To get a building permit in Arvin, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Arvin’s Building Division at 141 Plumtree Drive issues building and trade permits inside city limits through the city’s online permit portal, with fees set by Resolution 2018-45 and plan check at 65% of the permit fee.

Authority: Arvin Building DivisionFees: Resolution 2018-45Phone: 661-854-2822
Authority
City Building Division141 Plumtree Drive, Arvin
Plan check
65% of permit feeResolution 2018-45
No permit
Under 120 sq ftMeasured eave to eave
Hours
Mon–Thu 8–5Closed every other Friday

In the City of Arvin, building permits are issued by the Building Division of Community Development, 141 Plumtree Drive (661-854-2822), an office the city notes is certified by the International Code Council. Applications are filed through the city’s online permit portal. Fees follow the Building Services Fee Schedule adopted by Resolution 2018-45 on June 19, 2018: a valuation-based permit fee, plan check at 65% of it, and a $41.60 issuance fee. The schedule’s own example puts a 1,000-square-foot house at a $1,742.32 permit fee plus $1,132.51 for plan check. Unincorporated land around the city is handled by Kern County.

What requires a building permit in Arvin?

Arvin’s building FAQ says a permit is required for any construction that physically changes or adds structures on a property, or for work regulated by local codes and ordinances. Its examples range from new buildings and room additions to water heater swaps.

Permit required

  • New buildings, and moving or demolishing a building
  • Room additions, patio covers and swimming pools
  • Re-roofs, garage conversions and exterior stucco
  • Stoves, wall heaters and fireplaces
  • Replacing a water heater, plumbing fixtures or an air conditioning unit, a new electrical service, or rewiring
  • Carports (the city posts its own carport building standards)

No permit

  • A building or structure under 120 square feet measured eave to eave
  • Zoning rules still apply to exempt structures; the Planning Division issues zoning clearances

What Arvin decides and what the state holds

Arvin sets its own building fees by council resolution, enforces its Municipal Code and zoning, and keeps its own residential solar ordinance (Chapter 15.42, adopted in 2015) with standard plans, checklists and inspection guides for small home solar, solar water heating and solar pool heating. Any construction that does not meet the conventional light-frame rules in Chapter 23 of the California Building Code, and most commercial work, must be designed and stamped by a California-licensed architect or engineer. The city also collects “maintenance fees” on every building, planning and engineering application to pay for upkeep of its codes, maps and general plan.

Arvin building department: who handles permitting

The city issues its own permits. The Building Division handles permits, plan checks and inspections; the Planning Division enforces zoning, issues zoning clearances and planning permits and staffs the Planning Commission; Engineering Services handles city engineering work. All three share one phone number. Fee schedules note that a building consultant provides building services to the city alongside city staff, and services not listed in the schedule are billed at the contract cost plus a 15% surcharge. Land outside the city limits is permitted by Kern County.

Short on time to read all of this?

Get a free quote →
Arvin permit contacts
DetailInformation
OfficeBuilding Division, Community Development, 141 Plumtree Drive, Arvin, CA 93203
Phone661-854-2822 (Building, Planning and Engineering)
HoursMonday to Thursday 8 a.m. to 5 p.m.; every other Friday 8 a.m. to 4:30 p.m.; closed alternate Fridays
Online filingCity of Arvin permit portal (OpenGov): create an account to apply
CertificationOffice certified by the International Code Council

Arvin permit types

Applications are made through the city’s online permit portal, where you create an account and choose the permit type; the city also posts a printed building permit application. Plans must show all proposed work clearly enough that a stranger could build the project from them.

Residential permits

  • New houses and additions: a scaled site plan with property lines, structures, uses and distances and a north arrow; a floor plan with room uses; structural plans (foundation, wall framing with bracing, floor and roof framing or truss layout, sections and connection details); an electrical plan showing smoke detectors; and Title 24 energy documentation. Plumbing and mechanical plans are not required for houses unless the construction is unusual.
  • Solar: small home systems follow the city’s solar ordinance and standard plans. Licensed contractors who hold an Arvin business license can use SolarAPP+: get the automated approval, upload it to a SolarAPP+ application on the city portal, pay online, and the permit issues automatically.
  • Accessory dwelling units: the Pre-Approved ADU Program gives owners free plan sets for single-story detached ADUs in three floor plans and two designs; some site-specific work is still needed. A loan program through Self-Help Enterprises can help qualified homeowners build or repair an ADU.
  • Pools, spas, re-roofs and appliances are flat-fee “special miscellaneous” permits that include plan check.

