Lavaca County, Texas Building Permit Guide

Lavaca County requires a $20 development permit and a septic permit for rural building sites; Hallettsville, Moulton, Shiner and Yoakum issue their own building permits.

Authority: Lavaca County Permit, Inspection and Floodplain AdministrationCode: No county building code; flood and septic ordersPhone: 361-798-2301 (development/floodplain); 361-772-4296 (OSSF)
County authority
Permit, Inspection and Floodplain Administration
Development permit
$20 residential or commercial
Permit contact
361-798-2301 (development/floodplain); 361-772-4296 (OSSF)
2025 population
20,651

Outside its four towns, Lavaca County has no building permit for houses; what it requires before any construction is a development (floodplain) permit from the county’s Permit, Inspection and Floodplain office in the Hallettsville courthouse (361-798-2301), which costs $20 for a home or business. A new septic system also needs a county permit, starting at $250, filed by a TCEQ-licensed installer.

What needs a county permit in Lavaca County?

For land outside the incorporated cities, the county regulates construction through its Flood Damage Prevention Order, its on-site sewage facility order and its subdivision regulations. It does not review building plans or inspect framing, wiring or plumbing on rural homes.

County permits

  • Development permit (floodplain determination) before any construction, including placing a manufactured home or making substantial improvements
  • Septic (OSSF) permit to install, replace or repair a system, on every parcel that needs one
  • Subdivision plat, or a Certificate of Exemption, before any lot or tract is sold
  • Driveway and culvert permit on a county road
  • Pipeline crossings, temporary waterlines and oil and gas well or platform sites

Not a county permit

  • Building, electrical, plumbing or mechanical permits for homes in the unincorporated county
  • Building permits inside Hallettsville, Moulton, Shiner and Yoakum, which the cities handle
  • Septic systems inside incorporated cities, which the county’s septic order does not cover

Who issues permits in Lavaca County?

One office at the courthouse, 109 N. LaGrange Street (P.O. Box 243), Hallettsville, TX 77964, handles development permits, floodplain determinations, subdivision plats and county road permits. Nailene Ruppert is the Flood Plain Administrator. Septic applications go to the county’s OSSF Designated Representative, who works by appointment at the courthouse.

Short on time to read all of this?

Get a free quote →
Lavaca County permit contacts
OfficeContact
Permit, Inspection and Floodplain Administration361-798-2301 (county forms also list 361-798-5310); nailener@co.lavaca.tx.us
OSSF Designated Representative361-772-4296; ndean@co.lavaca.tx.us; appointment needed to drop off an application packet
Driveways on county roadsThe County Commissioner for the road’s precinct signs the permit
Building permits by town in Lavaca County
AreaWho issues building permits
Unincorporated Lavaca CountyNo county building permit; county development, septic, plat and road permits apply
HallettsvilleCity of Hallettsville Permits, online in VertexPlans; 361-798-3681, permits@cityofhallettsville.org
ShinerCity of Shiner, City Hall at 802 N Avenue E; 361-594-3362
Yoakum (partly in DeWitt County)City of Yoakum, City Hall at 808 Hwy 77-A South; 361-293-6321. The City requires permits for building and development, plumbing and gas, electrical and mechanical work
MoultonCity of Moulton, whose Chapter 3 Building Regulations cover homes and commercial buildings in town; City Hall at 102 S. Main Street, 361-596-4621

County permit fees and septic rules

Lavaca County is TCEQ’s authorized agent for septic systems outside the incorporated cities. A homeowner may not install or maintain a system; a licensed site evaluator or engineer assesses the soil, a licensed designer draws the system, and the installer you choose applies on your behalf. The county holds a septic application until a development permit for the property has been issued.

Not sure this scope needs a permit?

Get a free quote →
Lavaca County permit and plat fees
PermitFee
Development permit, residential or commercial$20
Pipeline development permit$20 application plus $100 for each flood zone crossed
Oil and gas well or platform site$20 per well or rig
Septic, standard residential system$250
Septic, residential aerobic system$275, including a $25 maintenance contract fee
Septic, commercial system$300 ($325 aerobic)
Subdivision plat, no designated floodplain$2,000 plus $10 per lot
Subdivision plat in a designated floodplain$2,500 plus $10 per lot
Final plat$250

The county’s septic page says the Designated Representative approves or denies an application within 30 days, while its program sheet says complete applications are reviewed within 5 business days. No work on the system may start until the installer has the Approval to Construct.

What goes in the application packets

The floodplain determination application asks for the owner’s details, the legal description and physical location (with the 911 address if known), and an aerial map showing the building site when the tract is larger than 2 acres. You tick whether it is a possible purchase, new construction, a manufactured home or a substantial improvement, and give the improvement’s estimated cost.

