In Marion, the Community Development & Planning Department inside City Hall (870-739-5410) issues permits for homes, commercial buildings and every trade, from driveways and fences to plumbing and HVAC. A new house is charged $0.15 per square foot under Ordinance 628 of October 2024, and no work may start until the permit is paid for and approved.
Who issues building permits in Marion?
Permitting sits with the Community Development & Planning Department, which also runs city planning and issues privilege licences for storefront and home businesses. Freddie Thorne III is the City Planning & Community Development Director. City Hall can also confirm whether a contractor holds a valid Marion privilege licence.
| Office | Contact |
|---|---|
| Community Development & Planning (permits) | City Hall, 31 East Military Road, Marion, AR 72364; 870-739-5410; planning@marionarkansas.org |
| City Hall hours | Monday to Thursday 8:00 a.m. to 4:30 p.m.; Friday 8:00 a.m. to 4:00 p.m. |
| Fire Department | 870-739-4127 |
| Water & Sewer Department | 870-739-3073 |
Marion permit types
A permit is needed to erect, alter or enlarge any structure, and to install, alter, repair or replace electrical, gas, mechanical or plumbing systems. The City publishes a separate form for each permit:
Building and site
- Building (residential) and commercial building
- Roofing
- Storage building
- Slab and driveway
- Fence and swimming pool
- Demolition
- Sign
- Directional bore under streets or rights-of-way
Trades
- Electrical and commercial electrical
- HVAC and commercial HVAC
- Plumbing and gas
- Sprinkler system with backflow preventer
Short on time to read all of this?
Get a free quote →Subcontractors pull their own electrical, mechanical, plumbing and gas permits; the building permit does not cover them.
Marion permit fees
The adopted schedule is Ordinance 628, passed on October 22, 2024, which replaced the City’s earlier fee ordinances. Payment goes in with the application.
| Permit | Fee |
|---|---|
| New residential structure (no state Health Department approval needed) | $0.15 per sq ft |
| Commercial or multi-family building | $0.18 per sq ft, $200 minimum, plus plan review of 6% or $200, whichever is greater |
| Industrial building | $0.18 per sq ft, $200 minimum, plus the same plan review fee |
| Remodeling and other construction | $1.50 per $1,000 of value, $75 minimum |
| Storage building | $0.15 per sq ft, $45 minimum |
| Demolition | $0.10 per sq ft |
| Fence | $55 for the first 250 linear feet plus $2.25 per additional 100 feet |
| Swimming pool | $25 (up to $1,000) to $200 (over $20,000) |
| Roofing | $50 for the first 30 squares plus $2 per additional square |
| Driveway / slab / sprinkler | $45 / $50 / $50 |
| Sign | $1.25 per sq ft, $65 minimum |
| Second re-inspection and after | $100 each (one re-inspection is free) |
| Work started before the permit | Double the permit fees |
The permit forms, updated December 1, 2024, print several figures that differ from the ordinance: the building form sets a $45 minimum for new construction (the ordinance has none for houses) and a $45 remodeling minimum (the ordinance says $75); the in-city gas permit is $40 on the form and $45 in the ordinance; the residential electrical form charges $5 for the first circuit (ordinance $3.50); the commercial electrical form charges $3, $1.50 and $1 per circuit (ordinance $5, $2.50 and $1.50); the commercial plumbing rate for 5–9 openings is $30 on the form and $80 in the ordinance; and the roofing form charges by the 100-sq-ft square where the ordinance text says square feet. The building form also adds $90 for trash cans for a new home. Ordinance 628 is the adopted schedule.
Not sure this scope needs a permit?
Get a free quote →Electrical, plumbing, gas and HVAC permits in Marion
Every contractor must show proof of licensing to get a permit. A homeowner may do the work on their own primary residence without a licence, but still needs the permits and inspections.
| Permit | Fee |
|---|---|
| Electrical application, per meter base | $40 residential; $50 commercial or industrial |
| Electrical service | $5 for the first 100 A; $3 per 100 A up to 1,200 A; $2.50 per 100 A above |
| Electrical circuits, residential | $3.50 first; $2 each for 2–10; $1.50 each over 10 |
| Electrical circuits, commercial | $5 first; $2.50 each for 2–10; $1.50 each over 10 |
| Plumbing, 1–4 openings | $55 residential (the ordinance text says $65); $70 commercial |
| Plumbing, 5–9 openings | $25 residential; $80 commercial (the form prints $30) |
| Plumbing, 10–30 openings | $33 to $57 residential; $38 to $66 commercial, in four bands |
| Gas, up to 4 openings | $45 in the city; $50 outside; $2.25 per extra opening |
| HVAC, residential | $55 per unit |
| HVAC, commercial | $50 for a 5-ton system; plus $40 for 6–10 tons; plus $5 per ton over 10 |
Electrical permit fees include the rough and final electrical inspections. HVAC applications must include a Manual J load calculation and duct layout. Sewer and water connection fees are separate from the plumbing permit.
Rather talk it over?
