Inside the City of Calabasas, building, electrical, plumbing and mechanical permits come from the Building and Safety Division of the Community Development Department at City Hall, 100 Civic Center Way (Permit Center 818-224-2534). Plans go in as PDF files, permits and stamped plans are issued electronically, and inspections are booked only in the city’s SmartGov portal. Fees follow the city’s fee schedule valid from July 1, 2026 to June 30, 2027: a valuation-based permit fee, plan check at 85% of that fee and a $44 issuance fee.
What requires a building permit in Calabasas?
Calabasas issues separate building, electrical, plumbing and mechanical permits, and its application forms show the range of work it reviews: new homes and additions, alterations and repairs, demolition, tenant improvements, pools and spas, retaining and block walls, patios, trellises, decks and balconies, re-roofing, window and door replacement, signs, fire sprinklers and solar. Every permit, of any type, starts with the city’s Building Project Identification form.
Projects with their own city checklists
- Residential kitchens, bathrooms and window or door changes
- Roof recovering and replacement, residential and non-residential
- Residential battery back-up and generator systems
- Graywater systems for single-family homes
- Tank and tankless water heaters
- EV chargers for homes, multi-family and non-residential sites
- Pools and spas, including pool demolition or abandonment
- Attached patio covers and retaining block walls
Where to check exemptions
- The division’s “Work Exempt from Permits” handout lists work that needs no permit
- Planning approvals such as a zoning clearance, oak tree permit or scenic corridor permit can still apply
The division also publishes an allowable construction hours handout and a list of federal holidays that are no-construction work days in the city.
What Calabasas decides and what the state holds
The city sets its own building, planning and trade fees each fiscal year, publishes local Residential Standard Notes and Very High Fire Hazard Severity Zone construction notes for 2025-code projects, runs a special inspection program, and controls oak trees, scenic corridors and development plan review through its Planning Division. Contractor licensing and the state building code stay with the state.
Calabasas building department: who handles permitting
The City of Calabasas Building and Safety Division issues building and trade permits for every address inside city limits, does the plan check and performs the inspections. The Los Angeles County Fire Department, which serves Calabasas, handles fire prevention: its Calabasas regional office at 26600 Agoura Road, Suite 110 (818-880-0341) does new construction field inspections and minor fire plan checks.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | City Hall, 100 Civic Center Way, Calabasas, CA 91302 |
| Counter hours | Monday to Thursday 7:30 a.m. to 4 p.m.; Friday 7:30 a.m. to 2 p.m. |
| Permit Center | 818-224-2534 |
| Plan check | 818-224-1600 or 818-224-1732 |
| BuildingSafetyInfo@cityofcalabasas.com | |
| Inspections line | 818-224-1600 for questions only; requests go through the portal |
| Code enforcement | 818-224-2633 (818-224-CODE) |
| Portal | City of Calabasas SmartGov Online Permit Center |
Calabasas permit types
Calabasas uses separate application forms for residential building and plan review, commercial building and plan review, electrical, mechanical and plumbing permits, plus forms for new tenants, a change of contractor, address numbers and a certificate of occupancy. SmartGov takes online building applications, but the portal says not every building permit type can be filed there yet.
Residential permits
- New homes and additions follow the Residential Permit Submittal Checklist and the Residential Plan Requirements (revised February 2026), with the 2025 Calabasas Residential Standard Notes on the plans. A combined building permit is 1.6 times the building permit fee.
- Pools and spas use the pool and spa application checklist, drainage certification and plan, anti-entrapment certification and a local stormwater pollution prevention plan for pool and spa work; a combined pool permit is twice the building permit fee, and the city offers a streamlined pool plan check.
- Rooftop solar is reviewed through SolarAPP+. The city’s photovoltaic fees are $167 plan check and $248 permit for systems below 10 kW.
- ADUs have their own division page, and a Planning zoning clearance for an ADU or junior ADU costs $717.
- Hillside and seismic sites may need geology or soils reports; the division reviews an engineering geology or soils report for $699 each, or a combined report for $992.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects use the commercial plan review application, the Tenant Improvement Submittal Requirements and a tenant improvement authorization, and the city publishes non-residential roof and HVAC checklists, an unreasonable hardship form for disabled access upgrades. A change of use or occupancy inspection is $362 for Group R or M occupancies and $910 to $2,744 for other groups, depending on floor area. Commercial hoods, garage ventilation, stair pressurization and product-conveying systems carry mechanical surcharges of $277 each when part of the proposed work.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Planning clearance: the Planning Division asks applicants to call 818-224-1600 before applying for a planning permit. A zoning clearance costs $98 for a tenant improvement or for solar panels, $130 for a minor exterior change and $430 for a pool or accessory structure.
- Oak trees: a single-family oak tree permit linked to a construction project is $4,693, or $1,631 when not tied to construction.
