In Bonney Lake, the Permit Center of the Public Services Department handles environmental, land use, engineering, building, fire and utility permits in one place and inspects the work. Every application, document and plan must be submitted electronically, through the City’s online forms and the Online Permit Portal, and nothing is routed for review until the fees are paid. For electrical work, applicants buy the permit from the Washington Department of Labor and Industries (L&I), whose Tacoma office at 950 Broadway is open by appointment only.
The Permit Center is on the second floor of the Public Services Center, 21719 96th Street East, open Monday to Thursday from 9 a.m. to 4 p.m. and on Fridays by appointment; its main line is 253-447-4356. The City lists November 11, 26 and 27, 2026 as closure days with no inspections. Jason Sullivan is the Public Services Director. Bonney Lake had 22,139 residents in the Census estimate for 2025, and the City’s GIS portal shows whether a parcel is inside the city limits.
What requires a building permit in Bonney Lake?
The City’s building permits page says permits are needed for almost all construction, including new buildings, remodels, tenant improvements, repairs and demolition. Bonney Lake uses the 2021 international codes as amended in chapter 15.04 of the Bonney Lake Municipal Code (BLMC), and the Council changed those amendments in September 2026.
Permit required
- New homes, additions, remodels, ADUs, adult family homes, townhouses and detached garages, carports and gazebos over the exempt size
- Decks that are over 200 sq ft, more than 30 inches above grade, attached or serving a required exit
- Fences over 6 feet, and retaining walls over 4 feet or holding a surcharge (handled with civil permits)
- Demolition of any structure larger than 120 sq ft
- Furnaces, heat pumps, generators, water heaters, backflow devices, re-roofs and solar
No permit (BLMC 15.04 and City page)
- One-story detached accessory structures at a house up to 200 sq ft
- Fences up to 6 feet
- Retaining walls up to 4 feet from the bottom of the footing, without a surcharge
- Decks that meet all four limits: 200 sq ft or less, 30 inches or less above grade measured 3 feet out, detached, not serving a required exit
- Finish work, minor repairs, portable appliances, small above-ground pools and play equipment
What the city decides and what the state holds
Ordinance 1759, adopted September 15, 2026 and effective September 29, 2026, repealed Bonney Lake’s stricter 120 sq ft limit for residential sheds and its extra garage-to-house fire separation rules, so those now follow the state residential and building codes. Two local amendments remain: fences are exempt only up to 6 feet under both codes, and BLMC 15.04.082(E) still deletes the building code’s shed exemption, so accessory buildings regulated by the building code rather than the residential code have no size exemption. The City also sets its own fees, stormwater thresholds and certificate of occupancy conditions.
Short on time to read all of this?
Get a free quote →Washington has a mandatory statewide building code under chapter 19.27 RCW that every city and county enforces and may make stricter; electrical permits come from the Department of Labor and Industries unless the city runs its own program or Tacoma Power serves the site. Building codes in Washington
Bonney Lake building department: who handles permitting
BLMC 15.04.082 makes the Public Services Department responsible for enforcing the building code. Inside the Permit Center, permit technicians handle process questions, planners handle zoning, setbacks, impervious surface, critical areas, trees and signs, building inspectors answer code and fire code questions, and engineers handle civil plans, stormwater and water and sewer availability.
| Detail | Information |
|---|---|
| Office | Permit Center, Public Services Center, 21719 96th St E, 2nd Floor (mailing city Buckley, WA 98321) |
| Hours | Monday to Thursday, 9 a.m. to 4 p.m.; Fridays by appointment only |
| Phone | Main line 253-447-4356; inspection request line 253-447-4357 |
| Online | Online Permit Portal (payments, status, inspections) and City online application forms |
| Electrical permits | Washington Department of Labor and Industries |
| Septic | Tacoma-Pierce County Health Department |
Permit types
Residential permits
Residential building permits cover houses with up to two units, ADUs, adult family homes, townhouses and detached accessory structures, filed on the City’s online residential, ADU or deck application forms with the matching submittal checklist for new construction or for additions and remodels. For accessory structures, the building, mechanical and plumbing parts are reviewed together on one permit and cannot be deferred. An ADU needs a covenant that City staff prepare and that the applicant records with the Pierce County Auditor before final occupancy. Homeowners may draw their own floor and site plans to scale, but any engineering must be done by a Washington-licensed engineer, and every owner with an interest in the property signs the owner authorization form.
