Orange County itself issues no permits. Eleven of its 17 towns issue zoning or development permits under their own bylaws, and Randolph states plainly that it does zoning only, with no local trade permits or building inspections. Rentals and commercial buildings need a state construction permit from the Division of Fire Safety, and Fairlee, for example, charges $415 in zoning fees for a new 2,000 sq ft house.
What needs a permit in Orange County?
In the 11 towns with zoning or a development ordinance, building, enlarging, moving or changing the use of a structure needs a town permit first. Brookfield’s forms page says permits must be approved before building new structures or modifying or enlarging existing ones, and Vershire’s Development Ordinance, in place since 1994, covers construction, conversion, relocation and enlargement of buildings and changes of use. Some small work is exempt: Chelsea does not require a zoning permit for structures under 100 sq ft that are not for human occupancy, though they must still meet setbacks.
Town level
- Zoning or development permit for new buildings, additions and changes of use
- Development Review Board or Zoning Board review for conditional uses, variances and subdivisions
- Flood hazard permits, including in towns with no other zoning
- Access and right-of-way permits for town roads
State level
- Division of Fire Safety construction permit for public buildings, rentals included
- Electrical and plumbing work notices before regulated work starts
- DEC wastewater system and potable water supply permit
- Act 250 permit for larger developments
Orange County building department: who handles permitting
Vermont counties are not permitting governments, so an Orange County project goes to its town and to the state. The Census Bureau lists 17 towns and two incorporated villages, Newbury and Wells River, both inside the Town of Newbury and both zoned under its regulations.
Short on time to read all of this?
Get a free quote →| Town | Rules | Contact |
|---|---|---|
| Randolph | Land Use Regulations and Sign Ordinance; Development Review Board, which also does local Act 250 review of criteria 6, 7 and 10 | Zoning office, Town Hall, 7 Summer Street; 802-728-5433 x 223 |
| Bradford | Zoning bylaws adopted by the Selectboard on October 9, 2025, headed “Interim Zoning Bylaws”, amending the bylaws of December 19, 2019; subdivision and flood resilience bylaws | Zoning Administrator 802-222-4727 ext. 215 |
| Thetford | Zoning bylaws effective February 12, 2024; subdivision regulations effective June 28, 2021; 2021 flood hazard bylaw | Zoning office, 3910 VT Route 113, Thetford Center; 802-785-2922 ext. 6; Tue and Thu |
| Braintree | Unified bylaw adopted December 16, 2025, effective January 6, 2026 | Zoning Administrator 802-728-9787 ext. 3; Mon–Fri |
| Brookfield | Development Bylaws effective December 15, 2025 | Town office 802-276-3352 |
| Chelsea | Zoning bylaw adopted March 3, 2026; flood hazard bylaw adopted November 7, 2017 | Town clerk 802-685-4460 |
| Fairlee | Unified Development Bylaw adopted by the voters in 2023 | Town offices 802-333-4363 |
| Newbury (with Newbury and Wells River villages) | Unified Zoning and Subdivision Regulations adopted October 11, 2017, with Wells River and Newbury Village districts | Zoning Administrator 802-866-5026 ext. 4 |
| Strafford | Unified bylaw and flood hazard area zoning ordinance adopted November 16, 2023 | Town office 802-765-4411 |
| Washington | Zoning Ordinance voted May 26, 1992, revised December 4, 2007; Zoning Board of Adjustment | Town clerk 802-883-2218 |
| Vershire | Development Ordinance in place since 1994, amended 2008; flood hazard bylaw of 2018 | Town office 802-685-2224 |
Towns with flood rules but no zoning: Corinth says no zoning ordinance is in effect other than its flood hazard area zoning of May 2015; it also has subdivision bylaws (2017) administered by its Planning Commission (802-439-5850). Tunbridge issues a floodplain development permit under its flood hazard ordinance (802-889-5521). Williamstown requires a conditional use permit only for building in the flood hazard area defined by its flood hazard bylaws (802-433-5455). West Fairlee adopted a stand-alone flood hazard area bylaw in December 2024 (802-333-9696 ext. 101). Orange has no zoning bylaws, according to a 2025 study the town posted, but its Inundation Hazard Area Regulations, last updated in 1988 with amendments proposed in 2014, govern building in the mapped flood hazard area (town clerk 802-479-2673). Topsham’s 2012 town plan says it has no zoning bylaws, but under the Flood Hazard Bylaw it adopted in 1979 a town permit is needed for new construction or substantial improvement in the designated floodplain (town clerk 802-439-5505).
