Putnam County, West Virginia Building Permit Guide

To get a building permit in Putnam County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

In unincorporated Putnam County the Office of Planning & Infrastructure at the Winfield courthouse issues the county development permit, which the county also calls the building permit.

Authority: Putnam County Office of Planning & InfrastructureCode: No county building code; zoning, subdivision and floodplain ordinancesPhone: (304) 586-0237
County office
Planning & Infrastructure12093 Winfield Road, Room 226, Winfield
Minimum fee
$40Floodplain determination on every project
Hours
8:00 am to 4:00 pmMonday to Friday
Own permits
Hurricane, Winfield, NitroAlso Poca and Eleanor

For the unincorporated area, Putnam County’s Office of Planning & Infrastructure issues the development permit, which the county says is also known as the building permit or Improvement Location Permit. It is required before any permanent structure is built or a manufactured home is placed, and every project pays at least the $40 floodplain determination fee.

The permit checks a project against the county’s comprehensive plan, zoning ordinance (in the zoned planning districts), subdivision regulations and floodplain ordinance, under an Improvement Location Permit Ordinance first adopted on May 21, 1992 and last amended on December 13, 2022. The county posts no building code among its ordinances, and the owner is responsible for every other approval, from the Putnam County Health Department, the Division of Highways, the Department of Environmental Protection and the water or sewer provider.

The county permit covers the unincorporated area, including the zoned districts around Teays Valley. Hurricane, Winfield, Nitro, Poca and Eleanor issue their own permits, while Buffalo’s and Bancroft’s permit forms are handled by the county office; see the municipality table under Who handles permitting.

📜

Zoned or non-zoned decides the form. The county has separate development permit applications for its zoned and non-zoned unincorporated areas. If you do not know which applies, call (304) 586-0237 with the tax map and parcel number for a determination.

What requires a building permit in Putnam County?

The county requires a development permit for any man-made change to improved or unimproved real estate, which its FAQ defines to include buildings and other structures, mining, dredging, filling, grading, paving, excavation, drilling and the storage of equipment or materials.

County development permit

  • New houses, duplexes, multi-family buildings, townhouses and condominiums
  • Placing a manufactured home, including a replacement home
  • Room, porch and garage additions
  • Accessory structures such as detached garages, fences and storage buildings
  • Temporary structures, telecommunications towers, bridges and culverts
  • Commercial and industrial development, plus fill and grading without a structure

Other county permits

  • Business permit for a change of land use, with site plan review in zoned areas
  • Sign permits for a new or replacement business sign
  • Special use, temporary use, rezoning and variance applications in zoned areas
  • Subdivision plats, salvage yard permits and adults-only location permits

Dirt work and the floodplain

Any development, dirt work included, on land in the 100-year floodplain needs a permit, and no fill is allowed in the floodway. In the zoned areas, dirt work outside the floodplain may still need engineering data, so the county asks owners to contact the office before starting.

West Virginia lets each county and city adopt the State Building Code or no building code at all; no other building code may be adopted, and floodplain, sewage and fire rules can apply either way. West Virginia rules

Short on time to read all of this?

Get a free quote →

Putnam County building department: who handles permitting

The Office of Planning & Infrastructure handles development permits, floodplain management, subdivision review, zoning in the zoned districts, and the county’s dilapidated and abandoned buildings program. Its director is also the county Floodplain Administrator. Septic systems need a Putnam County Health Department permit, and the county application asks for a copy of it.

Putnam County Office of Planning & Infrastructure
DetailInformation
OfficePutnam County Courthouse, 12093 Winfield Road, Room 226, Winfield, WV 25213
Phone(304) 586-0237; fax (304) 586-0200
Emailplanning@putnamwv.org
HoursMonday to Friday, 8:00 am to 4:00 pm
DirectorDavid Coll, Director (also Floodplain Administrator)
Septic systemsPutnam County Health Department, (304) 757-2541
Planning CommissionMeets in the Old Courtroom, Room 221, at the courthouse

