with local amendments justified by snow loads, freezing temperatures, high winds and remote mountain terrain. The amendments set ground snow loads by community, from 20 pounds per square foot in Death Valley, Tecopa and Little Lake to 40 in Bishop, Big Pine and the Alabama Hills, 60 in Starlite and 100 at Aspendell, Bishop Creek, Glacier Lodge and Whitney Portal. Design wind is 85 mph sustained with 110 mph three-second gusts. All unincorporated land is designated a Wildland-Urban Interface Fire Area, and manufactured trusses must be designed by a California-licensed civil or structural engineer, with truss calculations due by the roof sheathing inspection.
Short on time to read all of this?
Get a free quote →Inyo County building department: who handles permitting
Inside unincorporated Inyo County, the Building and Safety Department of Public Works issues permits; Title 14 names the Public Works Director as the county’s Building Official. Engineered designs that go beyond conventional light-frame rules, and all commercial structures with engineering design, can be sent to in-house staff or contract engineering consultants for plan check at the applicant’s cost. The City of Bishop permits and inspects work inside its own limits. To check whether a parcel is in the city or the unincorporated county, use the county’s GIS Data by Parcel or Address maps.
| Office | Handles | Contact |
|---|---|---|
| Building and Safety (Public Works) | Building, electrical, plumbing and mechanical permits, plan check, inspections | 301 W. Line St., Suite F, Bishop; 760-873-7857; buildingandsafety@inyocounty.us |
| Planning Department | Zoning, use permits, variances, subdivisions, environmental review, ADU placement | 168 N. Edwards St., Annex Building, Independence; (760) 878-0263; Mon–Fri 8 a.m.–5 p.m. |
| Environmental Health | Septic systems, wells, food facilities | 760-878-0238 |
| Public Works permits | Encroachments on county roads, oversize loads | 168 N. Edwards, Independence; 760-878-0201; pw.permits@inyocounty.us |
| City | Who issues building permits |
|---|---|
| Bishop (pop. 3,696, Census 2025) | City of Bishop, which issues and inspects about 200 permits a year; inspections are booked at 760-873-8458 |
Inyo County permit types
One county building permit application covers building, plan check, plumbing, mechanical, electrical, demolition, spa, mobile home and solar permits. It asks for the project address and APN, owner and contractor with license number, architect and engineer, a specific project description and the value of the work. The office routes it to Planning, Environmental Health, the fire department, a sewer district or school fee collection where needed, and records any use permit.
Residential permits
- New homes and additions: the plan check list asks for three plan sets on paper at least 18 by 24 inches, a title block with owner, APN and contact, a site plan with distances, structures, street, north arrow and latitude/longitude, a topographic drawing, elevations, Title 24 energy calculations, the sewer system type and tie-in, and electrical, plumbing and HVAC pages. Plans must meet wildland-urban interface standards, and any fire sprinkler plan must be approved by Cal Fire.
- ADUs and pre-approved homes: the county offers free, permit-ready plan sets pre-approved by Building and Safety: studios of 311 and 393 square feet, one-bedroom units of 558 and 586, two-bedroom units of 779 and 819, ADUs over one- or two-car garages, and two three-bedroom houses of about 1,500 square feet. The county says using them saves about half the permit cost because the plans are already checked; Planning answers zoning and placement questions.
- Vacant lots: no electrical connection, septic system or accessory building can be permitted on a lot without a building until the primary structure has a permit; temporary construction power poles are allowed once plans are in and fees paid, for six months at a time.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Every commercial structure with engineering design gets plan check, which may be done by contract engineers at the applicant’s expense. Applications are routed to the fire department and Environmental Health where the project needs their review. Before demolition, grading or any dust-producing work, the application tells you to contact the Great Basin Unified Air Pollution Control District at 760-872-8211. EV charging stations follow the county’s AB 1236 checklist.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning. A pre-application meeting costs a $500 deposit that is credited to a formal application filed within six months; a conditional use permit deposit is $1,490 and a variance $1,500. Projects in Lone Pine that need Architectural Review Board approval pay $200.
