Henderson, Texas Building Permit Guide

Henderson’s Community Development Department issues building and trade permits from the Municipal Services Complex on West Main Street, after contractors register with the City.

Authority: City of Henderson Community Development (Building Services)Code: 2021 I-Codes, 2015 IECC, 2023 NECPhone: 903-392-0786
Office
300 W. Main Street, 2nd floorCommunity Development help desk
Phone
903-392-0786Ext. 265 for permits
Plan review
7–10 business daysNew homes; commercial 15–30
Inspections
Book 24 hours aheadThrough Community Development

Inside Henderson city limits, permits are issued by the City’s Community Development Department at the Henderson Municipal Services Complex, 300 West Main Street (903-392-0786). Every contractor registers with the City before applying, and land that must be platted needs an approved plat before any building permit is issued. The City allows 7 to 10 business days to review a new house and 15 to 30 for new commercial buildings.

What requires a permit in Henderson?

The City asks for a permit for any new construction, demolition or structural alteration, including small structures such as decks and pools, interior and exterior remodeling, and electrical, plumbing and mechanical work. The Community Development forms cover:

Building permits

  • New homes, additions and remodels (residential packet)
  • New and altered commercial buildings (commercial packet)
  • Manufactured and modular homes
  • Roofing
  • Demolition and house moving
  • Signs

Systems and land

  • Electrical permits
  • Plumbing permits
  • Mechanical permits
  • Generator and solar system installation
  • Minor plats
  • Contractor registration

No work may start before approval, and that includes dirt work. If a permit you need is not on the list, Community Development staff will advise, and they are available for a consultation before you apply.

Henderson building department: who handles permitting

Community Development runs building services, planning and zoning, plats and code enforcement. Applications go to the Building Official, and depending on the project the Inspection Department, Health Department and Fire Department may each look at it before the permit is issued.

Short on time to read all of this?

Get a free quote →
Henderson permitting contact
DetailInformation
OfficeCommunity Development help desk, second floor, Henderson Municipal Services Complex, 300 W. Main Street, Henderson, TX 75652
Community Development903-392-0786 (permit forms and inspection scheduling, ext. 265; manager, ext. 237)
Water and sewer locatesFax 903-657-0015; allow 3 working days
Municipal Services Complex903-657-6551

City permits cover land inside Henderson only. Outside the city limits there is no City building permit, and septic systems are inspected by Rusk County’s designated representative. The County’s septic authority does not reach into Henderson: TCEQ lists the city among those its Tyler regional office (Region 5, 903-535-5100) covers.

Henderson permits: forms and contractor registration

Most forms are on the City’s Permits page as fillable PDFs, and contractor registration, demolition and house moving can also be done through online forms. Paper copies are at the Community Development help desk.

  • Contractor registration: required of every contractor who needs a permit, before the application is filed.
  • Building contractors: not required to be licensed or bonded by the City.
  • Electricians: must hold a City licence to contract and work in Henderson. They apply to the Community Development director with their state electrical contractor and master licences and proof of insurance, and renew the City licence each year by January 1.
  • Plumbers, HVAC contractors and irrigators: must hold their state licences and get the required City permits.

Henderson permit cost

Henderson does not post its permit fee schedule online. Under the City code, building, moving and demolition fees are set by the city manager or a designee and kept on file at City Hall, and plumbing, gas and mechanical fees are set the same way. The code adds two rules that affect every budget:

Not sure this scope needs a permit?

Get a free quote →
  • Plan checking: when the job is valued over $1,000 and plans are required, a plan-checking fee of half the building permit fee is paid when the plans are submitted.
  • Double fees: work started before the permit is issued pays double the normal fee.

An extra inspection trip because work was not ready can also be charged another permit fee.

Henderson trade permits

Electrical, plumbing and mechanical work each has its own City permit form, and the residential application lists the electrical, plumbing and mechanical contractors on the job. Trade work is checked against the 2023 National Electrical Code and the 2021 International Plumbing, Mechanical and Fuel Gas Codes. Generators and solar systems use a separate installation application.

On a new home, the trades are inspected at three stages: plumbing under the slab and the temporary power pole before the foundation pour; plumbing top-out and mechanical and electrical rough-in before drywall; and electrical, plumbing and mechanical finals before the building final.