- Development plan review: $4,464 for an addition and $8,396 for a new single-family home on one lot.
- Fire hazard zones: the division publishes 2025 Very High Fire Hazard Severity Zone construction notes, and the county fire department’s Fuel Modification Unit approves landscape plans for new structures, or additions of at least 50% of the existing floor area, in those zones.
- Other agencies: the city’s Regulatory Agency Referrals handout lists outside approvals, and Public Works issues its own permits for work in the street.
Calabasas building permit fees
The Building and Safety fee schedule in force is valid from July 1, 2026 to June 30, 2027 (the fiscal 2027 update, with a 3.2% cost-of-living increase). The building permit fee comes from the project valuation, which the city sets using the latest Los Angeles County Public Works building valuation guide sheet at its “Excellent” category rates.
| Project valuation | Building permit fee |
|---|---|
| $0 to $700 | $72 |
| $700.01 to $1,000 | $107 |
| $1,000.01 to $25,000 | $107 plus $29 per $1,000 over $1,000 |
| $25,000.01 to $50,000 | $781 plus $23 per $1,000 over $25,000 |
| $50,000.01 to $100,000 | $1,331 plus $14 per $1,000 over $50,000 |
| Over $100,000 | $2,142 plus $9 per $1,000 over $100,000 |
| Item | Fee |
|---|---|
| Plan check | 85% of the building permit fee, minimum $112 |
| Energy / disabled access plan check | 10% / 5% of the building permit fee |
| Issuance fee, each permit | $44 |
| Technology fee | 3% of the total fee |
| General plan maintenance fee | 5% of the total cost of a permit |
| Extra plan review (changes, or beyond the second check) | $178 per hour |
| Inspection with no set fee / outside business hours | $167 per hour / $200 per hour, 4-hour minimum |
| Certificate of occupancy / temporary certificate | $178 / $248 |
| Permit extension | $42 |
| Permit or application reinstatement within one year | 25% of the original fee |
| Record search and copy of a permit | $35 first, $4 each additional |
| Coastal Act approval in concept review | $221 |
Rather talk it over?
Call 1-855-478-4290 →Worked example: an addition valued at $40,000 has a building permit fee of $781 plus 15 times $23, or $1,126, and a plan check fee of 85% of that, $957.10. The $44 issuance fee, any energy or disabled access plan check, the 3% technology fee, the 5% general plan maintenance fee and state-mandated fees are then added. The valuation bands do not join exactly at their boundaries, so staff compute each fee from the band the valuation falls in.
Planning fees come from the city’s separate fiscal 2027 land use fee schedule, which adds the same 3% technology fee and 5% general plan maintenance fee. A variance for a single-family home is $3,115, and a minor scenic corridor permit for fences or walls is $488. From January 4, 2027, credit card payments in the SmartGov portal carry a transaction fee.
Trade permits and who may pull them in Calabasas
Electrical, plumbing and mechanical permits each have their own application and a $44 issuance fee. Electrical work on a new single- or two-family home is $1.00 per square foot (multi-family $0.75), a new in-ground residential pool is $134, and electrical plan check is 70% of the permit fee with a $178 minimum. Plumbing fixtures and water heaters are $26 each, a house sewer connection $79 and a private sewage disposal system $161, with plumbing plan check at 40% (minimum $180). A refrigeration, compressor or absorption unit up to 100,000 BTU is $42 to install, alter or relocate, with plan check at 50% (minimum $178). Work started without a permit triggers an investigation fee of $277 for R-3 occupancies and $558 for others.
The Building Project Identification form says each permit is issued in the name of the licensed contractor or the property owner as permit holder of record, who is responsible for the construction. A contractor signs the licensed contractor declaration with license number, class and expiration date; an owner doing the work signs the exemption declaration and, as an owner-builder, the Property Owner’s Disclosure. Someone filing for a contractor or an owner uses the matching Authorized Agent form, and a change of contractor during the job has its own form.
How to apply for a Calabasas building permit
Call 818-224-1600 to learn whether the project needs a zoning clearance, oak tree permit or other planning approval, and get it.
Complete the Building Project Identification form, the residential or commercial application and any trade applications, plus the Electronic Plan Review Form.
Use 24 by 36 inch sheets in landscape layout at 300 dpi, 25 MB per file at most, with a 3.25-inch clear corner for city stamps and the city’s file naming pattern.
Email the applications and plan set to BuildingSafetyInfo@cityofcalabasas.com, or apply in SmartGov where the permit type is offered.
Upload responses and revised sheets labeled by submittal number until the plans are approved.
Pay the fees, then print the electronically issued permit and stamped plans for the job site.