- Septic and wells. Title 14 bars a building permit until required sewage and water approvals from other county departments are complete. Environmental Health permits septic systems under its Local Agency Management Plan, which allows a new standard system on lots of at least 15,000 square feet in existing developments or no more than two homes per acre in new ones.
- Floodplain. The Public Works Director is the floodplain administrator and grants floodplain development permits; in Zone A the lowest floor must be at or above the base flood elevation.
- County roads. Materials or work in a county right-of-way need an encroachment permit.
Inyo County permit costs and fees
Title 14 states that building, electrical, plumbing and mechanical permit fees are set by resolution of the Board of Supervisors to recover the program’s cost; the county does not post that resolution on its Building and Safety pages, so ask 760-873-7857 for a quote based on your project value. The application itemizes plan check, each trade permit, the state SMIP and Building Standards fund charges, and separate lines for mobile homes, solar and spas. Fees for other county approvals are published:
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| New conventional septic system (Environmental Health, effective Jan. 1, 2026) | $452 |
| New alternative-design septic system | $634 |
| Leach line repair or replacement / septic tank repair or abandonment | $328 / $94 |
| Domestic or agricultural well / well repair or destruction | $452 / $94 |
| Environmental Health plan check or construction review | $94 an hour |
| Planning pre-application deposit | $500, credited if you file within 6 months |
| Conditional use permit / variance deposit | $1,490 / $1,500 |
| Lot line adjustment / parcel map deposit | $900 / $1,800 |
| County road encroachment permit | $50 minimum, plus fees calculated for each permit |
Environmental Health asks that its permit applications be reviewed by inspection staff before you pay. Where a fire protection district has asked the county to collect a fire mitigation fee under Chapter 14.20, the fee is collected with the building permit for new development in that district. Using one of the county’s pre-approved plan sets cuts roughly 50% from the permit cost.
Trade permits and who may pull them
Electrical, plumbing and mechanical permits are listed on the same county application and priced alongside the building permit. Temporary power for construction is a separate permit, and Title 14 forbids connecting permanent power or propane to a building until it passes final inspection, unless the owner signs a temporary power agreement stating the work is 90% complete, together with a disconnect order.
- Contractors: the application asks for the contractor’s license number and a signed licensed-contractor declaration. California contractors are licensed by the CSLB; a license is needed for work of $1,000 or more in labor and materials, or any smaller job that requires a building permit.
- Owner-builders: owners may take out permits for their own property, either doing the work themselves or with their own employees for a building not offered for sale, or by contracting only with licensed contractors; the application carries both declarations, and the Title 14 chapter on building regulations states it does not stop anyone from doing their own building, mechanical, plumbing or electrical work in compliance with the code.
- Workers’ compensation: every applicant signs the insurance, self-insurance or no-employees declaration.
- Wells and septic: well drilling and septic installation are permitted by Environmental Health, not Building and Safety.
Rather not deal with the Inyo County building department?
Get a free quote →How to get a building permit in Inyo County
Check the county GIS parcel map; Bishop addresses go to the City of Bishop.
Ask Planning about zoning and setbacks, and Environmental Health about septic and well permits if the site is not on a sewer or water system.
Three sets meeting WUI standards with the site plan, topo, Title 24 energy pages and trade pages, or a pre-approved plan set with your site plan.
Fill in the county building permit application, the license and workers’ compensation declarations, and the waste management form if required.
Send it to buildingandsafety@inyocounty.us or bring it to 301 W. Line St., Suite F, Bishop; fees can be paid through the county’s online payment link.
Planning, Environmental Health, fire, sewer district and school fee sign-offs come before issuance.
