Fullerton Building & Safety is at City Hall, 303 W. Commonwealth Ave., Fullerton, CA 92832 (714.738.6300). It is open Monday - Thursday 7:30 AM – 5:30 PM and every other Friday 7:30 AM - 4:30 PM. Census Vintage 2025 estimates put Fullerton at 138,675 residents.
This guide covers the City of Fullerton. The City’s online permit portal and its permit fee schedule could not be checked, so ask Building & Safety how to file and what your permit will cost.
Short on time to read all of this?
Get a free quote →How to get a building permit in Fullerton
For most project types, plans must be prepared by a California licensed architect or engineer. Very small projects can use the City’s standard plans and details.
Projects that need no more than 30 minutes of review are normally reviewed over the counter. Fullerton lists residential patio covers, bathroom and kitchen remodels, commercial signs and free-standing non-retaining block walls.
New construction over 500 square feet pays school developer fees to the Fullerton Joint Union High School District (see the fees below).
Use the Voice Permits line with your permit number and an inspection code.
A building permit carries a validity period and can expire if work does not start or stalls between inspections; confirm the expiry with Fullerton Building & Safety on phased or delayed work. Permit validity in California
Fullerton building code amendments
For the 2025 code cycle, Fullerton has filed local amendment ordinances 3348 and 3349 with the California Building Standards Commission.
Not sure this scope needs a permit?
Get a free quote →Fullerton permit costs and fees
The City’s building permit fees could not be checked for this guide. School developer fees apply to new construction over 500 square feet, and the Fullerton Joint Union High School District (FJUHSD) handles payment for the Fullerton School District as well.
FJUHSD takes developer fee payments by appointment: email DeveloperFees@fjuhsd.org with the document from the City and a requested date and time. Payment is by cashier’s check or money order only; the district’s contact for questions is at 714.626.4386.
Inspections in Fullerton
Building and fire inspections are scheduled, cancelled and checked on the automated Voice Permits line, (714) 738-6543, 24 hours a day, using the permit number and an inspection code. Calls made before midnight go on the next working day’s schedule.
Rather talk it over?
Call 1-855-478-4290 →Official Fullerton permitting resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
- Fullerton permit processing information
- Fullerton inspections
- FJUHSD developer fees
- Fullerton School District developer fees
- Building Standards Commission: 2025 local ordinances
Rather not deal with the building department?
Get a free quote →Frequently asked questions
Do I need an architect or engineer for Fullerton plans?
For most project types, yes: plans must be prepared by a California licensed architect or engineer. Very small projects can use the City’s standard plans and details.
How late can I call for a Fullerton inspection?
The Voice Permits line runs 24 hours a day; calls made before midnight go on the next working day’s schedule.
How do I pay school fees for a Fullerton project?
By appointment with FJUHSD: email DeveloperFees@fjuhsd.org with the City document and a requested date and time, then pay by cashier’s check or money order.
Want this handled start to finish?
Get a free quote →Simplify Fullerton permitting with Alliance Permitting
- Find out which City divisions, districts and outside agencies need to sign off on the project
- Prepare the plans and application files in the format the City accepts
- Pay fees, answer plan review comments and request inspections on time
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Inspections are where schedules slip.
Get a free quote →Ready to break ground in Fullerton sooner?
Let Alliance prepare, file, and track your Fullerton permits while your crew stays on the job.
More California permitting guides
This guide is provided by Alliance Permitting for general information about Fullerton permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.