Create a SmartGov account with the access code from the counter so you can request inspections.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
A single combined PDF is expected for most projects such as houses and duplexes, while large multi-unit and some commercial projects may split files by discipline. The form asks for sheets labeled to match the sheet index, flattened layers, no security restrictions and a clear stamp area, and each applicant acknowledges every item. Review beyond the first and second check, and review of changes to approved plans, is billed at $178 an hour. The forms list also carries an At-Risk Plan Check Acknowledgement. Permits that lapse can be extended for $42 or reinstated within one year, where no code change applies, at 25% of the original fee.
Calabasas building inspections
Inspection requests by phone or email are no longer accepted: they go through SmartGov by 3 p.m. on the business day before, and later requests roll to the next available day. Only people listed on the issued permit can request an inspection. The city’s inspection page says the schedule is set by 8 a.m. each business day, while the portal says inspectors schedule until 9 a.m.; registered users get an email that morning, the daily schedule is posted online, and 818-224-1600 can confirm a time window.
The general contractor, owner-builder or authorized representative must confirm the work is complete, walk with the inspector and post a visible address. The city’s sequence runs from foundation (with forms, steel, hold-downs, the ufer ground and a 10-foot head water test on drain lines) through slab or under-floor, roof sheathing, exterior shear before wrap, combination framing and rough trades, insulation, drywall, sewer and water service, and exterior lath, with extra stages (footing, throat, anchor straps and bond beam) for masonry fireplaces. After the electrical release inspection, city staff contact Southern California Edison to release the meter. The gas line test holds 10 psi for at least 15 minutes.
Final inspection needs lot drainage, posted address, working fixtures, the insulation certificate and a clean structure, plus clearances from Planning and Public Works and, where they apply, the fire and health departments. A certificate of occupancy is $178.
California building code in Calabasas
For projects under the 2025 code the division publishes the 2025 Calabasas Residential Standard Notes and 2025 Very High Fire Hazard Severity Zone construction notes; the city’s building code chapters are in the Calabasas Municipal Code, linked from the division’s menu. FEMA’s Community Status Book lists the City of Calabasas (community 060749) as participating in the National Flood Insurance Program, with a current flood map dated December 21, 2018.
Want this handled start to finish?
Get a free quote →California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Calabasas permit search and official resources
SmartGov lets anyone look up pending applications and issued permits, and the public inspection schedule shows each day’s visits. For older permits and plans, the division charges $35 for a record search and copy, and $71 to reproduce microfilmed plans; the Forms and Handouts page carries the city’s public records request form and its copying-of-plans form.
- Calabasas Building and Safety Division
- Counter hours and contact information
- Building and Safety fee schedule, fiscal 2027
- Construction permit applications
- Forms and handouts
- Inspection requests
- SmartGov Online Permit Center
- Daily inspection schedule
- SmartGov documents and application forms
- Electronic Plan Review Form
- Building Project Identification form
- Property Owner’s Disclosure for owner-builders
- Land use (planning) fee schedule, fiscal 2027
- Los Angeles County Fire Department, Fire Prevention
- LA County Fire fuel modification plan review
- FEMA Community Status Book, California
Inspections are where schedules slip.
Get a free quote →Calabasas building permit FAQs
How much is a building permit in Calabasas?
It depends on valuation: $107 plus $29 per $1,000 over $1,000 for jobs up to $25,000, then lower rates per $1,000 for larger jobs, plus plan check at 85% and a $44 issuance fee.
Can I submit plans online?
Yes, as PDF files emailed to the division or uploaded in SmartGov for the permit types it offers; permits and stamped plans are issued electronically.
How do I schedule an inspection?
Only through the SmartGov portal, by 3 p.m. on the business day before; phone and email requests are not accepted.
Can a homeowner pull a permit?
Yes. The owner signs the owner-builder declaration and the Property Owner’s Disclosure and becomes the permit holder of record.
Do I need a permit to remove an oak tree?
Oak trees are regulated by the Planning Division; a single-family oak tree permit tied to construction costs $4,693.
Who does fire plan review in Calabasas?
The Los Angeles County Fire Department; its Calabasas regional fire prevention office is at 26600 Agoura Road, Suite 110.
How much does a rooftop solar permit cost?
Solar plan review and permits run through SolarAPP+; the city’s fee schedule lists $167 plan check plus a $248 permit for systems under 10 kW.
What is added on top of the permit fee?
A 3% technology fee, a 5% general plan maintenance fee and the state-mandated strong motion, building standards and disability access fees.
Simplify Calabasas permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Calabasas sooner?
Let Alliance prepare, file, and track your Calabasas permits while your crew stays on the job.
More California permitting guides
Los Angeles County
Read guide →Cerritos
Read guide →Claremont
Read guide →Calaveras County Building Permit Guide
Read guide →Calexico Building Permit Guide
Read guide →California City Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Calabasas permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.