Municipal Guide Arizona Santa Cruz County · Arizona

Santa Cruz County Building Permit — Filed & Tracked For You

Everything contractors, builders, and developers need to pull a Santa Cruz County building permit — the Building Department's published plan review percentages, the four-day week and the counter cut-off an hour before closing, the grading permit that only issues alongside a building permit, the bond exemption certificate the department asks every contractor for, and the stamped engineering solar requires here.

Authority: Santa Cruz County Building DepartmentFees: Plan review is a published share of the permit feeHours: Seven to six, Monday to Thursday; counter closes at five
Plan review
A published percentageDue at submittal, non-refundable
Hours
Monday to ThursdayCounter stops at five p.m.
Grading
Bundled with buildingAbove the volume threshold
Solar
Stamped engineeringGravity and uplift loads

Building permits in unincorporated Santa Cruz County are issued by the Building Department within Community Development, which provides plan review, inspection and investigative services. The department publishes more of its own rules than most rural Arizona jurisdictions — the plan review percentages, the grading threshold, the counter cut-off and the solar engineering requirement are all stated up front.

This guide covers what requires a permit in unincorporated Santa Cruz County, the published plan review percentages and when they are payable, the four-day week and the five p.m. counter cut-off, the grading permit that only issues alongside a building permit, the bond exemption certificate the department asks for, and the contracted review the department provides to some cities.

This guide covers unincorporated Santa Cruz County. The City of Nogales and other municipalities run their own departments.

📍

The counter closes an hour before the office does. The Building Department observes hours from seven a.m. to six p.m. Monday through Thursday, but because of the time required to accept or issue a building permit, no applications are accepted and no permits issued after five p.m. Combined with the four-day week, that leaves a narrower filing window than the published hours suggest — plan counter visits for early in the week and well before five.

What requires a permit in Santa Cruz County?

The Santa Cruz County Building Department, part of Community Development, provides plan review, inspection and investigative services for construction in the county. The department describes its own remit with unusual precision: it serves builders, developers and homeowners who build within the lawfully designated unincorporated areas of Santa Cruz County where the building code applies. That qualifying phrase is worth noticing — in Arizona, county building code coverage is a matter of local adoption rather than a statewide given, so confirm with the department that the code applies to your parcel before assuming.

The department's reach is wider than the unincorporated county alone. It also provides inspection, plan review and investigative services to those cities that have entered into intergovernmental agreements with the county for building code services, and it provides plan review and inspection for county construction projects. That contracted-service arrangement is a recognisable Arizona pattern, and it means the answer to who reviews your plans is not always the same as who has jurisdiction over the land.

Alongside the building code the county administers a Zoning and Development Code regulating zoning matters and setbacks for structures, with a Planning and Zoning Commission granting conditional use permits at public hearing. Building and Planning sit together under Community Development, so a submittal that satisfies the building code but not the development code will still come back.

One further local ordinance touches most site work. The county has a Landscape Ordinance in effect, and the application package includes a signed and dated Landscape Form by which the owner or builder acknowledges that all disturbed areas will be re-seeded if required. It is a small piece of paper attached to a real obligation on the finished site.

Permit required

  • New residential and commercial construction, additions and alterations
  • Structural alterations, relocation and demolition
  • Grading above the published volume threshold, permitted with the building permit
  • Solar photovoltaic systems, with stamped engineering
  • Manufactured home placement and accessory structures
  • Electrical, plumbing and mechanical work
  • Swimming pools and spas, with barrier compliance
  • Work in areas covered by the county's zoning and development code requirements

Typically exempt

  • Purely cosmetic finish work that alters no regulated system
  • Like-for-like minor repairs that do not affect structure
  • Routine maintenance that does not extend or reroute a regulated system
  • Work outside the areas where the county building code applies, subject to confirmation
⚠️ The plan review fee is a published percentage, it is due at submittal, and it is non-refundable. Santa Cruz County assesses plan review as a set share of the building permit fee — a lower share for one and two family dwellings and accessory structures, and a higher share for everything else — payable at the time of application submittal, in addition to the permit fee. Because it is non-refundable and paid up front, an application withdrawn or abandoned after submittal does not get that money back. Make the go or no-go decision before you file, not after.