What to submit for a new home

  • Two complete plan sets including mechanical, electrical and plumbing, at least 18 by 24 inches and drawn at 1/8 inch scale or larger, plus one PDF set emailed to the building inspector; one paper set is returned and must be kept on site
  • Two plot plans, separate from the building plans, at a minimum 1 to 30 scale, showing existing and proposed buildings and every setback
  • A site plan with lot and block, platted boundaries, street address, zoning, easements, an erosion control plan and arrows showing drainage
  • Foundation details and structural drawings, including a side view with the foundation
  • Two copies of REScheck energy compliance
  • Water and sewer tap information and the subcontractor list

Rather talk it over?

Call 1-855-478-4290 →

Before applying, check that water and sewer are actually available, whether fire hydrants are within 200 feet, and where CenterPoint gas lines and SWEPCO power lines run; access to a state road needs TxDOT approval. Parcel maps from the Rusk County Appraisal District can stand in for a survey drawing. Renovations and demolitions may also call for an asbestos survey.

Henderson permit application: how to apply step by step

1. Talk to Community Development

Staff offer a consultation before you apply and confirm whether the land needs a plat first.

2. Register the contractor

File the Professional Contractor Registration Form online or on paper; electricians also need their City licence.

3. Assemble the packet

Complete the residential or commercial permit packet with plans, plot plans, REScheck and utility information.

4. Submit and wait for review

Allow 7 to 10 business days for a new house or 15 to 30 for new commercial work.

5. Check in before work starts

Contractors check in with the City before any construction, including dirt work, and set up silt fencing, a portable toilet, the address and fire extinguishers.

6. Inspections and occupancy

Schedule each inspection 24 hours ahead; the building cannot be occupied until final clearance and the certificate of occupancy.

Inspections in Henderson

Once the permit is issued, book each inspection with the Community Development administrative assistant at least 24 hours ahead, giving your name, the correct address, whether you are the owner or renter and the work being done. If the work will not be ready, call to reschedule before the inspector arrives.

Rather not deal with the building department?

Get a free quote →

The City’s residential packet sets out four phases: pre-pour (temporary pole, under-slab plumbing and foundation formwork), framing and rough-in (framing, top-out, HVAC and electrical rough-in and the exterior envelope), insulation with third-party blower door testing, and the finals. At the final building inspection the termite protection statement and the third-party energy, insulation and duct report must be on site. The certificate of occupancy is issued when every system passes.

Plats, roofing and other Henderson rules

Plats: an approved plat, recorded with Rusk County, is required before any building permit is issued and before a parcel can be divided and sold. The process starts with a sketch plat and a preliminary conference with Community Development; preliminary plats go to the Planning and Zoning Commission at a public hearing, with notice to owners within 200 feet, and required changes must be resubmitted within 30 days.

Roofing: wood shingles are prohibited unless pressure treated for fire resistance.

Fences: fences must use conventional materials such as chain link, masonry or treated pine, cedar or redwood; plywood, railroad ties, corrugated steel, cattle panels and hog wire are not allowed.

Waste: construction debris goes to an approved disposal site; the City’s municipal hauling contract is with Republic Services and the Pine Hill Landfill in Kilgore.

Texas building code

Texas has no single statewide building code: state law makes the International Residential Code the base code for homes in cities and the International Building Code the base for commercial buildings, with each city choosing the edition and its own amendments, while the National Electrical Code and the energy code apply statewide. Outside city limits most counties issue no building permits for homes. Texas building code rules

Want this handled start to finish?

Get a free quote →

Henderson official permit resources

Henderson permit FAQ

Who issues building permits in Henderson?

The City’s Community Development Department at the Municipal Services Complex, 300 West Main Street; call 903-392-0786.

How long does plan review take in Henderson?

The City allows 7 to 10 business days for a new house and 15 to 30 business days for a new commercial building.

Inspections are where schedules slip.

Get a free quote →

Do contractors need to register or be licensed?

Every contractor registers before applying. General building contractors need no City licence, electricians need a City licence, and plumbers, HVAC contractors and irrigators need their state licences.

Can I start site work before the permit is approved?

No. The City says no work may start before approval, including dirt work, and work begun without a permit pays double fees.

How do I schedule an inspection in Henderson?

Call Community Development at least 24 hours ahead with your name, address and the work being done.

Do I need a plat before a building permit?

Yes, where the land has not been platted. An approved plat recorded with Rusk County must be in place first.

Simplify Henderson permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Texas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Henderson sooner?

Let Alliance prepare, file, and track your Henderson permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Henderson permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.