Inside Dumas city limits, the City’s Building Inspections office at City Hall, 124 W. 6th Street, issues building, electrical, plumbing, gas and mechanical permits, and you can apply and pay online through MGO. Fees are flat amounts in Appendix A of the Code of Ordinances: a new building or addition is $100 and a remodel $80, and every building permit needs a property survey showing where the work will go.
What requires a permit in Dumas?
Section 3.01.001 of the Code of Ordinances requires anyone doing building, electrical, plumbing, gas line or mechanical work on homes or commercial property inside the city limits to get the permits and pay the fees before starting. The fee schedule shows the permits the City issues:
Building permits
- New buildings and additions
- Remodels
- Moving in a manufactured home, ready-built home, other dwelling, storage building or carport
- Roofing of 500 sq ft or more
- Siding, outside veneers and windows
- Fences
- Solar panels
- Demolition
Trade and fire permits
- Electrical meter loops, new wiring, alterations, service entrances and signs
- Plumbing, gas lines, sewer and water lines, water heaters
- Pools, hot tubs and spas, and lawn sprinkler systems
- HVAC systems and heaters, and commercial kitchen hoods
- Backflow prevention devices
- Fire alarm and fire sprinkler systems
- Work in City right-of-way
Roofing work on less than 500 sq ft needs no permit. Working without a required permit can bring a fine of $75 to $200.
Who issues permits in Dumas?
The Building Inspections office at City Hall reviews plans, issues permits and inspects construction inside the city limits. Javier Pena is the City Building Official. Electric service in Dumas comes from Xcel Energy rather than the City, and the traffic signals on Dumas Avenue (Highway 287) and First Street (Highway 281) are controlled by TxDOT.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building Inspections, City Hall, 124 W. 6th Street, Dumas, TX 79029 (P.O. Box 438) |
| Phone | 806-935-4101 (City Hall and the Building Inspector’s office) |
| Building Official | Javier Pena, 806-934-7101 ext. 214, JPena@dumastx.gov |
| Hours | Monday–Thursday 7:30 a.m. to 5:30 p.m.; Friday 8 a.m. to noon |
| Online filing | MGO (My Government Online) |
| Electric utility | Xcel Energy, 800-895-4999 |
Contractor registration and homeowner permits
Contractors must register with the City before working on anything that needs a permit, and registrations last one year. Each registration needs a bond or insurance certificate and, where the state licenses the trade, a copy of the state licence. Electrical and plumbing contractors also register their master electrician or master plumber separately. The categories are general, electrical, HVAC, irrigation, medical gas, moving, plumbing, roofing, sign, pool and spa, and water treatment contractors. The fee table lists a $90 contractor licence, while the code’s older registration section still states $50 a year.
A homeowner who lives in, or will move into, a single-family house may work on it and its accessory buildings without registering, after signing an affidavit of ownership and residency. Tenants, landlords, developers and speculative builders do not qualify, and anyone who applies as a homeowner at three different addresses within two years is refused at the third.
Dumas permit fees
Permit fees are set in Appendix A of the Code of Ordinances, last amended by Ordinance 1227 in June 2024. They are flat amounts, not based on square footage or valuation.
Not sure this scope needs a permit?
Get a free quote →| Permit | Fee |
|---|---|
| Technology fee | $12.50 |
| New building or addition (residential or commercial) | $100 |
| Remodel | $80 |
| Move-in of a manufactured, ready-built or other home | $250 |
| Move-in of a storage building or carport | $25 |
| Re-roof, 500 sq ft or more (residential / commercial) | $60 / $80 |
| Siding, outside veneer and windows | $40 |
| Fence | $20 |
| Solar panels | $140 |
| Demolition | $50 |
| Re-inspection | $50 |
| Board of appeals application | $275 |
| Right-of-way construction inspection | $250 |
A temporary manufactured home on a construction site needs a $25 permit, which can be extended once for another 90 days for $25.
Electrical, plumbing and mechanical permits in Dumas
Trade permits are issued by the same office, to registered contractors or to a qualifying homeowner. The fee table sets these amounts:
| Permit | Fee |
|---|---|
| Electrical meter loop | $30 |
| Electrical, new residential / new commercial | $40 / $70 |
| Electrical alteration or addition (residential / commercial) | $30 / $60 |
| Service entrance alteration | $25 |
| Plumbing, new residential construction | $100 |
| Plumbing, new commercial (minimum / 10 or more fixtures) | $120 / $150 |
| Plumbing remodel with 3 or more fixtures (residential) | $40 |
| Water heater | $40 |
| Gas line replacement, house sewer or sewer tap | $25 each |
| Pool, hot tub or spa | $250 |
| Lawn sprinkler system / backflow first inspection | $50 / $50 |
| HVAC system | $35, plus $20 for each appliance or unit worked on |
| Commercial kitchen hood suppression | $150 |
| Fire alarm or fire sprinkler system | $150 each |
Rather talk it over?