Not sure this scope needs a permit?
Get a free quote →State offices: the whole county is in the Division of Fire Safety’s Waterbury region (45 State Drive, Waterbury; 802-479-4434). DEC’s Montpelier Regional Office at 1 National Life Drive issues wastewater and water supply permits for all 17 towns (802-828-5034, by appointment). Act 250 is split: Washington, Williamstown and Orange are in District 5 (802-522-6428) and the other 14 towns in District 3 (802-261-1947); both commissions are at 10 Baldwin Street, Montpelier.
Orange County town applications
- Thetford takes zoning permit applications on paper at the town office with the fee; they cannot be emailed. The part-time office asks applicants to plan ahead, because hearing notices push deadlines well before the Development Review Board’s 2nd and 4th Tuesday meetings. Farm structure exemptions are decided by the Agency of Agriculture through its Farm Determination Form.
- Randolph applications are in the bin beside the zoning office door or online, and can be submitted in person or by email. The town has 30 days from a complete application to issue or deny a permit.
- Fairlee has separate residential and commercial permit applications and an appeal form for zoning administrator decisions.
- Braintree no longer includes the certificate of occupancy in the zoning fee; the zoning administrator decides whether one is needed.
- Washington updated its zoning permit and subdivision applications in April 2026.
- Vershire has separate minor and major subdivision applications.
- State: Division of Fire Safety construction permits use the full application or, for renovations under $200,000, the small project form; DEC wastewater permits are filed through ANR Online.
Zoning fees in Orange County towns
Each town sets its own fees. These are the schedules posted by five of them:
Rather talk it over?
Call 1-855-478-4290 →| Project | Fee |
|---|---|
| Fairlee, new single-family dwelling | $100 + $0.15 per sq ft + $15 recording |
| Fairlee, addition or accessory structure | $0.15 per sq ft, $100 minimum, + $15 recording |
| Fairlee, new commercial structure | $150 + $0.25 per sq ft + $15 recording, with site plan approval |
| Fairlee, certification of compliance | $100, includes site inspection |
| Braintree, zoning up to 150 sq ft / 151 sq ft or more | $50 / $70 |
| Braintree, certificate of occupancy | $35 |
| Braintree, DRB review / appeal | $175 / $150 |
| Chelsea, zoning application | $55 ($160 if work has started) |
| Chelsea, DRB application | $50 ($200 if work has started) |
| Washington, zoning permit | $10 |
| Brookfield, new dwelling, addition, renovation or accessory building | $50 under 500 sq ft; $70 for 500–1,000; $90 for 1,000–2,000; $120 over 2,000, plus $0.10 per sq ft above 3,000 |
| Brookfield, certificate of use | $35 |
Under Fairlee’s 2026 schedule a new 2,000 sq ft house costs $100 + $300 + $15 = $415. Thetford’s fee schedule took effect on May 1, 2024, and Newbury posts a 2019 schedule. State construction, work notice and wastewater fees are separate.
Electrical, plumbing and fire safety permits
Randolph’s zoning page says there are no trade permits or building inspections at the local level, though they may be required by the state. Across the county, construction in public buildings, which include rentals, needs a Division of Fire Safety permit, and the electrical and plumbing work it regulates needs a work notice before work starts, on paper or online. Fire alarm, sprinkler, suppression, exhaust hood, tank and tent permits each have a separate state application.
Alliance handles electrical permits for contractors here. More on this: who pulls the electrical permit.
Rather not deal with the Orange County building department?
Get a free quote →How to get a permit in Orange County
And, in Newbury, whether the parcel is in the Wells River or Newbury Village district.