The septic packet, usually assembled by the installer, contains:

  • OSSF application
  • Site and soil evaluation by a licensed evaluator or professional engineer
  • Scaled design and system specifications
  • Recorded, signed affidavit for required maintenance
  • Warranty deed
  • Map to the location
  • Signed maintenance contract, where the system needs one
  • The permit fee, payable to Lavaca County

Rather talk it over?

Call 1-855-478-4290 →

How to permit a rural home site in Lavaca County

1. Find out who has jurisdiction

If the lot is inside Hallettsville, Moulton, Shiner or Yoakum, apply to that city; otherwise the county process below applies.

2. File the floodplain determination

Send the determination application and $20 fee to the courthouse office before any work. Outside the flood hazard area, the county releases the other permits once fees are paid.

3. Add flood documents if mapped

In a Special Flood Hazard Area, file a floodplain development permit application with an elevation certificate from a licensed surveyor; floodway sites have further requirements.

4. Have the installer file the septic packet

Book an appointment with the Designated Representative to hand in the packet, then wait for the Approval to Construct.

5. Get the driveway permit

For access onto a county road, complete the driveway and culvert permit and call the precinct Commissioner at least 24 hours before work starts. The permit lasts 90 days.

6. Pass the septic final

Once installed, the system is inspected; if nothing needs correcting, the county issues a Notice of Approval to Operate.

Inspections in the unincorporated county

The only county construction inspection is on the septic system: call the Designated Representative at 361-772-4296 to schedule it. If the installation and drawing are correct, the county issues a Notice of Approval to Operate and records the inspection date as the system’s start-up date for maintenance. There is no county building final or certificate of occupancy for a house.

Inside the cities, the city’s own inspections apply. Shiner’s permit application, for example, states that every permit requires a final inspection and lapses if work has not started within 180 days.

Rather not deal with the Lavaca County building department?

Get a free quote →

Subdivisions, roads and oil field traffic

Splitting land: dividing a tract outside city limits into 2 or more lots needs a plat unless state law or the Commissioners Court exempts it. The county decides exemptions itself, so you must file the application with a surveyed plat even if you think you qualify; approved exemptions get a Certificate of Exemption in Commissioners Court. Approval of a plat does not mean the county will maintain the subdivision’s streets.

Driveways: the property owner pays for the driveway and culvert, locates buried lines before digging, and lists the pipe’s diameter, length and material and the base material on the permit.

Heavy traffic: since May 1, 2025 the county no longer accepts the Special Road Use Agreement. Oil and gas companies running overweight vehicles on county roads must post a $250,000 Road Bond Agreement.

City rules: Hallettsville’s sign ordinance applies in its extraterritorial jurisdiction as well as in town, and the city has its own floodplain and manufactured home ordinances. Moulton requires a commercial development permit application for any commercial development in town.

Texas building code

Texas has no single statewide building code: state law makes the International Residential Code the base code for homes in cities and the International Building Code the base for commercial buildings, with each city choosing the edition and its own amendments, while the National Electrical Code and the energy code apply statewide. Outside city limits most counties issue no building permits for homes. Texas building code rules

Lavaca County official resources

Lavaca County forms and the four cities’ permit pages:

Want this handled start to finish?

Get a free quote →

Lavaca County permit FAQ

Do I need a building permit to build a house in rural Lavaca County?

No county building permit exists outside the cities. You do need the county development (floodplain) permit before construction starts, and a septic permit if the house will not be on a public sewer.

Inspections are where schedules slip.

Get a free quote →

How much is a development permit in Lavaca County?

$20 for a residential or commercial project. In a mapped flood hazard area you also need an elevation certificate prepared by a licensed surveyor.

How much does a septic permit cost?

$250 for a standard home system and $275 for an aerobic one. Commercial systems are $300, or $325 if aerobic.

Can I install my own septic system?

No. The county does not let homeowners install or maintain their own system; a TCEQ-licensed installer files the application and does the work.

Who issues building permits in Hallettsville, Shiner, Yoakum and Moulton?

Each city issues its own. Hallettsville takes applications online through VertexPlans; Shiner, Yoakum and Moulton take them at City Hall.

Can I sell part of my land without a plat?

Not until the county approves it. File a subdivision application with a surveyed plat; if the split qualifies for an exemption, the Commissioners Court issues a Certificate of Exemption.

Simplify Lavaca County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Texas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Lavaca County sooner?

Let Alliance prepare, file, and track your Lavaca County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Lavaca County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.