Commercial permits

Most commercial projects must be designed and stamped by a California-licensed architect or engineer and need structural calculations with a full vertical and lateral analysis. Commercial and multifamily plans must show compliance with California disabled access regulations, including access features with dimensions, and alterations or structural repairs must address certain access items too. Complete plumbing and mechanical plans are required for most commercial work, and a soils investigation is likely under CBC Chapter 18. Signs use a separate sign permit application.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning clearance and planning permits. Planning checks zoning and handles site development plans, which may need environmental review (the city posts the CEQA checklist form).
  • Addressing. The city’s address application is used to assign addresses for new buildings.
  • Site plan check. The city posts a site plan checklist for new projects.
  • Engineering. Work in city streets requires an engineering encroachment permit, which carries a $15 file maintenance fee.
  • Fire. Arvin is one of the contract cities served by the Kern County Fire Department, whose Fire Prevention Unit applies the fire code during plan review and enforcement.

Arvin permit costs and fees

Building fees come from the Building Services Fee Schedule adopted by Resolution 2018-45 on June 19, 2018 and in effect since August 20, 2018. Permit fees use the valuation tables of the 1997 Uniform Administrative Code raised by 60% for inflation from 1997 to 2017, with valuation taken from the published building valuation data. Fees are paid when the application is submitted or before issuance, and work not covered by the schedule is billed at contract cost plus 15% or staff cost plus 45%.

Arvin building fees (Resolution 2018-45)
ItemFee
Valuation $1 to $500$37.60
Valuation $25,001 to $50,000$626.80 for the first $25,000 plus $16.16 per added $1,000
Valuation $50,001 to $100,000$1,030.00 for the first $50,000 plus $11.20 per added $1,000
Valuation $100,001 to $500,000$1,590.00 for the first $100,000 plus $8.96 per added $1,000
Plan check65% of the building permit fee
Permit issuance$41.60 per permit (combined permits may share one fee)
Residential solar, 10 kW or less$398.92
In-ground pool, standard / non-standard plans$183.84 / $220.96 ($284.73 commercial)
Residential re-roof$125
Water heater / furnace$30 / $50
Second and later re-inspection$45 each
Demolition permit (includes issuance and septic abandonment)$50
Permit extension1st 180 days $41.60; 2nd: half the original permit fee
Signs: wall / single pole / double pole$30.27 / $99.77 / $112.10
Appeal to the Board of Building Code$1,500 deposit
Maintenance fees on building permits$25 code maintenance plus $4.50 file fee (residential) or $12 (commercial, industrial, multifamily)

Rather talk it over?

Call 1-855-478-4290 →

Worked example from the schedule itself: a 1,000-square-foot wood-frame house valued at $116.15 per square foot (the August 2017 valuation figure) is $116,150. Table 3-A gives $1,590.00 for the first $100,000 plus 17 × $8.96 for the remaining $16,150 (each $1,000 or fraction), a permit fee of $1,742.32; plan check at 65% adds $1,132.51. Electrical, plumbing and mechanical permit fees are added from Tables 3-B to 3-D, along with the $41.60 issuance fee, maintenance fees and the state strong-motion fee of $13 per $100,000 for houses. Valuation figures are updated every six months, so a 2026 application will use a newer figure than the example. The schedule’s rows for jobs valued under $25,000 contain figures that do not add up consistently, so ask the division to confirm the fee for a small job. The maintenance fee sheet also lists general plan maintenance charges of $0.022 or $0.005 per square foot of lot area, which staff calculate when an application is submitted.

Trade permits and who may pull them

Electrical, plumbing and mechanical permits are priced from Tables 3-B, 3-C and 3-D of the fee schedule, each with its own issuance fee (the electrical table lists $37.60 for issuing an electrical permit and $11.60 for a supplemental one). For a new single- or two-family house the electrical fee is figured per square foot of floor area.

