In East Palo Alto, building permits come from the city’s Building Services Division in Community & Economic Development, at the Permit Center, 1960 Tate Street (650-853-3189). Applications and plans are emailed to building@cityofepa.org, staff reply within two business days, and projects that cannot be issued over the counter go through a 30-day review with two-week rechecks. Fees follow the Comprehensive Fee Schedule effective July 18, 2026, which charges separate plan check and permit fees from the project valuation.
What requires a building permit in East Palo Alto?
Building Services issues permits for new construction, additions and alterations, and for electrical, plumbing and mechanical work. Its fee schedule shows the everyday jobs that need one: kitchen and bathroom remodels, replacement windows and doors, re-roofs, rooftop solar, residential EV chargers, water heaters, HVAC change-outs, electrical panels and services, sewer laterals, gas lines, pools and demolition. Work begun without a permit is charged a penalty fee under the Municipal Code, and the city reports the contractor to the Contractors State License Board.
Permit needed
- New homes, ADUs, additions and garage conversions
- Kitchen and bathroom remodels
- Window and door replacements
- Re-roofs and rooftop solar
- Fences over 7 feet
- Water heaters, furnaces, HVAC and panel upgrades
No building permit (city handout)
- One-story sheds and playhouses up to 120 square feet with no water, power or gas
- Fences up to 7 feet
- Retaining walls up to 4 feet with no surcharge
- Walks and driveways up to 30 inches above grade that are not an accessible route
- Painting, tiling, carpeting, cabinets and countertops
- Detached decks up to 200 square feet and 30 inches high that do not serve the required exit door
- Above-ground prefabricated pools under 24 inches deep and up to 5,000 gallons
Exempt work may still need Planning, Engineering or another agency’s approval, and the city asks anyone planning a kitchen or bathroom remodel to call first. The handout still cites the 2022 California Residential Code.
What East Palo Alto decides and what the state holds
The city adopts the state codes, with its amendments, into Title 15 (Buildings and Construction) of the Municipal Code, sets its fees, impact fees and General Plan surcharge, decides zoning and ADU standards (the ADU ordinance is Chapter 18.96, effective March 11, 2024) and runs its reach code. On June 18, 2024 the City Council adopted local amendments to the Energy Code requiring new single-family homes to beat the standard EDR1 score by at least 9 points (4 points under 1,500 square feet), new low-rise multifamily buildings to beat the source energy margin by 10%, high-rise multifamily by 4% and non-residential buildings by 7%. Enforcement of the earlier all-electric requirement was paused in 2024. Contractor licenses come from the state, and the city checks every contractor’s license and workers’ compensation status during permitting.
East Palo Alto building department: who handles permitting
The Building Services Division reviews plans, issues building and trade permits, inspects work and runs Neighborhood Preservation (code enforcement). Planning handles zoning, new development, ADUs and tree removal; Engineering handles encroachment permits, streets, sidewalks and utilities. Fire review is by the Menlo Park Fire Protection District, 170 Middlefield Road, Menlo Park (650-688-8425; its office is closed Fridays).
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building Services Division, 1960 Tate Street, East Palo Alto, CA 94303 |
| Phone / fax | 650-853-3189 / 650-853-3179 |
| Applications and inspections | building@cityofepa.org |
| Permit Center hours | Monday to Friday 9 a.m. to 4 p.m., closed noon to 1 p.m.; last walk-ins 11:45 a.m. and 3:45 p.m. |
| Planning (ADUs over 800 sq ft, zoning) | planning@cityofepa.org |
| Fire | Menlo Park Fire Protection District, 650-688-8425 |
Depending on the address, sewer service is from the East Palo Alto Sanitary District (650-325-9021) or West Bay Sanitary District (650-321-0384), and water from the city’s water system operated by Veolia (650-322-2083), Palo Alto Park Mutual Water (650-322-6903) or O’Connor Tract Water Corporation (650-321-2723). The city’s agency list asks applicants to coordinate with each one that serves the property.
East Palo Alto permit types
Building Services processes permits electronically: read the Digital Submittal Requirements, then email the building permit application and all plans and documents to building@cityofepa.org.
Residential permits
- Remodels and repairs. Kitchen ($718) and bathroom ($864) remodels without wall changes, window replacements and re-roofs are flat-fee permits, each with a city checklist.
- Additions, garage conversions and new homes are priced by valuation and need full plans; the city posts separate submittal requirements for each, plus a soils report waiver form.
- Solar. Residential solar is a $256 permit, but it is filed only after Menlo Park Fire has approved it: send the application, the fire district’s stamped plans with equipment specifications and its approval letter.