Santa Cruz County building department: who handles permitting

The Building Department works a four-day week, observing business hours from seven a.m. to six p.m. Monday through Thursday. There is a second timing rule inside that: because of the time required to accept or issue a building permit, no applications are accepted and no permits issued after five p.m. The counter therefore closes an hour before the office does, which is exactly the kind of detail that costs a wasted trip if you arrive at half past five with a complete package.

The department publishes a Notice to Contractors asking that you supply it with a copy of your annual bond exemption certificate. That is the same state revenue document required at issuance in some Arizona municipalities, and it is not something most contractors carry to hand — it comes from a state agency rather than the county. Sort it out before your first filing here rather than at the counter.

The department has also published that it no longer sends mailed reminders of building permit expiration. On a slow-moving rural job that is a meaningful change of practice: the responsibility for tracking the permit's expiry now sits entirely with the permit holder, and an expired permit discovered late is a considerably more expensive problem than a renewed one.

Santa Cruz County permitting contact
DetailInformation
AuthorityBuilding Department, Community Development
Office2150 North Congress Drive, Nogales, AZ 85621
Building permits and inspections(520) 375-7880
Office hoursSeven a.m. to six p.m., Monday through Thursday
Application and issuance cut-offFive p.m., an hour before the office closes
Plan review feeA published percentage of the permit fee, due at submittal, non-refundable
Grading thresholdGrading above the published volume requires a permit
Contractor documentAnnual bond exemption certificate requested by the department
Expiry remindersNo longer mailed; tracking sits with the permit holder
Also servesCities under intergovernmental agreement, and county projects
💻

Grading is bundled into the building permit, and it will not issue on its own. A grading permit is required in Santa Cruz County for grading above the published volume threshold, and that permit is included with the building permit — the county states that grading permits shall only be issued in conjunction with building permits, except where the grading falls under the Planning and Zoning department's jurisdiction or in special cases approved by the Building Official. Where a grading permit is required the applicant submits two complete sets of grading plans showing the areas to be graded. Plan the earthwork and the building submittal as one package.

The county is not the City of Nogales, even though they share an address book. Nogales runs its own building department at its own address with its own phone number and adopted codes, and the county office is a short distance away in the same city — which makes this an easy misfile. Complicating it further, the county also provides building code services under contract to municipalities that have signed intergovernmental agreements with it, so in some cases county staff review plans for land the county does not have jurisdiction over. Confirm both the jurisdiction and the reviewing office.

Santa Cruz County permits: record types and what each covers

The record catalog here is compact, but two entries carry conditions that shape a project's cost before the permit is even assessed: grading above the threshold, and solar with its engineering requirement.

Residential permit types

Residential permit types in Santa Cruz
Permit typeWhat triggers itReview pathFee basis
New constructionNew dwellings, additions, and accessory structures above the local size thresholdPlan review against the jurisdiction's adopted residential code and local amendments, plus zoning and setbacksValuation-based
AdditionAdded conditioned or unconditioned space attached to an existing dwellingStructural and energy review; most of Arizona sits in a hot-dry climate zone, so envelope and equipment sizing draw attentionValuation-based
Renovation / alterationStructural changes, layout changes, or added plumbing, mechanical, or electricalPlan review scaled to scope; a change that alters egress, structure, or a system is reviewed even where the footprint does not moveValuation-based
ReroofRoof covering replacement, recover, and structural deck repairDeck and dry-in inspection; plan review rarely required, but a change of assembly type can trigger a structural checkValuation or squares
Solar photovoltaicRooftop or ground-mount arrays, with or without battery storageSingle local review covering both the structural attachment and the electrical scope; there is no separate state electrical record in ArizonaFlat or system-size based
Battery energy storageWall or floor-mounted storage added to a dwellingElectrical review plus fire separation, ventilation, and location checkFlat or per-permit minimum
ElectricalService changes, panel upgrades, new circuits, EV chargers, meter sets, and rewiringLocal trade review and local inspection against the National Electrical Code edition the jurisdiction has adoptedPer-permit or per-device
PlumbingNew piping, repipes, fixtures, gas piping, and water heater replacementLocal trade review; performed by a contractor holding the matching Registrar of Contractors specialty classificationPer-permit minimum or per-fixture
Mechanical / HVACChangeouts, new ductwork, and refrigerationLocal trade review; changeout volume is heavy in Arizona given summer design temperaturesPer-permit minimum or per-unit
Patio cover and shade structureAttached and detached covers, ramadas, and carportsStructural review for wind uplift and attachment, plus zoning for setbacks and lot coverageValuation or flat
Swimming poolIn-ground and above-ground pools and spasBarrier, bonding, and electrical review; Arizona sets a statewide minimum pool barrier standard that applies on top of local rulesValuation or flat
Manufactured home set-upPlacing or re-siting a manufactured or modular homeState plan approval through the Arizona Department of Housing, with local zoning, floodplain, foundation, and utility connection reviewFlat or per-unit
DemolitionFull or partial demolition of a dwelling or accessory structureUtility disconnect confirmation, dust control where earthmoving is involved, and site restoration checkFlat
Landscape formIncluded in the application package on most site workSigned acknowledgement of the county's landscape ordinance obligationsNo separate charge
Grading permitGrading above the county's published volume thresholdTwo complete sets of grading plans; issues only with a building permitIncluded with the building permit

