Burlingame, California Building Permit Guide

To get a building permit in Burlingame, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Burlingame’s Building Division, on the third floor at 1440 Chapin Avenue, checks plans, issues permits and inspects work in the city, with every permit type filed online in eTRAKiT.

Authority: Burlingame Building DivisionFiling: eTRAKiT onlinePhone: 650-558-7260
Authority
City Building Division1440 Chapin Ave, 3rd floor
Counter
Mon–Thu 8–4Friday by appointment
Plan check
65% of permit feePaid within 24 hours of submittal
Inspections
Call or email650-558-7260

Building permits in Burlingame come from the city’s Building Division in the Community Development Department, 1440 Chapin Avenue, third floor (650-558-7260). Applications for every permit type go through the eTRAKiT portal, and a project that needs Planning Commission approval must have it before the building submittal. Fees follow the Master Fee Schedule effective July 1, 2026: a valuation-based permit fee, with a plan check fee of 65% of it that is billed at submittal.

What requires a building permit in Burlingame?

The city’s December 2025 handout on permit-exempt work starts from the rule that building, enlarging, altering, repairing, moving or demolishing a structure, changing its occupancy, or installing or replacing regulated electrical, gas, mechanical or plumbing equipment needs a permit from the building official first.

Permit needed

  • New houses, multi-family buildings, garages and commercial buildings
  • Additions, decks, balconies and interior remodels
  • Re-roofing and window replacement (flat fees for houses and duplexes)
  • Electrical panels, EV chargers and whole-house rewiring
  • Furnace, air conditioner and heat pump work
  • Water heaters, water services and sewer lateral replacement
  • Demolition of houses, apartments and accessory structures

Exempt (partial list)

  • One-story detached sheds and playhouses up to 120 square feet
  • Fences up to 7 feet, other than pool barriers
  • Detached decks under 200 square feet and under 30 inches high that do not serve an exit door
  • Retaining walls 4 feet or less that carry no surcharge
  • Walks and driveways 30 inches or less above grade
  • Painting, tiling, carpeting, cabinets and countertops
  • Prefabricated pools up to 24 inches deep at a house

An exemption from a building permit does not excuse zoning: fence heights and locations still follow the fence and hedge chapter of the zoning code, and a project on a hillside lot may need a Hillside Area Construction Permit from Planning. Emergency equipment replacements may go ahead, but the permit application is due to the building official the next working day.

What Burlingame decides and what the state holds

Burlingame’s building rules sit in Title 18 of its Municipal Code (Building Construction), with zoning in Title 25. The city sets its own fees every July 1, its construction hours, its design review and hillside rules, its business license tax and its reach code. In November 2024 the City Council rescinded the gas ban in its 2022 reach code and adopted energy performance rules instead (new single-family homes must beat the standard compliance margin by at least 9 points); the city’s page describes that version as covering projects first submitted through December 31, 2025. Contractor licensing stays with the state.

Burlingame building department: who handles permitting

The Building Division plan-checks construction documents, issues permits and inspects work in progress for buildings and structures in the city, and acts as the clearinghouse that routes plans to Planning, Engineering and the fire department. Fire and life safety review is done by the Central County Fire Department, which charges 12% of the building permit fees on commercial, non-residential and multi-family projects. Grading and drainage questions go to Public Works – Engineering, which also issues encroachment permits for work in the street or sidewalk.

Short on time to read all of this?

Get a free quote →
Burlingame permit contacts
DetailInformation
OfficeBuilding Division, 1440 Chapin Avenue, Third Floor, Burlingame, CA 94010
Phone650-558-7260
Emailbuildingpermits@burlingame.org; inspections buildinginspections@burlingame.org
Counter hoursMonday to Thursday 8 a.m. to 4 p.m., closed noon to 1 p.m.; Friday by appointment only
Online filingeTRAKiT (all permit types); Symbium for residential solar and battery storage
Planning Division650-558-7250, planningdept@burlingame.org

Some city handouts still print the former address at 501 Primrose Road; the Building and Planning pages give 1440 Chapin Avenue.

Burlingame permit types

eTRAKiT sorts applications by permit type, and choosing the right one matters because each has its own review track and submittal list. Before uploading, read the plan submittal requirements and name every PDF in the city’s format (street name, street number, then document type, for example “Primrose Rd 501 – Building Plans.pdf”). Incomplete submittals are not processed.

Residential permits

  • Residential Alteration covers interior work that adds no habitable floor area, plus re-roofs, window replacements, garage ADU conversions and junior ADUs. Expect at least 15 business days of review.
  • Residential Addition covers work that adds habitable space, including decks and balconies; plans usually include architectural, structural, civil and Title 24 energy sheets. At least 15 business days.
  • Residential New is for new homes, apartment buildings and garages; a soils report and review letter are part of the package. At least 20 business days.
  • Residential Electrical, Mechanical and Plumbing permits are for stand-alone trade work, reviewed in 5–10 business days. A furnace in an attic or crawlspace needs a floor plan showing the access opening, pathway, light and service outlet.
  • Residential Demo needs a job number from the Bay Area Air Quality Management District.
  • ADUs are filed as alterations or additions depending on scope. Even a plan from the city’s pre-reviewed ADU program needs a site-specific permit with foundation and utility plans.