Call 1-855-478-4290 →What Marion’s forms ask for
- Building permit: stories, class of work (new, addition, remodel), total square feet under roof, heated square feet, estimated cost, lot, block, subdivision, street address, setbacks and the contractor’s licence number.
- Commercial building permit: the contractor, owner, architect and engineers with their Arkansas licence numbers, zone, use group, construction type, floor areas, parking spaces and setbacks; the form is signed off by the utilities director, fire chief and building inspector.
- Roofing: the contractor’s roofing licence number plus proof of insurance and bond before the permit is issued.
- Fence: one copy of the plot plan with the fence drawn on it; a licensed surveyor must stake the property lines before work starts.
- Directional bore: a map (at least a Google Earth map, not a sketch), the contractors’ Arkansas licence numbers, and a bore profile after completion.
A permit becomes void if work does not start within 6 months or stops for 6 months after it starts.
How to get a permit in Marion
Confirm the zoning, setbacks and flood zone, and whether the lot is affected by the 2026 residential permit moratorium.
Download the form for each permit from the City’s Permit & Inspections page; each trade files its own.
Add the plot plan, Manual J and duct layout, insurance or bond, or bore map the form asks for.
Bring the application to City Hall or mail it with a check to Marion City Hall, 31 Military Road, Marion, AR 72364.
Work may not begin until the permit has been paid for and approved.
Request each inspection before work is covered, and pass the final before anyone moves in.
Rather not deal with the building department?
Get a free quote →Marion inspections
All inspections must be requested and performed before the work is covered by insulation or finish materials, and the final inspections must be done before occupancy. The building permit form lists the stages: site, footings, slab, rough plumbing, interior plumbing, temporary electrical, electrical, electrical connection, gas, mechanical, framing and final. Roofers must call for a felt inspection before installing shingles.
If an inspection fails, the City allows time to correct the work and one re-inspection is included; each further re-inspection costs $100 and must be paid before the inspector returns.
Local details that matter in Marion
Floodplain: under the Flood Damage Prevention Code adopted by Ordinance 526 in 2011, the City’s code enforcement officer is the floodplain administrator and a Floodplain Development Permit is required for any development in a Special Flood Hazard Area. In AE zones the top of a new home’s lowest floor must be at least 2 ft above the base flood elevation, shown on an elevation certificate from an Arkansas-licensed engineer, surveyor or architect; commercial buildings are elevated 2 ft or floodproofed to 3 ft above it. Basements are prohibited in flood hazard areas, and the Planning Commission hears appeals. Marion participates in FEMA’s National Flood Insurance Program.
Want this handled start to finish?
Get a free quote →Site rules printed on the forms: pools need a permanent wall or fence at least 6 ft high and must sit at least 10 ft from side and rear lot lines; storage buildings must stand 5 ft from rear and side lines and cover no more than 30% of the required rear yard; fences need a 3-ft clear opening where they cross a utility or drainage easement; boring under a road without a permit carries a $400 penalty per bore site.
Planning Commission: meets on the first Tuesday of each month at 6:00 p.m. at 14 East Military Road; contact the Planning Department to be placed on the agenda.
Arkansas building code
Arkansas’s building code is the 2021 Arkansas Fire Prevention Code, adopted by the State Fire Marshal and in force statewide since 1 January 2023; building permits are issued locally where a city or county runs a permit program, and the plumbing, gas, mechanical, energy and electrical codes are adopted by separate state agencies. The Arkansas codes
Frequently asked questions about Marion permits
Who issues building permits in Marion?
The Community Development & Planning Department at City Hall, 31 East Military Road (870-739-5410).
How much is a building permit for a new house in Marion?
$0.15 per square foot under Ordinance 628, with separate electrical, plumbing, gas and HVAC permits pulled by each trade.
Do I need a permit for a fence, shed or new roof?
Yes. Marion has separate fence, storage building and roofing permits; a fence starts at $55, a storage building at $45 and a re-roof at $50.
Can a homeowner pull permits in Marion?
Yes, for work on their own primary residence; the owner may do the work without a licence but must still get the permits and inspections.
Is Marion issuing permits for new houses?
Resolution 2026-07, adopted on March 24, 2026, paused permits for new houses on lots of record in certain areas for six months, which runs to around September 24, 2026. No extension appears in the minutes posted through August 25 or on the September 22 agenda; ask the Planning Department whether it still applies to your lot.
What happens if I start work without a permit?
The permit fees are doubled.
Inspections are where schedules slip.
Get a free quote →Official Marion permit resources
- Marion Permit & Inspections page and permit forms
- Marion building permit application (fees on form)
- Marion electrical permit application
- Marion plumbing and gas permit application
- Marion roofing permit application
- Marion ordinance library (Ordinances 526 and 628)
- Marion building codes in use
- Marion Planning Commission
- Marion City Council agendas and minutes
Simplify Marion permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Arkansas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Marion sooner?
Let Alliance prepare, file, and track your Marion permits while your crew stays on the job.
More Arkansas permitting guides
This guide is provided by Alliance Permitting for general information about Marion permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.