Commercial permit types

Commercial permit types in Santa Cruz
Permit typeWhat triggers itReview pathFee basis
New commercial constructionGround-up commercial, industrial, and institutional buildingsConcurrent review against the jurisdiction's adopted building code and amendments, plus fire and zoningValuation-based
Tenant improvement / upfitInterior fit-out of an existing tenant spaceBuilding, trade, and life-safety review; accessibility attaches on change of useValuation-based
Change of occupancyConverting a building or space to a different use groupOccupancy classification, egress, and accessibility reviewValuation or flat
Commercial electricalService, distribution, and branch circuit workLocal trade review and local inspection; Arizona has no central state electrical permit for either residential or commercial workPer-permit or valuation
Commercial plumbingProcess piping, fixtures, backflow, and grease wasteLocal trade review; backflow and grease interceptor sign-off where applicablePer-fixture or valuation
Commercial mechanicalRooftop units, kitchen exhaust and hood systems, and refrigerationLocal trade review; hood and suppression systems draw fire review alongside mechanicalPer-unit or valuation
Commercial reroofRoof covering replacement on a commercial structureDeck, dry-in, and attachment inspectionValuation or squares
SignageWall, ground, and illuminated signsZoning review for size and placement, plus electrical where illuminatedFlat or per-sign
Grading and drainageClearing, grading, and site work that alters drainageCivil review of grading and drainage, separate from the building permit; monsoon-season flows drive the designAcreage or valuation
Dust control permitEarthmoving, trenching, and construction dust on a qualifying siteCounty air quality department, not the building department; required in the fine-particulate nonattainment areasCounty air quality fee schedule
Commercial demolitionFull or partial demolition of a commercial structureUtility disconnect, asbestos notification, dust control, and site restorationFlat or valuation
Conditional use permitUses requiring discretionary approval under the development codeGranted at public hearing by the Planning and Zoning CommissionPer the county's adopted fee provisions
Contracted city plan reviewMunicipalities under intergovernmental agreement with the countyCounty staff provide plan review and inspection under the agreementPer the terms of the agreement

Residential

  • Building and trade permits are issued and inspected by the same local authority
  • There is no separate state electrical permit — electrical is a local record
  • A Registrar of Contractors licence is required whenever a permit is required, at any job value
  • Properties on septic need on-site wastewater approval before ground is broken

Commercial — multi-discipline

  • Concurrent review across building, trades, fire, and zoning
  • Signed and sealed plans across every affected discipline
  • The licensee's classification must match the actual scope of work
  • Accessibility and life-safety review attach to any change of occupancy

Records you will actually see in Santa Cruz

Santa Cruz record catalog
RecordWhat it covers
Building permitNew construction, additions, alterations, relocation and demolition
Grading permitGrading above the published volume, issued in conjunction with the building permit
Solar photovoltaic permitArrays requiring stamped engineering for gravity and uplift loads
Trade permitElectrical, plumbing and mechanical work by the licensed contractor
Manufactured home placementPlacement reviewed against the county's adopted standards
Conditional use permitGranted at public hearing by the Planning and Zoning Commission
Zoning and development code reviewSetbacks and land use under the county's development code
Landscape formSigned acknowledgement of the county's landscape ordinance obligations
Contracted city reviewPlan review and inspection for cities under intergovernmental agreement

Solar permits in Santa Cruz

Solar is reviewed on two tracks in Arizona, but unlike some neighbouring states both tracks belong to the same government. The structural side — attachment detail, rail spacing, and whether the existing framing carries the added dead load — and the electrical side — conductors, overcurrent protection, rapid shutdown, labelling, and the service or supply-side connection — are both permitted and inspected by the local Authority Having Jurisdiction. There is no state electrical record to buy alongside the local one, and no state inspector to book.