Review, corrections and what causes delay
Plans submitted for review become void 12 months after the application date, and a new plan check fee is then due. Engineered or unusual designs, and commercial structures, may be sent to contract engineers, at the applicant’s expense. A permit cannot be issued until Environmental Health has cleared any septic system or well, and truss calculations, if deferred, must arrive by the roof sheathing inspection or inspections stop. Issued permits lapse after 36 months unless extended, or sooner if more than a year passes without an inspection; the application form also warns that a permit lapses if work does not start within 180 days (one year for residential).
Inspections in Inyo County
Request inspections at least 24 hours ahead through the county’s online Request for Inspection form, by phone at 760-873-7857 or by email to buildingandsafety@inyocounty.us, giving the permit number, contractor, site address and inspection type. If truss calculations were deferred, they must be on file by the roof sheathing inspection, or no further inspections are made.
Near homes or businesses, construction using powered tools within 500 feet is limited to 7 a.m. to 7 p.m. on weekdays and 9 a.m. to 5 p.m. on weekends, though concrete may be poured from sunrise to sunset. Utilities cannot connect permanent power or propane until the final inspection is approved, apart from the temporary power agreement. A permit with no progress inspection for more than a year is treated as suspended or abandoned, and an expired permit can be extended once for a year on a written request explaining the delay.
California building code in Inyo County
Inyo County enforces Title 24 in its unincorporated area through Title 14 of the county code, with its own snow, wind, wildland-urban interface and truss rules. FEMA’s Community Status Book lists unincorporated Inyo County (community 060073) as participating in the National Flood Insurance Program, with a current flood map dated December 3, 2020; the county’s flood damage prevention chapter applies in mapped flood zones.
Want this handled start to finish?
Get a free quote →California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Inyo County building permit FAQs
Who issues building permits in Bishop?
The City of Bishop issues and inspects permits inside the city; the county Building and Safety Department covers unincorporated land.
Can I email my permit application?
Yes. The county accepts applications by email at buildingandsafety@inyocounty.us.
Do I need a permit for a shed or storage container?
Yes. Both are on the county’s list of work that requires a building permit.
What snow load do I design for?
It depends on the community: 30 pounds per square foot in Independence and Lone Pine, 40 around Bishop and in Big Pine, up to 100 at higher sites such as Aspendell and Whitney Portal.
Is all of Inyo County a wildland-urban interface area?
Yes. Title 14 designates all unincorporated land a Wildland-Urban Interface Fire Area, and plans must meet WUI standards.
How much is a septic permit?
$452 for a new conventional system and $634 for an alternative design under the 2026 Environmental Health fee schedule.
Does the county have free ADU plans?
Yes. Twelve pre-approved ADU and home plan sets are free, and the county says they save about half the permit cost.
How long is a plan check good for?
Twelve months from the application date; after that a new application and plan check fee are needed.
Inyo County permit search and official resources
The county does not post a public permit search. For the history of a permit or an inspection record in the unincorporated county, contact Building and Safety at 760-873-7857 or buildingandsafety@inyocounty.us with the APN or address; for parcels in Bishop, contact the City of Bishop.
Inspections are where schedules slip.
Get a free quote →- Inyo County Building and Safety
- Building permit application packet
- Request for inspection
- Items needed for plan check
- Inyo County Code Title 14 (Ordinance 1255)
- Pre-approved ADU and home plan sets
- ADU how-to guide
- Planning Department
- Planning application fee deposits
- Residential septic systems
- Environmental Health fee schedules
- Public Works permits and encroachments
- County GIS public maps
- City of Bishop building permits
- FEMA Community Status Book, California
Simplify Inyo County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Inyo County sooner?
Let Alliance prepare, file, and track your Inyo County permits while your crew stays on the job.
More California permitting guides
San Bernardino County
Read guide →Tulare County
Read guide →Fresno County
Read guide →Irvine Building Permit Guide
Read guide →Jurupa Valley Building Permit Guide
Read guide →Kerman Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Inyo County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.