Who issues permits in each municipality

Permit offices in Putnam County’s cities and towns
MunicipalityWho issues permitsPhone
HurricaneCity Building Department at the Hurricane Municipal Building, 3255 Teays Valley Road; permits for every contracting project; the city’s official building code is the 2018 International Building Code(304) 562-5896
WinfieldCity building permits for all construction, remodeling, demolition and electrical or mechanical upgrading; contractors need state and Winfield licences(304) 586-2122
Nitro (mostly in Kanawha County)City Building Department; contractors need a current Nitro business license before applyingCity Hall, 2009 20th Street, (304) 755-0705
PocaTown residential building permit for repairs, remodeling, new construction or demolition; 100 Main Street(304) 755-5482
EleanorTown Application for a Permit to Construct, under Section 1721 of the town code; Town Hall, 401 Roosevelt Boulevard(304) 586-2319
BuffaloTown of Buffalo development permit filed with the county Office of Planning & Infrastructure and approved by the town mayor(304) 586-0237
BancroftThe county’s printable applications include a Town of Bancroft permit; ask the county office for it(304) 586-0237

Not sure this scope needs a permit?

Get a free quote →

Hurricane charges nothing for work under $250, $20 for $250 to $1,499 and $4 for each additional $1,000, and usually turns a permit around the same day unless plan review is needed; plan review takes 7 to 10 business days. Eleanor posted an opening for a town building inspector on July 27, 2026.

Permit types

Residential permits

A house or manufactured home uses the development permit for zoned or non-zoned areas. The form asks for the structure and property owners, the contractor’s WV licence number (and the WV Manufactured Housing Board number for a manufactured home), the tax map and parcel, the water and sewer providers, and the size, foundation, roof and siding of the home. Where the Town of Winfield provides sewer, the town signs off on the form, and a septic system needs a copy of the approved health department permit.

Commercial permits

In the zoned areas, commercial, industrial, multi-family, lease community and manufactured home park applications need a site plan at one inch to 50 feet or larger, three engineer-sealed copies of the stormwater analysis, drainage plan and drainage calculations, a state sediment and erosion control plan, a Division of Highways encroachment permit, water and sewer approvals, and lighting, landscaping, signage and parking plans. In the non-zoned areas the list is shorter: a site plan, an engineer-sealed drainage analysis, plan and calculations, a Division of Highways access permit for a state or county road, a state NPDES stormwater permit when more than one acre is disturbed (a West Virginia Conservation Agency sediment control plan below that), and water, sewer or health department documentation. Both forms recommend a free sketch plan meeting with the office before applying.

Completion deadlines and broadband conduit

Under the Improvement Location Permit Ordinance a residential project must be finished within 24 months and a commercial project within 36 months, or the owner may have to pay a new fee equal to the original. Every new structure must also have a 1¼-inch conduit from the road to the electrical panel or network area, with a working outlet within 3 feet of its end, unless the area is served only by wireless broadband.

West Virginia licenses contractors at state level through the Contractor Licensing Board, run by the Division of Labor, valid statewide. West Virginia rules

Rather talk it over?

Call 1-855-478-4290 →

Putnam County permit costs and fees

The county’s permit fees are in Section 7.9 of its floodplain management ordinance, as amended on July 8, 2025. Construction cost includes labor and materials, the minimum fee is $40, and the ordinance notes that development in the zoned areas may carry higher fees, so call the office for the exact amount before paying. Checks are made out to the Putnam County Commission.

Putnam County development and floodplain fees (amended July 8, 2025)
ProjectFee
Floodplain determination, all proposed development$40
Outside a flood hazard area: grading and filling$1 per $1,000 of construction cost
Outside a flood hazard area: bridge, culvert, stream relocation and all other development$40
Outside a flood hazard area: commercial, industrial, multi-family, leased community$1 per $1,000 of construction cost
In a flood hazard area: house, duplex, manufactured home, additions, grading, commercial and other development$1 per $1,000 of construction cost
Engineering review$500
Appeal of a Floodplain Administrator decision$200 ($100 refunded if reversed)
Work started before the permitFees doubled for the first and second offense, tripled after that

Example: a $250,000 house in a flood hazard area pays the $40 determination fee plus $250 (250 × $1), or $290, before any engineering review or zoned-area charges.

⚠️

Building before the permit costs more. The FAQ warns of a late fee on top of the regular development permit fee, and the floodplain ordinance doubles the fees for a first or second offense and triples them after that.