- ADUs and junior ADUs. The Building page says junior ADUs and ADUs under 800 square feet can be emailed straight to Building, while larger ADUs go to planning@cityofepa.org first for a completeness review. The Planning Division’s ADU page describes a Preliminary Ministerial Review (PMR) clearance as the first step for ADUs, billed at $345 an hour with a two-hour minimum. A junior ADU deed restriction must be recorded before the building permit is issued, and ADUs over 750 square feet pay impact fees.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial and multi-family work uses its own valuation tables and the city’s commercial plan submittal requirements, including the tenant improvement checklist and the accessibility worksheet for alterations and additions. Projects in the Ravenswood Business District pay an extra specific plan maintenance fee of $0.26 per square foot.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Planning approval. Projects that need entitlements get Planning approval before the formal building submittal, and Planning also reviews building permits for zoning ($345 for minor residential work or a new house, $1,037 for tenant improvements, $1,384 for new multifamily or commercial buildings).
- Trees. Tree removal is a Planning permit ($519 for one or two trees).
- Encroachment. Work in a street or sidewalk needs an Engineering encroachment permit ($1,059 for most work).
- Sewer. The East Palo Alto Sanitary District charges its own plan check ($726 for a new house), lateral inspection ($1,017) and permit application ($153).
- Septic and wells. San Mateo County Environmental Health, 2000 Alameda de las Pulgas, San Mateo (650-372-6200), is on the city’s agency list.
East Palo Alto permit costs and fees
The Comprehensive Fee Schedule effective July 18, 2026 (revised to add sewer capacity fees effective September 5, 2026) charges two separate valuation-based fees on a single-family project: a plan check fee and a permit and inspection fee. Initial fees cover three plan reviews; further rounds are billed hourly.
| Valuation | Plan check | Permit and inspection |
|---|---|---|
| Up to $5,000 | $252.61 | $816.36 |
| $5,001–$25,000 | $252.61 plus $31.58 per $1,000 | $816.36 plus $61.23 per $1,000 |
| $25,001–$50,000 | $884.14 plus $25.26 per $1,000 | $2,040.89 plus $57.14 per $1,000 |
| $50,001–$100,000 | $1,515.67 plus $50.52 per $1,000 | $3,469.52 plus $53.06 per $1,000 |
| $100,001–$500,000 | $4,041.78 plus $15.16 per $1,000 | $6,122.68 plus $10.20 per $1,000 |
| $500,001–$1,000,000 | $10,104.45 plus $7.58 per $1,000 | $10,204.46 plus $10.20 per $1,000 |
Worked example: a single-family addition valued at $200,000 is in the $100,001–$500,000 band, so plan check is $4,041.78 plus 100 × $15.16 ($5,557.78) and the permit and inspection fee is $6,122.68 plus 100 × $10.20 ($7,142.68), $12,700.46 together. The General Plan maintenance surcharge (27.40% of the building permit fee), impact fees and state fees are added.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Residential re-roof up to 10,000 sq ft, no structural work | $410 |
| Windows: up to 4 / 5 to 20 | $308 / $431 |
| Fence over 7 ft, first 64 linear ft | $408 |
| Residential EV charger / residential solar | $205 / $256 |
| Minor demolition | $416 |
| Water heater or toilet / simple trade item | $154 / $204 |
| Trade permit processing fee | 40% of permit fee |
| Re-inspection / after-hours inspection | $201 / $240 per hour |
| Additional plan check (beyond three reviews or for revisions) | $244 per hour |
| Address assignment | $345 |
| Credit card surcharge | 3.5% |
Impact and capacity fees
New homes and added floor area pay development impact fees set per square foot (effective July 18, 2026): for single-family work $10.86 parks and trails, $8.49 public facilities, $0.58 citywide transportation and a water capacity fee of $4.52 outside the Ravenswood Business District or $2.72 inside it, plus $2.20 RBD transportation inside the district and a storm drainage fee charged per impervious acre ($127,390 outside the district). The East Palo Alto Sanitary District adds a sewer capacity fee of $5.95 per square foot for single-family homes and townhouses from September 5, 2026. ADUs pay these fees only on new livable area above 750 square feet.
Trade permits and who may pull them
Building Services issues electrical, plumbing and mechanical permits too, either with a building permit or alone. Simple stand-alone trade permits are priced by item: water heaters and toilets $154, most other single items $204 (such as an HVAC change-out, a gas test or a backflow device), with a 40% processing fee on top. Complex or commercial stand-alone trade permits are priced by valuation.
- Licensed contractors. The city checks each contractor’s state license. A contractor registered with the state as having no employees and no workers’ compensation who is seen with workers on site is reported.
- Business license. Contractors apply for or renew an East Palo Alto business license through the city’s HdL portal (EastPaloAlto@hdlgov.com, 650-223-7740).
- Owner-builders include the city’s owner-builder declaration with the application, and a property owner can authorize an agent with the city’s permit authorization form.
Rather not deal with the building department?
Get a free quote →How to apply for an East Palo Alto building permit
Ask Planning whether the project needs an entitlement, a PMR clearance (for ADUs) or a tree permit, and note which sanitary district and water provider serve the lot.
Solar goes to the Menlo Park Fire Protection District first; the city’s Menlo Park Fire submittals handout explains the district’s part.
Complete the building permit application and prepare one PDF plan set and PDFs of supporting documents, such as the geotechnical report, structural calculations and energy compliance forms, following the city’s checklist for your project type.