Some simple jobs are “web permits”: residential furnaces, generators, heat pumps and water heaters, residential backflow devices, alterations of six or fewer sprinkler heads and sewer permits in pre-approved plats can be applied for and paid online and issued the same or next business day, as long as the contractor holds an L&I contractor license, a state business license and a Bonney Lake business license.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
New commercial buildings, tenant improvements, remodels and multifamily buildings use the commercial or multifamily application and resubmittal forms. Commercial mechanical, plumbing and re-roof permits cannot use the web permit route. Businesses must also complete sewer pre-treatment screening with the Sumner-Bonney Lake Joint Pre-Treatment Program, run from Sumner Public Works, and commercial and multifamily projects normally get a pre-construction meeting with the inspection team before work starts.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
The City asks applicants to check on its GIS portal for critical areas, shoreline jurisdiction, water and sewer providers and road classifications before applying. Critical areas (wetlands, flood hazard, geologic hazard, aquifer recharge and fish and wildlife habitat), SEPA, shoreline, tree removal and land use permits are Planning permits, and certificates of water or sewer availability, utility connections, road approaches and retaining walls are civil and utility permits. Stormwater review follows the July 1, 2021 Pierce County manual and generally applies once a project adds or replaces 500 sq ft or more of hard surface. On a septic lot, the Tacoma-Pierce County Health Department is the agency to contact.
Bonney Lake permit costs and fees
The Council adopted the current City fee schedule as Resolution 26-31 on its consent agenda, 7-0, on April 21, 2026, replacing Resolution 3297; that update changed park parking, concealed pistol license and boat pass fees and left the building fees as they were. The PDF on the City’s fee page still carries the Resolution 3297 heading, with the same building figures. The state building code fee is not itemized in the City’s schedule.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee or rule |
|---|---|
| $1 to $500 of value | $28.20 |
| $501 to $2,000 | $28.20 for the first $500, plus $3.66 per added $100 or part |
| $2,001 to $25,000 | $83.10 for the first $2,000, plus $16.80 per added $1,000 or part |
| $25,001 to $50,000 | $469.50 for the first $25,000, plus $12.12 per added $1,000 or part |
| $50,001 to $100,000 | $772.50 for the first $50,000, plus $8.40 per added $1,000 or part |
| $100,001 to $500,000 | $1,192.50 for the first $100,000, plus $6.72 per added $1,000 or part |
| $500,001 to $1,000,000 | $3,880.50 for the first $500,000, plus $5.70 per added $1,000 or part |
| Over $1,000,000 | $6,730.50 for the first $1,000,000, plus $3.78 per added $1,000 or part |
| Plan review | 65% of the building permit fee; expedited review adds another 65% |
| Mechanical / plumbing with a building permit | 15% of the building permit fee each |
| Stand-alone residential mechanical or plumbing | $100 |
| Energy code plan review and inspection | $60 |
| Technology fee | 3% of the building permit fee; card payments add 3% |
| Reinspection, extra review | $100 an hour (one-hour minimum); third submittal with uncorrected items billed hourly |
| Change of use; final-inspection-only permit | $250; $100 or 25% of the original permit fee, whichever is greater |
Worked example. Suppose a house remodel is valued at $60,000. The table charges $772.50 for the first $50,000 and $8.40 for each further thousand ($84), so the building permit fee is $856.50; 65% plan review adds $556.73, for $1,413.23 before the 3% technology fee and any mechanical, plumbing or energy code charges.
Impact fees are due in full before a building permit issues. For 2026 the City lists a park impact fee of $5,227.06 per home ($2,613.53 for an ADU) and a traffic impact fee of $3,755 per single-family home ($1,877.50 for an ADU). School fees are paid to the district, with the receipt shown to the Permit Center: $4,595 per single-family home in the Sumner-Bonney Lake School District, while the White River School District stopped collecting school impact fees on October 1, 2026. From February 1, 2027, school fees will be based on the number of bedrooms. A single-family builder can defer impact fees to final inspection or 18 months, for $350 per fee.
Rather not deal with the building department?
Get a free quote →Trade permits and who may pull them
Mechanical and plumbing permits are City permits, priced at 15% of the building permit fee when they ride with a building permit and $100 when filed alone for a house. Electrical permits are not: Bonney Lake is not on L&I’s list of cities with their own electrical programs and lies outside Tacoma Power’s service area map, and the Permit Center’s electrical link goes to L&I.