Commercial permits

Tenant improvements, repairs and changes of use are filed as Commercial Alteration (at least 15 business days) and new commercial and mixed-use buildings as Commercial New (at least 20 business days). Both need a special inspections form; new buildings also need a soils report. Commercial electrical permits cover panels, solar and EV chargers, and EV plans must show accessible parking under the state accessibility chapter.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Planning approvals. The Building Division only accepts submittals that already have Planning Commission approval or do not need it. New houses and many additions go through design review; smaller changes may qualify for minor design review or a minor modification. Planning applications are emailed to Planning and count as submitted only once fees are paid.
  • Hillside lots. Properties in the Hillside overlay need a Hillside Area Construction Permit; the city posts a map of affected parcels.
  • Engineering. Grading and drainage, storm water permits and encroachment permits for sidewalk, driveway, sewer lateral and utility work are handled by Public Works – Engineering.

Burlingame permit costs and fees

Fees come from the Fiscal Year 2026–27 Master Fee Schedule, effective July 1, 2026, published by the Finance department. Valuation is set by the city from the latest ICC valuation data times a regional factor of 2.29, so it can exceed your contract price. Plan check fees are billed at submittal and must be paid within 24 hours before review starts; the permit fee is paid when the permit is ready to issue.

Burlingame building fees, Master Fee Schedule FY 2026–27
ItemFee
Valuation $1–$10,00010% of valuation
Valuation $10,001–$25,000$1,063.27 plus $17.24 per $1,000
Valuation $25,001–$100,000$1,304.57 at $25,001; $2,609.15 at $50,001; plus $52.18 per $1,000
Valuation $100,001–$500,000$5,218.30 plus $9.15 per $1,000
Valuation $500,001–$1,000,000$8,877.31 plus $31.34 per $1,000
Valuation $1,000,001–$10,000,000$24,547.22 plus $12.95 per $1,000
Re-roof or window replacement, house or duplex$563 each
Building plan review65% of building permit fee
Disabled access, Planning and Engineering plan checks (where they apply)25% of building permit fee each
Trade permit issuance (plumbing, mechanical, electrical)$102 each
New residential building, each trade$0.18 per sq ft
Water heater / EV charger$173 / $173
Residential solar permit and plan check$0 (waived)
Re-inspection$230.35 per hour, one-hour minimum
General Plan and zoning maintenance surcharge0.2% of valuation
Technology fee2%

Rather talk it over?

Call 1-855-478-4290 →

Worked example: if the city values a house addition at $200,000, the building permit fee is $5,218.30 plus 100 × $9.15, or $6,133.30, and building plan review adds 65% of that, $3,986.65. The 0.2% General Plan surcharge adds $400, before trade permits, the technology fee, any Planning or Engineering plan checks, the recycling deposit and state fees.

Deposits, impact fees and planning fees

A construction recycling deposit is collected on most jobs: 1.5% of job value for alterations and additions and 1.0% for new construction. New development and expansions pay public facilities impact fees under Chapter 25.46 (a new single-family home pays $2,825 general, $2,443 library, $448 police, $605 parks and $1,612 traffic fees per unit; houses are exempt where no unit is added), and larger multi-family and commercial projects may owe residential impact or commercial linkage fees. Planning fees include $1,189 for a pre-application, $3,220 for single-unit design review, $843 for minor design review or a minor modification, $1,257 for a Hillside Area Construction Permit, $1,140 for a single-unit variance and $843 for a fence variance. Cards carry a 2.7% processing fee and e-checks $1.

Trade permits and who may pull them

Electrical, mechanical and plumbing work is permitted by the same Building Division, either inside the building permit for an alteration or addition or as its own trade permit when it stands alone. The fee schedule prices trade permits by item (each furnace, fixture, water heater, gas outlet or circuit) after a $102 issuance fee, and plan review on trade permits, where needed, is 25% of the trade fee.

  • Contractors need a state license, and anyone doing business in the city, including contractors based elsewhere, pays Burlingame’s business license tax. Licenses are handled by the city’s contractor, HdL Companies (650-844-6689): $200 a year for gross receipts up to $249,999, $300 from $250,000 to $999,999 and $750 at $1,000,000 or more.
  • Owner-builders file the city’s owner-builder declaration with the application.

Rather not deal with the building department?

Get a free quote →

How to apply for a Burlingame building permit

1. Settle planning first

Check the zoning map and ask the Planning Division whether your project needs design review, a hillside permit or a variance. The building submittal is accepted only once any Planning Commission approval is in place.