Santa Cruz County states its solar requirement directly, and it is firmer than most: solar permits require stamped engineering for gravity and uplift loads. That puts an engineer in the project team from the outset rather than as a response to a correction comment, and it should be budgeted alongside the array rather than treated as a contingency. The electrical scope stays with the county because Arizona has no state electrical permit, and interconnection runs on the serving utility's own timetable.

What varies instead is the code edition. Because each Arizona city, town and county adopts its own editions on its own timetable, the National Electrical Code edition your array is judged against in one jurisdiction may not be the one enforced a few miles away. The Office of the State Fire Marshal sets a minimum electrical standard for the state, but the edition actually enforced is the local one. Confirm it with the jurisdiction before the design is finalised rather than after a correction notice.

Interconnection runs on a third clock and is not something the building department controls. Arizona properties are served by utilities including Arizona Public Service, Salt River Project, Tucson Electric Power and UniSource, alongside municipal utilities and irrigation districts, and each sets its own application, meter and witness-test sequence. Permission to operate follows the utility's process on the utility's schedule, so plan for the tracks to finish at different times.

Roofing permits in Santa Cruz

A roof covering replacement needs a permit in most Arizona jurisdictions, and the assumption that a like-for-like replacement is exempt travels badly here. The permit is usually quick, but the inspection that matters happens before the covering goes on rather than after.

Arizona operates no statewide product-approval database, so there is no approval number to search for or cite on the application. The assembly has to comply with the edition of the code the jurisdiction has adopted and with the manufacturer's listed installation instructions, and that pairing is what the inspector checks — which makes the manufacturer's instructions a document worth having on site.

Re-roofing follows the ordinary sequence with the deck available for inspection before the covering goes on. The scheduling constraint here is the four-day week: with the office open Monday through Thursday, a failed inspection late in the week cannot be re-inspected until the following Monday, which on an open roof is a long time to be exposed. Book early in the week, and remember that the permit's expiry is now yours to track since the county no longer mails reminders.

Two Arizona-specific pressures shape the work. Sustained summer heat and ultraviolet exposure age a covering faster than the same assembly would age in a milder climate, and monsoon-season wind and driven rain test the fastening and the flashing details rather than the field of the roof. Sequencing is where reroofs go wrong regardless: the deck and dry-in condition has to be visible when the inspector arrives, so covering it first means opening it back up.

Record types, document sets, and fee structures are set by local ordinance and change without notice. Confirm the current catalog against the official portal before you file.

Santa Cruz County permit cost

Santa Cruz County is one of the more transparent Arizona jurisdictions on plan review cost, because the percentages are published rather than quoted. Plan review is assessed as a set share of the building permit fee, at a lower rate for one and two family dwellings and accessory structures and a higher rate for all other work, and it is due at the time of application submittal, is non-refundable, and is in addition to the permit fee.

Two further items belong in an early budget. Where grading exceeds the published threshold the grading permit is included with the building permit but the two complete sets of grading plans are a real design cost. And solar work here requires stamped engineering, which is an engineering fee rather than a permit fee but is no less certain.

How Santa Cruz fees are structured
Fee componentHow it works
Building permit feeAssessed under the county's adopted fee provisions
Plan review, dwellings and accessory structuresA published lower percentage of the permit fee
Plan review, all other workA published higher percentage of the permit fee
When plan review is dueAt the time of application submittal, and non-refundable
Grading permitIncluded with the building permit above the volume threshold
Solar engineeringStamped engineering for gravity and uplift loads, borne by the applicant
Re-inspectionCharged where an inspection has to be repeated
🧮

Want a precise number for a specific Santa Cruz project? Send us the scope and we will price the permit path before you file.

Santa Cruz County trade permits

The trades are permitted and inspected by the county under its adopted codes, and every contractor on the job is expected to hold a current Registrar of Contractors licence, with the general contractor identifying its subcontractors and their licence details on the application.