Trade permits and who may pull them

County development permit

  • A WV contractor licence is required for anyone building a structure, installing a manufactured home, placing fill or grading
  • A WV Manufactured Housing Board number for manufactured home installers
  • The new 1¼-inch broadband conduit ends at the electrical panel with an outlet nearby

Inside the cities

  • Hurricane’s building permit covers electrical and mechanical work, and the city inspects plumbing, HVAC and electrical
  • Winfield requires a permit for electrical or mechanical upgrading and asks for plans for plumbing and HVAC systems
  • Contractors register or hold a city license in Hurricane, Winfield and Nitro

Rather not deal with the Putnam County building department?

Get a free quote →

Trade work is permitted separately where the jurisdiction enforces the code and done by state-licensed contractors. West Virginia rules

How to apply for a Putnam County building permit

1. Check where the parcel is

Inside Hurricane, Winfield, Nitro, Poca or Eleanor, apply to the town. In the unincorporated county, find out whether the parcel is zoned and whether it is in the floodplain (the county parcel viewer or a call to (304) 586-0237).

2. Pick the right county form

Development permit for zoned areas, for non-zoned areas or for a special permit; the Buffalo and Bancroft forms for those towns.

3. Get the septic and utility approvals

A Putnam County Health Department permit for a septic system, the water and sewer provider’s confirmation, and Town of Winfield approval where Winfield provides sewer.

4. Prepare the site plan and engineering

For commercial and multi-family work, the 1 inch to 50 feet site plan, sealed stormwater and drainage documents and the Division of Highways encroachment permit; ask for a free sketch plan meeting first.

5. Submit and pay

Bring or mail the application, fee and documents to Room 226 at the courthouse, 8:00 am to 4:00 pm on weekdays, with a check payable to the Putnam County Commission.

6. Build within the permit’s time limits

The floodplain ordinance requires work to begin within 180 days of issue, and the Improvement Location Permit Ordinance requires a house to be finished within 24 months.

When the floodplain status is unclear

If county staff cannot tell whether a site is in the floodplain, the applicant must have a certified engineer or surveyor decide at the applicant’s expense, and a site in the floodplain then needs a FEMA certification. Elevation certificates must be prepared by a licensed professional land surveyor.

Inspections in Putnam County

During construction the Floodplain Administrator or another authorized official may inspect a development to confirm it matches the permit and the county ordinances, and can issue a stop work order and revoke the permit if it does not. In a flood hazard area no building may be occupied, and no permanent utility connection installed, until the certificate of compliance is issued. Inside Hurricane, inspections need 24 hours’ notice at (304) 562-5896 and cover footings and foundations, framing, insulation, plumbing, HVAC, electrical and the final inspection for the certificate of occupancy.

Want this handled start to finish?

Get a free quote →

Putnam County permit search and official resources

Inspections are where schedules slip.

Get a free quote →

Frequently asked questions

Does Putnam County issue building permits?

Yes, for the unincorporated area. Its building permit is the development permit, also called the Improvement Location Permit, from the Office of Planning & Infrastructure in Winfield. It checks zoning, subdivision and floodplain rules; the county posts no building code.

How much is a development permit in Putnam County?

The minimum is $40, the floodplain determination charged on every project. Grading, commercial work and development in a flood hazard area add $1 per $1,000 of construction cost, an engineering review is $500, and zoned areas may have higher fees.

Do I need a permit to move dirt or add fill?

In the 100-year floodplain, yes: any development, dirt work included, needs a permit, and no fill is allowed in the floodway. In zoned areas outside the floodplain, dirt work may need engineering data, so contact the office first.

How long do I have to finish a house?

24 months from the date the permit is issued (36 months for a commercial project), or the county can charge a new fee equal to the original.

Who issues building permits in Hurricane and Winfield?

Each city does: Hurricane’s Building Department at 3255 Teays Valley Road, (304) 562-5896, and the City of Winfield at (304) 586-2122.

Who approves a septic system?

The Putnam County Health Department, (304) 757-2541. A copy of its approved permit goes with the county development permit application.

Simplify Putnam County permitting with Alliance Permitting

In Putnam County the floodplain permit is the constant and the building code is the variable. We settle the elevation first, because it prices the building for its whole life.

Ready to break ground in Putnam County sooner?

Send us the scope and the parcel. We confirm the review path with the Putnam County Office of Planning & Infrastructure and the municipalities within it, assemble the submittal, file it, and track it through issuance — corrections included.