Terry County runs no building permit office; it is the state-authorized septic permitting agent. Brownfield permits and inspects construction inside its limits, Meadow’s City Council reviews building permits in that town, and Wellman publishes no permit process.

Authority: No county building permit; Brownfield permits inside its limitsPhone: 806-637-7230 (Courthouse)
County building permit
None publishedNo county permit page
Septic (rural)
Terry CountyTCEQ authorized agent
Brownfield permits
City Inspection Department201 W Broadway, 806-637-4547
2025 population
11,720Brownfield 8,762

Terry County’s website lists no building permit, development permit or inspection office, so a home in the unincorporated county gets no county building permit or inspection. The County is, however, the TCEQ-authorized agent for septic systems (OSSF) across the whole county, a program run by the South Plains Public Health District. Inside Brownfield, the county seat, the City’s Inspection Department at 201 W. Broadway (806-637-4547) issues building, plumbing, electrical and mechanical permits, and the City of Meadow issues its own building permits after City Council review.

Who issues permits in Terry County?

Terry County has three incorporated places. The answer depends on where the land is:

Building permit authority by area in Terry County
AreaWho issues building permits
Brownfield (8,762 residents)City of Brownfield Inspection Department, City Hall, 201 W. Broadway, 806-637-4547; permits are issued under the City’s fee schedule and inspected by the City and Building Inspector
Meadow (623)City of Meadow, 906 1st St., 806-539-2377: its building permit application (houses, mobile homes, additions, carports, shops, storage buildings, fences, water and sewer service) goes to City Hall with the fee 10 days before a regular council meeting, and the Council approves or denies it; work must start within 6 months
Wellman (229)The published sources do not say; ask the town hall
Unincorporated Terry CountyNo county building permit or inspection; septic systems need a permit from the County’s program, run by the South Plains Public Health District
Within 1 mile of Brownfield (its ETJ)Brownfield’s subdivision regulations apply to dividing land; the City publishes no building permit for this area

Short on time to read all of this?

Get a free quote →
Terry County contacts
OfficeDetails
Terry County Courthouse500 W. Main Street, Brownfield, TX 79316; 806-637-7230
County Judge’s officeRoom 102; 806-637-6421
County Clerk (plats and records)Room 105; 806-637-8551
City of Brownfield201 W. Broadway; 806-637-4547; fax 806-637-9369

Septic, floodplain and burning rules

Septic systems: TCEQ’s 2025 authorized agent report lists Terry County as the local permitting authority for on-site sewage facilities, with 39 authorizations to construct issued in 2025. State rules require a permit to build, alter, extend or repair a septic system, start with a site evaluation by a licensed site evaluator or professional engineer, and give the permitting authority 30 days to approve or deny a complete application; a denial can be appealed to the Commissioners Court. TCEQ lists the County as agent for the entire county, Brownfield, Meadow and Wellman included, with the program administered by the South Plains Public Health District from its Brownfield office at 919 E. Main Street (TCEQ’s listed septic contact: 432-213-3175; clinic: 806-637-2164). The District posts the septic permit application and a list of licensed installers on its Documents page.

Floodplain: the Texas Water Development Board’s floodplain administrator directory lists Brownfield’s City Inspector as the city’s floodplain manager, and gives the same phone number (806-637-4547) for the Terry County entry. The County website publishes no floodplain permit or flood damage prevention order.

Not sure this scope needs a permit?

Get a free quote →

Outdoor burning: the County posted an order on August 11, 2026 prohibiting outdoor burning for 90 days.

Electrical, plumbing and mechanical permits

The County publishes no trade permits for unincorporated land. In Brownfield, the Inspection Department inspects residential, commercial and industrial work under the City’s building, electrical, plumbing and mechanical codes, and the same permit form covers building, plumbing, electrical and mechanical work. Contractors pulling a Brownfield permit for the first time fill out the City’s contractor form, register for $50 a year, and must keep their insurance or bond and licences current, or no permit will be written. Brownfield also runs its own electric utility, Brownfield Municipal Power and Light, which takes a meter deposit of at least $25 for a home and $75 for a business.

Permit fees in Brownfield

The County charges no building permit fee because it issues no building permit. Brownfield’s fees are set in Appendix A of its Code of Ordinances:

Rather talk it over?

Call 1-855-478-4290 →
City of Brownfield permit fees (Code Appendix A)
WorkFee
New one- or two-family home$0.05 per sq ft under roof, all stories, excluding unheated attached garages and covered porches or balconies
Detached residential accessory building$0.05 per sq ft under roof, including unheated area
Other new construction$0.10 per sq ft under roof, including covered unenclosed areas
Residential remodel$1.50 per $1,000 of construction value
Other remodel$2.25 per $1,000 of construction value
Electrical, plumbing or mechanical (new or renovation)$0.03 per sq ft, $30 minimum
Other electrical, plumbing or mechanical permits$30
Contractor registration$50 a year

Building permits have a $30 minimum, with $15 added for each inspection beyond the first. For example, a new home with 2,000 sq ft under roof (not counting the garage or porches) pays $100, plus $15 for each inspection after the first. Plumbing and mechanical re-inspections cost $30 the first time and $45 after that, and extra electrical inspections are $10 each. The building official can check the stated construction value and require contracts or invoices.

Inspections

There are no county building inspections in unincorporated Terry County; a septic system is inspected under the County’s TCEQ authorization. In Brownfield, bring the completed permit form to the City Inspector at City Hall and arrange inspections with the Inspection Department (806-637-4547), which has one staff member. The City adopted the 2018 International Building Code and 2018 International Residential Code in January 2020. Buildings moved into Brownfield must be opened up for electrical inspection, and out-of-city inspections before a move are charged for time, mileage and meals.

Rather not deal with the Terry County building department?

Get a free quote →

Texas building code

Texas has no single statewide building code: state law makes the International Residential Code the base code for homes in cities and the International Building Code the base for commercial buildings, with each city choosing the edition and its own amendments, while the National Electrical Code and the energy code apply statewide. Outside city limits most counties issue no building permits for homes. Texas building code rules

Official Terry County permit resources

Want this handled start to finish?

Get a free quote →

Terry County permit FAQ

Do I need a county building permit to build a house in Terry County?

No. The County publishes no building permit or inspection program for unincorporated land. A septic system still needs a permit from the County.

Who issues building permits in Brownfield?

The City of Brownfield Inspection Department at City Hall, 201 W. Broadway (806-637-4547).

How much is a building permit for a new house in Brownfield?

$0.05 per square foot under roof, with a $30 minimum and $15 for each inspection after the first; a 2,000 sq ft home starts at $100. Trade permits are $0.03 per square foot each, $30 minimum.

Inspections are where schedules slip.

Get a free quote →

Who handles septic permits in Terry County?

Terry County is TCEQ’s authorized agent for the whole county, and the South Plains Public Health District runs the program from 919 E. Main Street in Brownfield. The permitting authority has 30 days to decide on a complete application.

Do Meadow and Wellman issue building permits?

Meadow does: its building permit application is reviewed by the City Council, so file it at City Hall (806-539-2377) at least 10 days before a regular meeting. Wellman publishes no permit process; ask the town hall before building.

Simplify Terry County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Texas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Terry County sooner?

Let Alliance prepare, file, and track your Terry County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Terry County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.