Electrical permits

Required for service work, panel changes, photovoltaic systems and most wiring alterations. Arizona has no state electrical permit, so the record stays with the county. Where the department is providing review under an intergovernmental agreement rather than as the land use authority, confirm which entity's adopted code applies.

Plumbing permits

Required for new piping, repipes, fixtures and water heaters. On rural parcels the plumbing scope connects to on-site wastewater, which is regulated under the state's delegated framework rather than the building code, so establish the wastewater path early on any parcel without a public sewer connection.

Mechanical permits

Required for heating, ventilation and air-conditioning work, ductwork and refrigeration. Santa Cruz County sits at higher elevation than the low desert, so the heating side of the load is more significant here than in Yuma or Lake Havasu City and should not be sized from a Valley assumption.

Solar photovoltaic work

The department states directly that solar permits require stamped engineering for gravity and uplift loads. That is a firmer requirement than many Arizona jurisdictions apply, and it means an engineer is in the project team from the start rather than being brought in if the reviewer asks. Budget the engineering alongside the array.

🧢 Arizona licenses contractors through the state Registrar of Contractors (the ROC), and the rule is uniform across the state: a licence is required whenever a job's labour and materials exceed one thousand dollars, or whenever a building permit is required at all — a permitted job needs a licensed contractor regardless of its dollar value. The ROC licence is a state licence that is valid statewide, so there is no separate city or county contractor licence, though a municipality may require its own business licence. The one thousand dollar exemption covers only work that both stays under that combined labour-and-materials figure and does not require a permit. The moment a permit is required, a licensed contractor is required, whatever the price.

Santa Cruz County permit application: how to apply step by step

Here is how to get a building permit in Santa Cruz County, from confirming the requirement through to close-out. Each step below corresponds to a real decision point where projects commonly stall.

1. Confirm jurisdiction and whether the code applies

Establish that the parcel is in the unincorporated county rather than Nogales or another municipality, and confirm with the department that the building code applies to that area — the department's own description is careful on this point.

2. Get the bond exemption certificate in hand

The department asks contractors to supply a copy of their annual bond exemption certificate. It comes from a state agency rather than the county, so obtain it before your first filing rather than discovering it at the counter.

3. Scope the grading with the building submittal

Grading above the published volume threshold requires a permit, and that permit is only issued in conjunction with a building permit. Where it applies, prepare two complete sets of grading plans showing the areas to be graded as part of the same package.

4. Budget the plan review before you file

Plan review is a published percentage of the permit fee — lower for one and two family dwellings and accessory structures, higher for everything else — due at submittal and non-refundable. Make the decision to proceed before paying it.

5. File before the counter cut-off

The office runs seven a.m. to six p.m. Monday through Thursday, but no applications are accepted and no permits issued after five p.m. Arrive with time to spare, and remember there is no Friday.

6. Track your own expiry date

The county no longer mails reminders of building permit expiration. Diary the expiry yourself and keep inspections moving, because an expired permit found late costs considerably more than a renewal.

Inspections in Santa Cruz County

Inspections are performed by the Building Department, which also provides investigative services — the department's own framing, and a reminder that it looks into work done without permits as well as inspecting work done with them. Requests go through the building permits and inspections line.

The four-day week is the scheduling constraint to design around. With the office open Monday through Thursday, a failed inspection late in the week cannot be re-inspected until the following Monday. On weather-sensitive work — an open roof, a poured slab, an open trench — book early in the week and leave the site in a condition that can survive a long weekend.

Because the county administers a zoning and development code alongside the building code, and a landscape ordinance alongside both, close-out can raise items that are not building code items at all. Setbacks under the development code and the re-seeding of disturbed areas under the landscape ordinance are both real obligations on the finished site rather than paperwork attached to the application.

Close-out runs through the department's final inspection to occupancy, with the development code and landscape obligations cleared alongside the building items. Given the four-day week and the five p.m. counter cut-off, leave more slack around the final here than a metropolitan programme would assume.

Santa Cruz County permit search and official resources

These are the primary Santa Cruz County and Arizona sources behind this guide. Fee percentages, hours and adopted codes change by Board action, so confirm against these pages before you file.

Frequently asked questions

Do I need a building permit in unincorporated Santa Cruz County?