Who issues what
- Building, mechanical, plumbing, fire, planning, civil and utility permits: Bonney Lake Permit Center
- Electrical permits and inspections: L&I
- Septic systems: Tacoma-Pierce County Health Department
- Business sewer pre-treatment: Sumner-Bonney Lake Joint Pre-Treatment Program
Contractors
- Permits issue only after the contractor’s L&I license and state and City business licenses have been checked
- Roll-off dumpsters must come from the City’s hauler, Murrey’s DM Disposal
- The state rules behind those license checks are explained in our Washington contractor licensing notes
How to apply for a Bonney Lake building permit
Use the GIS portal to confirm city limits, critical areas, shoreline jurisdiction and water and sewer providers.
If the project adds or replaces 500 sq ft or more of hard surface, follow the City’s four-step stormwater handouts (site design, infiltration feasibility, infiltration testing and soils report) or use the pre-calculated infiltration trench guide for a small project.
Choose the residential, ADU, deck, commercial or other application, upload the checklist items and the owner authorization.
Staff enter the application and tell you what is due; pay in the Online Permit Portal, by phone, by check or with exact cash at the counter.
Use the resubmittal form for your permit type and upload every document in PDF in the same submission.
Pay issuance and impact fees, provide contractor license details and finish any pre-issuance erosion-control or tree-fence inspection; the permit and plans are emailed within three business days.
Want this handled start to finish?
Get a free quote →Review, corrections and what causes delay
The City publishes typical first-review times: one to two weeks for re-roofs, plumbing, mechanical and solar; two to four weeks for demolitions, fire alarm and sprinkler permits, availability certificates and right-of-way permits; four to six weeks for new houses, ADUs, remodels, additions and tenant improvements. Under BLMC 15.04.082, an application is abandoned 180 days after filing unless pursued in good faith, with at most two 180-day extensions, and plans still carrying uncorrected items on the third submittal are billed hourly.
Inspections in Bonney Lake
Request inspections in the Online Permit Portal or leave a message on the inspection request line, 253-447-4357, by 3 p.m. for the next business day. Results are emailed to the primary customer email on file, and no paper results are left on site. Field changes after issuance need an approved revision before the changed work starts.
A certificate of occupancy for a building under the building code issues only after zoning and permit conditions are met, any damage to City property is repaired or paid for, and the City has the as-built documents in electronic form. Work begun without a permit pays an investigation fee equal to the permit fee.
Bonney Lake permit search and official resources
The Online Permit Portal shows the status of submitted applications and inspection results, and the Permit Center posts annual permit performance reports and year-to-date permit activity reports. Bonney Lake is a participating community in the National Flood Insurance Program; FEMA’s status book gives March 7, 2017 as its current flood map date.
- Bonney Lake Permit Center: submittals, review times, inspections
- Building permits: exemptions, checklists, stormwater
- Permit and impact fees
- City fee schedule (PDF)
- Online Permit Portal
- Bonney Lake Municipal Code, Title 15
- Ordinance 1759, accessory structure and garage separation amendments (PDF)
- Council agendas and minutes
- L&I list of cities with their own electrical permits
Inspections are where schedules slip.
Get a free quote →Bonney Lake building permit FAQ
Where is the Bonney Lake Permit Center?
On the second floor of the Public Services Center, 21719 96th Street East, open Monday to Thursday from 9 a.m. to 4 p.m.
Do I need a permit for a shed?
Not for a one-story detached shed up to 200 sq ft at a house. Ordinance 1759 removed the old 120 sq ft limit from September 29, 2026.
Do I need a permit for a fence?
Only if it is taller than 6 feet.
How long does review take?
The City quotes four to six weeks for a first review of a new house, ADU, remodel or addition, and one to two weeks for re-roofs and trade permits.
How much is a permit for a $60,000 remodel?
$856.50 for the building permit and $556.73 for plan review, plus the 3% technology fee and any trade permits.
Can I get a water heater permit the same day?
Yes, as a web permit, if your contractor holds an L&I license and state and Bonney Lake business licenses.
Do I need a permit to tear down an old shed or garage?
Yes if the structure is larger than 120 sq ft; the City requires a demolition permit for removing any structure over that size, and the City’s page points owners and contractors to the Puget Sound Clean Air Agency’s demolition requirements.
Who issues electrical permits?
L&I. The City does not issue them.
Simplify Bonney Lake permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Washington. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Bonney Lake sooner?
Let Alliance prepare, file, and track your Bonney Lake permits while your crew stays on the job.
More Washington permitting guides
Pierce County
Read guide →DuPont
Read guide →Edgewood
Read guide →Bothell Building Permit Guide
Read guide →Bremerton Building Permit Guide
Read guide →Burien Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Bonney Lake permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.