Zoning or a development ordinance in 11 towns; floodplain rules (plus subdivision bylaws in Corinth) in Corinth, Tunbridge, Williamstown, West Fairlee, Orange and Topsham.
In Chelsea about half the village’s structures are in the regulatory floodplain, and new structures there must have their lowest floor above base flood elevation.
Fire Safety for public buildings, DEC for septic and wells, District 3 or 5 for Act 250.
Thetford needs paper applications at the town office; Randolph accepts email.
Get any certificate the town requires and record the residential energy certificate.
Inspections in Orange County
Town permits are land use approvals; Randolph, the county’s largest town, does no building inspections. State inspectors from the Waterbury Regional Office cover public buildings and regulated electrical and plumbing work. Fairlee will do a site inspection with its $100 certification of compliance, and Braintree decides case by case whether a certificate of occupancy is needed.
The Residential Building Energy Standards apply to all new residential construction, including additions, alterations, renovations and repairs. The builder, or a licensed engineer, licensed architect or accredited home energy rating organization, signs the certificate, which is posted at the heating or cooling equipment or electrical panel, sent to the Department of Public Service and recorded in the town land records; either the 2020 or the 2024 standards may be used since July 14, 2026.
Floodplains, historic areas and Act 250 in Orange County
Flood insurance program: FEMA’s Community Status Book lists all 17 Orange County towns as participating, with Washington still in the emergency program. Newbury’s entry includes the villages of Newbury and Wells River, and Randolph’s includes the Village of Randolph.
Historic review: in Thetford, projects inside the Historic Preservation Overlay are also reviewed by the town’s Historical Preservation Committee.
Act 250: District 3 covers 14 Orange towns and District 5 covers Washington, Williamstown and Orange. In Randolph, the Development Review Board also reviews Act 250 criteria 6, 7 and 10 locally.
Want this handled start to finish?
Get a free quote →Vermont building code
Vermont has no statewide building code for an owner-occupied single-family home. The state code covers public buildings, including rented homes, and each town decides whether it runs a building department or only issues zoning permits. Vermont rules
Orange County permit FAQ
Does Orange County issue building permits?
No. Vermont counties have no permitting office; towns issue zoning or development permits and state agencies issue the rest.
Does Randolph inspect houses?
No. Randolph does zoning only, with no local trade permits or building inspections; state permits may still apply.
How much is a zoning permit for a new house in Fairlee?
$100 plus $0.15 per square foot plus a $15 recording fee under the January 1, 2026 schedule, so $415 for 2,000 sq ft.
Which Orange County towns have no zoning?
Corinth, Tunbridge, Williamstown, West Fairlee, Orange and Topsham have no zoning; their town rules cover flood hazard areas, and Corinth also has subdivision bylaws.
Who issues septic permits in Orange County?
DEC’s Montpelier Regional Office issues wastewater system and potable water supply permits for all 17 towns.
Which Act 250 district covers my Orange County town?
District 3 for most towns; District 5 for Washington, Williamstown and Orange.
Orange County permit search and official resources
Town zoning pages and the state offices that serve Orange County.
Inspections are where schedules slip.
Get a free quote →- Randolph zoning department
- Randolph Development Review Board
- Bradford zoning
- Thetford zoning office and bylaws
- Braintree zoning and fees
- Chelsea zoning applications and bylaws
- Fairlee zoning fee schedule (January 2026)
- Newbury zoning
- Vermont Division of Fire Safety permits and forms
- Division of Fire Safety regional offices map
- DEC Montpelier Regional Office (wastewater and water supply)
- Act 250 district commissions and coordinators
- DEC wastewater and potable water permit applications
- Vermont Residential Building Energy Standards
Simplify Orange County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Vermont. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Orange County sooner?
Let Alliance prepare, file, and track your Orange County permits while your crew stays on the job.
More Vermont permitting guides
Washington County
Read guide →Windsor County
Read guide →Caledonia County
Read guide →Orleans County Building Permit Guide
Read guide →Rutland Building Permit Guide
Read guide →Rutland County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Orange County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.