2. Pick the eTRAKiT permit type

Create an eTRAKiT account and choose the matching permit type: alteration, addition, new, trade, demolition or commercial.

3. Prepare the plan set

Follow the submittal guide: 24 by 36 inch sheets at quarter-inch scale for most work, a cover sheet with address, parcel number, scope and building data, a surveyed site plan, floor plans, elevations, structural plans and Title 24 energy reports.

4. Upload a complete package

Fill in the online application, then upload every PDF through the paper clip icon next to your permit number. Files over 10 MB can be sent as a cloud link to buildingpermits@burlingame.org.

5. Pay plan check and answer comments

Pay the plan check fee within 24 hours of the invoice. Departments review in turn and staff email the comments; send corrections by email for instructions.

6. Clear the remaining items

When every department has approved, the city emails a list of what is still due, such as the recycling plan, storm water permit, encroachment permit, special inspection forms and business license renewal.

7. Pay and print

After payment the city emails the permit card and plans; print them for the job site.

Review, corrections and what causes delay

Review times are listed with each permit type above and run from a complete upload and payment. Review waits on any missing Planning approval, an incomplete package or an unpaid plan check invoice. More than four plan checks, or a major redesign, are billed again under the Planning recheck fees ($937 and $1,227).

Inspections in Burlingame

Request inspections by calling 650-558-7260 or emailing buildinginspections@burlingame.org, and have the printed permit, plans and documents on site. The city’s residential checklist runs from underground plumbing (a two-way cleanout within 5 feet of the house and a 10-foot head test) through foundation, framing (the truss packet must be approved first), rough trades and insulation to final.

  • Construction hours. Building work, excavation and grading are allowed 8 a.m. to 7 p.m. on weekdays and 9 a.m. to 6 p.m. on Saturdays, never on Sundays or city holidays without written approval from the building official. In the Bayfront Commercial, Innovative Industrial and Rollins Road Mixed Use zones weekday work may start at 7 a.m., but not with chainsaws, jackhammers, pile drivers or impact wrenches before 8. Street work runs 8 a.m. to 5 p.m. on weekdays.
  • Roofs in fire areas. The city’s wildland-urban interface re-roof handout requires a Class A roof covering when 50% or more of a roof is replaced within 12 months.
  • After hours. Inspections outside business hours cost $267.30 an hour.
  • Expiration. The expiration date is printed at the bottom right of the permit card and can be looked up in eTRAKiT.

Local details in Burlingame

  • Flood zones. Burlingame takes part in the National Flood Insurance Program; its current flood map is dated April 5, 2019, and the city is in FEMA’s Community Rating System at class 9, which gives eligible policyholders a 5% premium discount.
  • Balconies. The Building Division posts guidance on the state balcony and exterior elevated element inspection laws (SB 721 and SB 326) for apartment and condominium buildings.

Want this handled start to finish?

Get a free quote →

California building code in Burlingame

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Burlingame enforces the 2025 California codes together with its own Building Construction title (Title 18) of the Municipal Code; the city’s Codes and Regulations page links Title 18, the zoning title and the fence and hedge chapter.

Burlingame building permit FAQs

Who issues building permits in Burlingame?

The city’s Building Division, part of Community Development, at 1440 Chapin Avenue, third floor (650-558-7260, buildingpermits@burlingame.org). The counter is open Monday to Thursday, with Fridays by appointment.

How much does a building permit cost in Burlingame?

It depends on valuation under the July 1, 2026 fee schedule. A $200,000 addition, for example, carries a $6,133.30 permit fee and $3,986.65 in building plan review, before trade permits and surcharges. Re-roofs and window replacements at houses and duplexes are a flat $563.

Do I need a permit for a fence or a shed?

Not for a fence up to 7 feet that is not a pool barrier, or a one-story shed up to 120 square feet. Fence height and placement still follow the zoning code.

How long does plan review take?

At least 15 business days for most alterations, additions and commercial alterations, 20 for new buildings and 5–10 for stand-alone electrical, mechanical or plumbing permits, counted from a complete submittal.

Do I need Planning approval first?

If your project needs Planning Commission approval, the Building Division accepts the building submittal only after that approval. New houses and many additions need design review, and lots in the Hillside overlay need a Hillside Area Construction Permit.

Does a contractor need a Burlingame business license?

Yes. Anyone doing business in the city pays the business license tax through HdL Companies, from $200 to $750 a year depending on gross receipts, whether or not the business is located in Burlingame.

How do I book an inspection?

Call 650-558-7260 or email buildinginspections@burlingame.org; keep the permit card and plans on site.

Burlingame permit search and official resources

Permit status, expiration dates and inspection results are in eTRAKiT under your permit number. For older permits and plans, use the city’s public records portal or a records request.

Inspections are where schedules slip.

Get a free quote →

Simplify Burlingame permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Burlingame sooner?