Bellmead, Texas Building Permit Guide

Bellmead permits are filed with Community Development on a single paper application, priced by square foot under the City’s 2025 master fee schedule.

Authority: City of Bellmead Community DevelopmentCode: 2018 I-Codes with local amendments
Authority
City of Bellmead Community Development254-799-2436, ext. 6120
Apply
PDF application by emailor at City Hall, 3015 Bellmead Dr
New home fee
$200 + $0.25/sq ftover 1,000 sq ft, plus $50 review
Population audit
10,5922025 Census PEP · #243 in Texas

Bellmead’s Community Development Department issues building, electrical, plumbing and mechanical permits inside city limits. You file the City’s one-page Building Permit Application by email or at City Hall, 3015 Bellmead Drive. A new home starts at $200 for the first 1,000 sq ft plus $0.25 for each further square foot, with a $50 residential plan review fee.

What requires a permit in Bellmead?

These are the types of work listed on the City’s Building Permit Application, plus the code’s grading rule; one form covers them, with a box ticked for each.

Building work

  • New construction and additions
  • Remodels and repairs
  • Roofs, carports, decks, patios and garage enclosures
  • Storage structures and accessory buildings
  • Fences and concrete work
  • Swimming pools and spas
  • Demolition and moving a building
  • Grading or changing the grade of a property

Systems and site

  • Electrical, plumbing and mechanical/HVAC
  • Solar panels
  • Irrigation and backflow devices
  • Fire sprinklers, alarms and hood systems
  • Work in the right-of-way, including driveways and sidewalks there
  • Network nodes (small cell)

No permit

  • Painting, wallpapering and similar cosmetic work
  • Residential foundation repair that stabilizes an existing foundation without removing concrete (new piers allowed)
  • Driveways and sidewalks no more than 30 inches above grade, off any accessible route and outside the right-of-way

Industrialized housing

  • Needs the same local permits as a site-built house
  • Must sit on a permanent foundation
  • Value must at least match the median of homes within 500 feet

Who handles permitting in Bellmead?

Community Development runs planning, zoning, building permits and code enforcement for land inside Bellmead city limits. Fred Morris is Director of Community Development and Bill Hunt is the Building Official. Land outside the city is in unincorporated McLennan County, which issues no house permits; the City’s published pages do not describe any building rules for an extraterritorial area.

Short on time to read all of this?

Get a free quote →
ItemDetails
OfficeCommunity Development, City Hall, 3015 Bellmead Drive, Bellmead, TX 76705
Phone254-799-2436, ext. 6120 (Building Official ext. 6122)
ApplicationsEmail alara@bellmeadtx.gov, or deliver to City Hall
Fire MarshalBellmead Fire Department, 700 Kane Street, 254-412-7540
Right-of-wayPublic Works, 254-799-5829, permits@bellmeadtx.gov

Bellmead application forms and contractor registration

Bellmead has no online permit portal. The forms are PDFs posted on the Community Development page:

  • Building Permit Application: one form for residential or commercial work, listing the general contractor and subcontractor with their state licence and driver’s licence numbers, a written description, square footage (finished or unfinished) and the value of construction.
  • Contractor Registration Application: contractors register with the City before work starts. General contractors, solar, sign and pool companies pay $100 a year; licensed electrical, plumbing, HVAC, fire and irrigation contractors register free. Attach a driver’s licence, state licence and insurance certificate.
  • Fire Marshal’s Permit Application: for sprinkler, alarm, standpipe, hood and other fire systems and fuel tanks, with proof of liability insurance, the DBA certificate and company and technician licences.
  • Certificate of Occupancy Application: filed on the City’s Occupational Permit form; new certificates are $150.
  • Right of Way Permit Application: Public Works’ form for road bores and other work in city right-of-way, with a traffic control plan where lanes close.

Bellmead permit fees

Fees come from Appendix B of the City code, the master fee schedule adopted in April 2025 and last amended on September 9, 2025.

Not sure this scope needs a permit?

Get a free quote →
Bellmead building permit fees (master fee schedule, 2025)
ProjectFee
New home or residential addition$200 for the first 1,000 sq ft + $0.25 per additional sq ft
New commercial building or addition$250 for the first 1,000 sq ft + $0.25 per additional sq ft
Plan review, new construction$50 residential; $250 commercial
Remodel or repair$125 for the first 1,000 sq ft + $0.25 per additional sq ft
Accessory building$75 + $9 per $1,000 of value
Storage building$75
Roof$100 residential; commercial $100 for the first 1,250 sq ft + $0.10 per additional sq ft
Fence$50
Carport$100
Deck or patio enclosure$150
Swimming pool or spa$100 residential; $150 commercial
Solar system$200 residential; $250 commercial
Demolition$100 residential; $200 commercial
Moving a building$250
Re-inspection$55 each
Certificate of occupancy$150; temporary certificate (30 days) $150

Where the City sends plans to an outside reviewer, it charges that reviewer’s cost plus 10%. Zoning changes, variances and specific use permits are $500 each.

Electrical, plumbing, mechanical and fire permits

The same Community Development application is used for trade work: tick Electrical, Plumbing or Mechanical/HVAC. Trade contractors must be registered with the City, though licensed trades pay no registration fee.