Call 1-855-478-4290 →HVAC contractors must hold a state Class A or B air conditioning licence, and medical gas work needs a plumbing contractor with a medical gas endorsement.
Plans the City asks for
New home
- Permit application, every item completed or marked N/A
- Survey of the property with legal description
- Site plan with property lines, buildings, drainage and grading, driveway and utility lines
- Foundation plan built to the Panhandle Residential Foundation Manual
- Floor plan with braced wall lines and hold-downs
- Electrical plan with smoke and carbon monoxide alarms
- Four elevations, framing detail and a roof plan
- Energy compliance for the building envelope
New commercial
- Permit application and TDLR accessibility registration
- Survey, and a site plan with landscaping, driveways and parking
- Foundation, floor, wall and roof plans and elevations
- Energy compliance (COMcheck or prescriptive)
- Engineer-sealed mechanical, electrical and plumbing plans
- An engineer’s seal for buildings of 5,000 sq ft or more or with a metal structure, and an architect for two storeys or 20,000 sq ft
Rather not deal with the building department?
Get a free quote →Most residential plans are submitted in two copies and most commercial plans in three. Remodels need existing and proposed floor plans; additions also need site and foundation plans.
How to get a Dumas building permit
A certified surveyor, registered engineer or the city engineer must survey the lot and show where the work will go; without it the permit is refused.
Plan the finished floor at least 24 inches above the curb and gutter flow line of the nearest street.
Contractors register with insurance or bond and licences; owner-occupants sign the ownership and residency affidavit.
File the application with the plans from the City’s acceptance checklist and pay the fees.
Point out the lot corners and the location of the work to the Building Official.
The City’s inspectors check the work under the permit; each failed inspection costs $50 to repeat.
Inspections in Dumas
The Building Official’s office at City Hall inspects permitted work, and the Building Inspector’s office takes code questions on 806-935-4101. Each re-inspection costs $50, and the fire department’s re-inspection of alarm or sprinkler work is also $50. The first backflow device inspection is $50.
Local Dumas rules
Finished floor height: every new building must have its finished floor at least 24 inches above the curb and gutter flow line of the nearest street. Without curb and gutter it must be 12 inches above the highest point of the nearest street, and on an unpaved street the city engineer decides. Exceptions need approval from both the Planning and Zoning Commission and the City Commission.
Want this handled start to finish?
Get a free quote →Setbacks: the City publishes a residential property line setbacks diagram on the Building Inspections page.
Right-of-way: construction in City right-of-way falls under Ordinance 1180, with a $250 inspection fee.
Texas building code
Texas has no single statewide building code: state law makes the International Residential Code the base code for homes in cities and the International Building Code the base for commercial buildings, with each city choosing the edition and its own amendments, while the National Electrical Code and the energy code apply statewide. Outside city limits most counties issue no building permits for homes. Texas building code rules
Dumas permit resources
- Dumas Building Permits & Inspections
- MGO online permit application
- Residential plans checklist: new projects
- Residential plans checklist: remodels and additions
- Commercial plans checklist: new projects
- Residential property line setbacks
- Appendix A fee schedule: building and construction
- Code of Ordinances, Chapter 3 general provisions
- Contractor registration (Article 3.03)
Inspections are where schedules slip.
Get a free quote →Frequently asked questions
How much is a building permit in Dumas?
$100 for a new building or addition and $80 for a remodel, plus a $12.50 technology fee and separate electrical, plumbing and mechanical permits.
Do I need a permit for a new roof or fence in Dumas?
Yes. A residential re-roof of 500 sq ft or more is $60 and a fence $20. Roofing under 500 sq ft needs no permit.
Can a homeowner pull a permit in Dumas?
Yes, for a single-family house you live in or will live in, after signing an affidavit of ownership and residency. Landlords, tenants and builders cannot use the homeowner exemption.
Is a survey required for a building permit?
Yes. The code requires a survey by a certified surveyor or registered engineer showing the lot and the proposed work before a building permit is issued.
Which codes does Dumas use?
The Code of Ordinances adopts the 2012 International Building and Residential Codes, with 2012 mechanical, plumbing, fuel gas and energy amendments and the 2011 National Electrical Code.
What is the Dumas building department phone number?
806-935-4101 at City Hall; the Building Official is at 806-934-7101 ext. 214.
Simplify Dumas permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Texas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Dumas sooner?
Let Alliance prepare, file, and track your Dumas permits while your crew stays on the job.
More Texas permitting guides
This guide is provided by Alliance Permitting for general information about Dumas permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.