Send everything to building@cityofepa.org. Staff contact you within two business days with next steps and fees.
Non-counter projects take about 30 days for first review and two weeks for each recheck. Use the revised plans submittal requirements for corrections.
Pay the city’s fees and any impact and sanitary district fees, then keep the job card and approved plans on site.
Review, corrections and what causes delay
The submittal flowchart shows the formal path: Planning approval, building submittal, review, corrections and issuance. Initial fees cover three plan reviews; a fourth or a revision is billed at $244 an hour, and an extension request at $189 an hour. Solar is accepted only with the fire district’s approval, a junior ADU deed restriction must be recorded before issuance, and contractor license and workers’ compensation status is checked before a permit goes out.
Inspections in East Palo Alto
Inspections run Monday to Friday, with a daily limit; when a day fills, you get the next open day. Request them by phone at 650-853-3189 or by email to building@cityofepa.org. The job card and approved plans must be on site, or the inspection is rescheduled.
- Typical stages. The city’s typical home improvement inspections handout and its furnace and water heater inspection sheets set out what each visit checks; a smoke and carbon monoxide affidavit covers alarm upgrades.
- Construction rules. The city publishes an hours of construction handout, a construction best management practices sheet and a construction and demolition waste diversion packet (C&D waste form).
- Special inspections are arranged with the city’s special inspection form.
- Occupancy. The city posts an application for a certificate of occupancy; issuing a certificate or temporary certificate is billed at $209 an hour.
Local details in East Palo Alto
- Flood zones. East Palo Alto participates in the National Flood Insurance Program with a flood map dated April 5, 2019, and is in FEMA’s Community Rating System at class 8, a 10% premium discount for eligible policies.
- Addresses. A new address is requested on the building permit application, costs $345.43 on the Building page ($345 in the fee schedule), paid by cash, check or money order, and takes about a week after payment.
- ADU help. The Planning page lists the San Mateo County ADU Resource Center and the city’s CalHOME ADU and JADU loan program.
Want this handled start to finish?
Get a free quote →California building code in East Palo Alto
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
The Building Services page points applicants to the 2025 California codes for current submittals, and solar plans must show compliance with the 2025 California Building Code on the first sheet.
East Palo Alto building permit FAQs
Who issues building permits in East Palo Alto?
The city’s Building Services Division at the Permit Center, 1960 Tate Street (650-853-3189). It is open weekdays 9 a.m. to 4 p.m., closed noon to 1 p.m.
How do I submit a permit application?
Email the building permit application, one PDF plan set and supporting documents to building@cityofepa.org. Staff reply within two business days with next steps.
How long does plan review take?
Projects that are not over-the-counter permits go through a 30-day review, and resubmittals are rechecked in about two weeks.
How much is a building permit in East Palo Alto?
For a single-family project valued at $200,000, plan check is $5,557.78 and the permit and inspection fee is $7,142.68 under the July 18, 2026 schedule, before surcharges and impact fees. A kitchen remodel without wall changes is a flat $718 and a residential re-roof $410.
Do I need a permit for a fence or shed?
Not for a fence up to 7 feet or a shed up to 120 square feet with no utilities, though Planning rules still apply. Fences over 7 feet start at $408.
How do I get a solar permit?
Get the Menlo Park Fire Protection District’s approval first, then email the city the application, the fire-stamped plans and the approval letter. The residential solar fee is $256.
Where do I start an ADU?
Junior ADUs and ADUs under 800 square feet can go to Building; larger ADUs go to Planning first. Planning’s ADU page also asks for a Preliminary Ministerial Review clearance, so confirm the route with Planning at planning@cityofepa.org.
How do I schedule an inspection?
Call 650-853-3189 or email building@cityofepa.org. Inspections run Monday to Friday with a daily cap.
East Palo Alto permit search and official resources
Permit history for a property is requested through the city’s NextRequest records portal. Copies of plans, where they exist, need the Plan Duplication Request form and the plan owner’s approval; duplication fees are paid before plans are released, and records research is billed at $93 per half hour.
Inspections are where schedules slip.
Get a free quote →- East Palo Alto Building Services Division
- Building Services contact information
- Building informational handouts and checklists
- Work not requiring a building permit
- Building submittal flowchart
- Agency coordination list
- Comprehensive Fee Schedule page
- Comprehensive Fee Schedule, effective July 18, 2026
- Reach codes
- Accessory dwelling units (Planning)
- Public records requests (NextRequest)
- 2025 California Title 24 building standards
- FEMA Community Status Book, California
Simplify East Palo Alto permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in East Palo Alto sooner?
Let Alliance prepare, file, and track your East Palo Alto permits while your crew stays on the job.
More California permitting guides
San Mateo County
Read guide →Foster City
Read guide →Half Moon Bay
Read guide →Eastvale Building Permit Guide
Read guide →El Cajon Building Permit Guide
Read guide →El Centro Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about East Palo Alto permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.