For most construction, yes. The Building Department provides plan review, inspection and investigative services for construction in the lawfully designated unincorporated areas of the county where the building code applies. That qualifying phrase matters in Arizona, where county code coverage is a matter of local adoption — confirm with the department that the code applies to your parcel.

How much is plan review in Santa Cruz County?

It is a published percentage of the building permit fee: a lower share for one and two family dwellings and accessory structures, and a higher share for all other work. It is due at the time of application submittal, it is non-refundable, and it is in addition to the permit fee itself. Confirm the current percentages with the department before budgeting.

What are the county's office hours?

The Building Department observes business hours from seven a.m. to six p.m. Monday through Thursday. Because of the time required to accept or issue a building permit, no applications are accepted and no permits issued after five p.m. — so the counter effectively closes an hour before the office does, and there is no Friday service.

When do I need a grading permit?

For grading above the county's published volume threshold. The grading permit is included with the building permit, and the county states that grading permits shall only be issued in conjunction with building permits — the exceptions being grading under the Planning and Zoning department's jurisdiction and special cases approved by the Building Official. Where it applies you submit two complete sets of grading plans.

What does the county require for a solar permit?

Stamped engineering for gravity and uplift loads. The department states this directly, and it is a firmer requirement than several other Arizona jurisdictions apply, so an engineer belongs in the project team from the start rather than being added if a reviewer asks for calculations.

What is the bond exemption certificate the department asks for?

A state revenue document. The department publishes a notice asking contractors to supply a copy of their annual bond exemption certificate. It comes from a state agency rather than the county, and most contractors do not carry it to hand, so obtain it ahead of your first filing here. The same document is required at issuance in some Arizona municipalities.

Will the county remind me when my permit expires?

No. The county has published that it no longer sends reminders of building permit expiration in the mail. Tracking the expiry date is entirely the permit holder's responsibility now, which matters most on slow-moving rural jobs where months can pass between phases.

Does the county permit work inside Nogales?

No. The City of Nogales runs its own building department with its own address, phone number and adopted codes, and it is a short distance from the county office in the same city — which makes misfiling easy. Confirm jurisdiction from the parcel rather than the postal address.

Why would county staff review plans for a city?

Because the department also provides inspection, plan review and investigative services to those cities that have entered into intergovernmental agreements with the county for building code services. It is a recognisable Arizona arrangement, and it means the office reviewing your plans is not always the authority with jurisdiction over the land.

What is the landscape form?

A signed and dated acknowledgement, included in the application package, that the county has a landscape ordinance in effect and that all disturbed areas will be re-seeded if required. It is a small piece of paper attached to a real obligation on the finished site rather than a formality at intake.

Do the state accessory dwelling unit rules apply here?

No. Arizona's twenty twenty-four accessory dwelling unit statute sits in the state's cities and towns title and binds municipalities above a population threshold. It does not reach counties at all, whatever the county's population, so accessory dwelling units in unincorporated Santa Cruz County are governed by the county's own zoning and development code.

Who do I name on the application?

Every contractor hired must hold a current licence with the Arizona Registrar of Contractors. Where a general contractor is used, the applicant provides that contractor's name, licence number, address and telephone number, together with the subcontractors and their licence information. Have the full list assembled before you file.

Simplify Santa Cruz County permitting with Alliance Permitting

Santa Cruz County publishes more of its own rules than most rural Arizona jurisdictions — the plan review percentages, the grading threshold, the counter cut-off, the solar engineering requirement. The risk here is not ambiguity, it is arriving without the documents the published rules assume. Alliance Permitting prepares, files and tracks Santa Cruz County permits through issuance.

250K+Permits approved
All 50States covered
21 YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 21 years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Santa Cruz because the work is done by people who have stood at the counter:

  • We get the bond exemption certificate in place before the first filing, not at the counter.
  • We package the grading plans with the building submittal, since grading will not issue alone.
  • We budget the non-refundable plan review percentage before the go decision, not after.
  • We track the permit's expiry ourselves, because the county no longer mails reminders.

Alliance Permitting is a permit documentation and expediting service in Arizona. We are not a law firm and do not provide legal advice, and we are not the permitting authority.

Ready to break ground in Santa Cruz sooner?

Let Alliance prepare, file, and track your Santa Cruz permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Santa Cruz County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.