Rather talk it over?

Call 1-855-478-4290 →
Bellmead trade and fire permit fees (2025)
PermitFee
Electrical, plumbing or mechanical, new home$0.25 per sq ft each, minimum $200
Electrical, plumbing or mechanical, new commercial$200 + $0.25 per sq ft each
Residential remodel, each trade$150 for the first 1,000 sq ft + $0.25 per additional sq ft
Commercial electrical, remodel$90 + $12 up to 400 amps, $26.50 for 401–1,000 amps, $40 over 1,000 amps
Commercial plumbing, remodel$90 + $5 per drain, trap or fixture; $35 water or sewer line
Gas test$50
Temporary power pole$50
Fire sprinkler system$75 + $0.50 per head
Fire alarm system$75 + $1.50 per device
Kitchen hood and duct system$50 + $3 per nozzle
Fire permit re-inspection$165

Fire system permits are filed on the Fire Marshal’s form and paid in full before any inspection. The form still prints its 2019 prices; the 2025 master fee schedule above is the newer adopted figure.

How to get a Bellmead building permit

1. Research the lot

Look up the zoning district (R-1, R-1A, R-2, B-1, B-2 or I) on the City’s zoning map and GIS viewer, and ask Community Development for a pre-application meeting on a larger project.

2. Register the contractors

Send the Contractor Registration Application for each contractor, with licence, ID and insurance copies.

3. File the application

Email the Building Permit Application with the site plan, drawings and any engineering reports, and pay the application and review fees.

4. Answer review comments

Staff check zoning and building code compliance, and site layout, fire and public works where they apply. Resubmit revised plans until every department signs off.

5. Start work

Once the permit is issued, put up any erosion controls the permit requires before construction begins.

6. Inspect and occupy

Call for each inspection, pass the final, then apply for the certificate of occupancy if the building needs one.

Rather not deal with the building department?

Get a free quote →

Inspections in Bellmead

Inspections are booked by phone with Community Development. The City’s permit flow chart lists them in this order:

  • Site plan items such as setbacks and driveway location
  • Foundation
  • Framing, electrical, plumbing and HVAC rough-ins
  • Final building inspection

A failed inspection costs $55 to repeat, and an inspection of work done without a permit is $35. Fire system inspections need 24 hours’ notice to the Fire Marshal. Before a certificate of occupancy is issued, both the Building Official and the Fire Marshal must approve the building.

Local Bellmead details

Dumpsters: any job with a dumpster on site must use Frontier Waste Solutions, the City’s contracted hauler. Under Ordinance 2021-08, new commercial buildings and commercial remodels must include a dumpster enclosure; it is reviewed with the building permit at no extra fee.

Right-of-way: lane closures are allowed only from 9:00 a.m. to 3:00 p.m. with at least 2 business days’ notice. Work on North State Loop 340, I-35 or Highway 84/Bellmead Drive also needs a TxDOT permit. Right-of-way permits for driveways, sidewalks and curbs are $50, and excavation is $75 per dig.

Zoning variances: the City notes that state law allows variances only for unnecessary hardship, and the cost of complying is not a ground for one.

Annexation: owners of land just outside the city limits can petition to be brought into Bellmead; the City posts a voluntary annexation form.

Want this handled start to finish?

Get a free quote →

Texas building code

Texas has no single statewide building code: state law makes the International Residential Code the base code for homes in cities and the International Building Code the base for commercial buildings, with each city choosing the edition and its own amendments, while the National Electrical Code and the energy code apply statewide. Outside city limits most counties issue no building permits for homes. Texas building code rules

Bellmead permit search and official resources

Bellmead’s own pages, forms and code:

Inspections are where schedules slip.

Get a free quote →

Bellmead permit FAQs

How much is a building permit for a new house in Bellmead?

$200 for the first 1,000 sq ft plus $0.25 per extra square foot, and $50 for plan review. Electrical, plumbing and mechanical permits are each $0.25 per sq ft with a $200 minimum.

Do I need a permit for a fence or a shed in Bellmead?

Yes. A fence permit is $50 and a storage building is $75; a larger accessory building is $75 plus $9 per $1,000 of value.

How do I submit a permit application?

Email the completed Building Permit Application and plans to alara@bellmeadtx.gov, or bring them to City Hall at 3015 Bellmead Drive. There is no online portal.

Do contractors have to register in Bellmead?

Yes. General, solar, sign and pool contractors pay $100 a year; licensed electrical, plumbing, HVAC, fire and irrigation contractors register at no charge.

Does foundation repair need a permit?

Not for a home when the repair only stabilizes the existing foundation without removing concrete, even if new piers are installed.

What codes does Bellmead use?

The 2018 International Building, Residential, Fire, Plumbing, Mechanical, Fuel Gas, Energy and Swimming Pool codes with local amendments, and the electrical code edition adopted by the Texas Department of Licensing and Regulation.

Simplify Bellmead permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Texas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Bellmead sooner?

Let Alliance prepare, file, and track your Bellmead permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Bellmead permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.