  • Contractors: the city asks contractors to provide workers’ compensation insurance information and a valid contractor’s license. California contractors are licensed by the CSLB, and a license is needed for jobs of $1,000 or more in labor and materials, or any smaller job that needs a permit.
  • Arvin business license: required for contractors using SolarAPP+, along with a current state contractor’s license.
  • Owner-builders: Arvin posts the state’s 2009 owner-builder requirements (AB 2335) in English and Spanish and asks owners with questions to call 661-854-2822 before applying.

Rather not deal with the building department?

Get a free quote →

How to apply for an Arvin building permit

1. Confirm the parcel is in the city

Parcels outside the city limits are permitted by Kern County.

2. Get zoning clearance

Check setbacks and use with the Planning Division at 661-854-2822.

3. Prepare plans

Site, floor and structural plans, energy documents, and stamped plans and calculations for commercial or non-conventional work.

4. Apply on the city portal

Create an account on the City of Arvin permit portal and upload the application and plans.

5. Pay fees

The schedule calls for fees to be deposited when you submit, and for any added fees to be paid before the permit is issued.

6. Pick up the approved set

Keep the stamped plans on the job site for every inspection.

Review, corrections and what causes delay

The city’s process page asks for at least three plan sets: one stamped set comes back to you, one stays with the city, and an extra floor plan goes to the assessor’s office. The older 2009 requirements handout still says two sets, so confirm the count when you file. Projects stall when plans are not complete enough to build from, when commercial or non-conventional plans lack a licensed designer’s stamp or structural calculations, or when a deposit for hourly work runs low: if a deposit falls below 15% of the original amount, all work stops until it is topped up. An application withdrawn in writing before plan check starts carries an $80 termination fee.

Inspections in Arvin

Schedule inspections by calling the Building Division at 661-854-2822 with your permit number. The approved plans must be on the job site for every inspection, or the inspector will not perform it, and SolarAPP+ jobs need the approved SolarAPP+ plans, the Arvin permit and the job card on site. A replacement job card costs $50.

The first re-inspection is included; the second and each later re-inspection for faulty or incomplete work costs $45, payable before the next inspection is called. A certificate of occupancy survey, which decides what changes a building needs to qualify for a new type of occupancy such as a garage conversion, is billed hourly against a $350 deposit. Work found without a permit is investigated at time-and-materials cost against a $500 deposit.

Want this handled start to finish?

Get a free quote →

California building code in Arvin

Arvin applies the state code through its own Building Division and Municipal Code, including its residential solar chapter. FEMA’s Community Status Book lists the City of Arvin (community 060076) as participating in the National Flood Insurance Program, with flood maps effective September 26, 2008.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Arvin building permit FAQs

Do I need a permit for a small shed in Arvin?

Not if it is under 120 square feet measured eave to eave; larger structures need a permit.

How much is a building permit for a new house?

It is based on valuation; the city’s own example, a 1,000-square-foot house valued at $116,150, comes to $1,742.32 plus $1,132.51 for plan check, before trade, issuance and maintenance fees.

How many plan sets do I submit?

The process page asks for at least three, plus an extra floor plan for the assessor’s office.

How do I schedule an inspection?

Call the Building Division at 661-854-2822 with your permit number, and keep the approved plans on site.

Does a re-roof need a permit?

Yes. A residential re-roof is a $125 flat-fee permit.

Does Arvin have pre-approved ADU plans?

Yes. Free plan sets for single-story detached ADUs come in three floor plans and two designs.

Can my solar contractor use SolarAPP+?

Yes, if the contractor holds an Arvin business license and a current state contractor’s license.

When is the office open?

Monday to Thursday 8 a.m. to 5 p.m., and every other Friday from 8 a.m. to 4:30 p.m.

Arvin permit search and official resources

Applicants create an account on the city’s permit portal to apply, and SolarAPP+ applicants log in to the same account to upload revisions and pay online. For older permits or plans, the fee schedule allows plan searches for reference or duplication where the law permits, at $19.20 per search plus actual cost and 45%; ask the Building Division at 661-854-2822. The city also sells a monthly summary of building permits issued, at $19.20 a month or $9.60 in electronic form.

Inspections are where schedules slip.

Get a free quote →

Simplify Arvin permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Arvin sooner?

Let Alliance prepare, file, and track your Arvin permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Arvin permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.